# 1261 Howard St

Block 3729, lot 086. Page: https://www.permitgraph.org/a/3729/086

- City's use: Industrial
- Built: 1936
- Stories: 2
- Rooms: 8 bathrooms
- Building: 35,020 sq ft
- Lot: 23,440 sq ft
- Zoning: SLR
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

22 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [M1071467](https://www.permitgraph.org/p/M1071467) | Apr 25, 2019 | Never finaled: issued Apr 2019, no final | [1261 Howard St](https://www.permitgraph.org/a/3729/086) |  | street space |  |
| [201903256089](https://www.permitgraph.org/p/201903256089) | Mar 25, 2019 | Completed: final sign-off Dec 2019 | [1261 Howard St](https://www.permitgraph.org/a/3729/086) | [Bay Build Design Inc](https://www.permitgraph.org/contractor/bay-build-design-inc-919931) | title 24 for bpa #201902153065. |  |
| [M1042328](https://www.permitgraph.org/p/M1042328) | Feb 22, 2019 | Never finaled: issued Feb 2019, no final | [1261 Howard St](https://www.permitgraph.org/a/3729/086) |  | street space |  |
| [201902153065](https://www.permitgraph.org/p/201902153065) | Feb 15, 2019 | Completed: final sign-off Dec 2019 | [1261 Howard St](https://www.permitgraph.org/a/3729/086) | [Bay Build Design Inc](https://www.permitgraph.org/contractor/bay-build-design-inc-919931) | 2nd & 3rd fls: new partition walls, new finishes, remodel kitchen (2) minor ada improvements | $75,000 |
| [201811166099](https://www.permitgraph.org/p/201811166099) | Nov 16, 2018 | Completed: final sign-off Mar 2019 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) | revision to pa# 201709279668, to include title 24 plans | $2,500 |
| [M971507](https://www.permitgraph.org/p/M971507) | Aug 28, 2018 | Never finaled: issued Aug 2018, no final | [1251 Howard St](https://www.permitgraph.org/a/3729/086) |  | street space |  |
| [201806273116](https://www.permitgraph.org/p/201806273116) | Jun 27, 2018 | Completed: final sign-off May 2019 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503) | installation of a new sprinkler monitoring syste, 2 facu, 2 wireless af radio communicator, 1 smk det, 1 manual pull and 3 monitoring modules. ref 201804257484, ref sprinklers 201805259687 maher na | $5,000 |
| [201805159087](https://www.permitgraph.org/p/201805159087) | May 15, 2018 | Completed: final sign-off Oct 2018 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Pro Plumbing & Fire Sprinkler Inc](https://www.permitgraph.org/contractor/pro-plumbing-fire-sprinkler-inc-1004754) | install new fire sprinkler system througout bldg including 4" underground fire service (total sprinklers 158) ref# 201804257404 | $82,950 |
| [201804257404](https://www.permitgraph.org/p/201804257404) | Apr 25, 2018 | Completed: final sign-off Mar 2019 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) | revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at… |  |
| [201802221927](https://www.permitgraph.org/p/201802221927) | Feb 22, 2018 | Completed: final sign-off Mar 2019 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) | tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr… | $115,000 |
| [M848627](https://www.permitgraph.org/p/M848627) | Oct 27, 2017 | Never finaled: issued Oct 2017, no final | [1245 Howard St](https://www.permitgraph.org/a/3729/086) |  | street space permit |  |
| [201709279668](https://www.permitgraph.org/p/201709279668) | Sep 27, 2017 | Completed: final sign-off Mar 2019 | [1255 Howard St](https://www.permitgraph.org/a/3729/086) | [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) | interior soft demo sandblasting walls and lighting at warehouse area | $10,000 |
| [M835707](https://www.permitgraph.org/p/M835707) | Sep 26, 2017 | Never finaled: issued Sep 2017, no final | [1245 Howard St](https://www.permitgraph.org/a/3729/086) |  | street space |  |
| [201608235779](https://www.permitgraph.org/p/201608235779) | Aug 23, 2016 | Completed: final sign-off May 2017 | [1245 Howard St](https://www.permitgraph.org/a/3729/086) |  | kitchen remodel, remove/replace (e) cabinets, electric range, refrigrator, sink and reconnect (e) plumbing. cover 6' wide section of recessed non load bearing with 2x4 framing 16" o.c. to bring reces… | $450 |
| [201605026263](https://www.permitgraph.org/p/201605026263) | May 2, 2016 | Expired or cancelled: cancelled Jan 2026 | [1255 Howard St](https://www.permitgraph.org/a/3729/086) |  | change of use from (e) warehouse to fitness center. ti to establish a weight lifting fitness center. install partition wall for ada bathroom and shower. install reception counter, upgrade (e) heating… | $35,000 |
| [201103152131](https://www.permitgraph.org/p/201103152131) | Mar 15, 2011 | Completed: final sign-off Jun 2011 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) | [Pmk Construction](https://www.permitgraph.org/contractor/pmk-construction-809033) | barrier removal includes renovation of (2) existing restrooms, new guardrail at mezzzanine and new handrails @ rear stair. new break area. remove non code required second stair from mezzanine, reloca… | $12,000 |
| [201012227201](https://www.permitgraph.org/p/201012227201) | Dec 22, 2010 | Completed: final sign-off May 2011 | [1245 Howard St](https://www.permitgraph.org/a/3729/086) | [Ncr Construction Inc](https://www.permitgraph.org/contractor/ncr-construction-inc-465489) | revision to pa# 2010-0603-3780-delete installation of new restroom from scope of work |  |
| [201007156742](https://www.permitgraph.org/p/201007156742) | Jul 15, 2010 | Expired or cancelled: cancelled Jan 2026 | [1251 Howard St](https://www.permitgraph.org/a/3729/086) |  | first floor. barrier removal includes renovation of 2 existing restrooms, new restroom, new guardrail and stair handrails. | $12,000 |
| [201006033780](https://www.permitgraph.org/p/201006033780) | Jun 3, 2010 | Completed: final sign-off May 2011 | [1245 Howard St](https://www.permitgraph.org/a/3729/086) | [Ncr Construction Inc](https://www.permitgraph.org/contractor/ncr-construction-inc-465489) | office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant . | $12,000 |
| [200502024616](https://www.permitgraph.org/p/200502024616) | Feb 2, 2005 | Completed: final sign-off Apr 2005 | [1261 Howard St](https://www.permitgraph.org/a/3729/086) | [Wrenwood O'brien Construction Inc](https://www.permitgraph.org/contractor/wrenwood-o-brien-construction-inc-841821) | new server room/3 partition walls partial upgrade of bthrm to be ada complaint/access ladder | $12,000 |
| [200305215174](https://www.permitgraph.org/p/200305215174) | May 21, 2003 | Completed: final sign-off Jan 2004 | [1261 Howard St](https://www.permitgraph.org/a/3729/086) |  | tenant improvement to 3rd floor, unisex bathroom,conf room, design/biod hvav system and design build | $46,970 |
| [200108166208](https://www.permitgraph.org/p/200108166208) | Aug 16, 2001 | Completed: final sign-off Jan 2003 | [1263 Howard St](https://www.permitgraph.org/a/3729/086) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | seismic renovation of ground, second and third floors, work includes (2) new ada compliant toilet ra | $460,795 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) (4), [Bay Build Design Inc](https://www.permitgraph.org/contractor/bay-build-design-inc-919931) (2), [Ncr Construction Inc](https://www.permitgraph.org/contractor/ncr-construction-inc-465489) (2), [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503), [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655), [Pmk Construction](https://www.permitgraph.org/contractor/pmk-construction-809033), [Pro Plumbing & Fire Sprinkler Inc](https://www.permitgraph.org/contractor/pro-plumbing-fire-sprinkler-inc-1004754), [Wrenwood O'brien Construction Inc](https://www.permitgraph.org/contractor/wrenwood-o-brien-construction-inc-841821)
- Architects: [Ben Farrell](https://www.permitgraph.org/professional/ben-farrell-C29919) (2), [Amber Evans](https://www.permitgraph.org/professional/amber-evans-C12094)
- Engineers: [Raymond S Situ](https://www.permitgraph.org/professional/raymond-s-situ-C64647)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3729/086.