# 1019 Mission St

Block 3726, lot 111. Page: https://www.permitgraph.org/a/3726/111

- City's use: Industrial
- Built: 1915
- Stories: 3
- Rooms: 3 bathrooms
- Building: 12,000 sq ft
- Lot: 4,000 sq ft
- Zoning: WMUG
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

15 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202204252907](https://www.permitgraph.org/p/202204252907) | Apr 25, 2022 | Expired or cancelled: cancelled Jan 2026 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | revision to 2014-1021-9511 t.i. on 1st fl: change of use from manufacturing to pharmacy retail sales, mep & lighting to be deferred. new work will not affect (e) fire sprinkler layout. | $28,000 |
| [202203079340](https://www.permitgraph.org/p/202203079340) | Mar 7, 2022 | Expired or cancelled: withdrawn Apr 2022 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | modify (e) interior partitions at 1/f (n) office spaces. | $20,000 |
| [201911207819](https://www.permitgraph.org/p/201911207819) | Nov 20, 2019 | Never finaled: issued Nov 2019, no final | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | to obtain final inspection for work approved under pa 201410219511. all work is complete |  |
| [M748927](https://www.permitgraph.org/p/M748927) | Dec 22, 2016 | Never finaled: issued Dec 2016, no final | [1021 Mission St](https://www.permitgraph.org/a/3726/111) |  | per pa #201410219511, add addresses to block 3726, lot 111 as; 1021a, 1021b mission street. |  |
| [201410219511](https://www.permitgraph.org/p/201410219511) | Oct 21, 2014 | Never finaled: issued Nov 2014, no final | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | modify (e) partitions at first floor to provide for (n) office space, (n) bathroom, and (n) interior stairs. n/a maher ordinance | $20,000 |
| [201409226913](https://www.permitgraph.org/p/201409226913) | Sep 22, 2014 | Expired or cancelled: withdrawn Nov 2014 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | modify (e) partitions on the first floor to provide (n) bathroom, (n) conference room, and (n) interior stairs. modify entrance on minna street. | $19,000 |
| [201312315414](https://www.permitgraph.org/p/201312315414) | Dec 31, 2013 | Expired or cancelled: cancelled Jan 2020 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | modify (e) partitions at 2nd flr to provide (n) interior stair to roof. provide (n) roof opening for future stair penthouse (install only a roof hatch at this time). construct steel structure on (e)… | $30,000 |
| [201205090107](https://www.permitgraph.org/p/201205090107) | May 9, 2012 | Completed: final sign-off Dec 2012 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | tenant improvement for existing office space. no structural work. remove existing non-bearing partitions. install new partitions and spiral stair. relocate two conderser units. | $30,000 |
| [201103162228](https://www.permitgraph.org/p/201103162228) | Mar 16, 2011 | Expired or cancelled: cancelled Jan 2026 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  |  | $2,000 |
| [201004271146](https://www.permitgraph.org/p/201004271146) | Apr 27, 2010 | Completed: final sign-off Dec 2010 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | tenant improvement for (e) office space. no structural work. remove (e) non-bearing partitions. install (n) partitions and ada bathroom. mep & sprinkler under separate permit. no exterior changes. | $110,000 |
| [200904105993](https://www.permitgraph.org/p/200904105993) | Apr 10, 2009 | Completed: final sign-off Mar 2010 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | renew pa# 2005/03/18/7841 to obtain final inspection. all work has been completed. |  |
| [M64444](https://www.permitgraph.org/p/M64444) | Apr 17, 2007 | Never finaled: issued Apr 2007, no final | [1021 Mission St](https://www.permitgraph.org/a/3726/111) |  | street space permit |  |
| [200612270585](https://www.permitgraph.org/p/200612270585) | Dec 27, 2006 | Never finaled: issued Dec 2006, no final | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | to renew pae2005/03/18/7841 for final inspection. |  |
| [200505243353](https://www.permitgraph.org/p/200505243353) | May 24, 2005 | Expired or cancelled: expired Mar 2007 | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | scope of work/modify extg bthrm at 1st flr & 2nd floor/revision to app #200503187841 for correction | $1,000 |
| [200503187841](https://www.permitgraph.org/p/200503187841) | Mar 18, 2005 | Never finaled: issued Mar 2005, no final | [1019 Mission St](https://www.permitgraph.org/a/3726/111) |  | remove (e) mezz. floor (non conforming) @ 2nd story. remove (e) conduit @ basement level, modify (e) | $10,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) (2)
- Architects: [Suheil Shatara](https://www.permitgraph.org/professional/suheil-shatara-C24700) (3), [Yi-Tso Jeff Chen](https://www.permitgraph.org/professional/yi-tso-jeff-chen-C17977) (3), [James Mano Scott](https://www.permitgraph.org/professional/james-mano-scott-C19931)
- Authorized agents: [Velba Villanueva](https://www.permitgraph.org/professional/velba-villanueva-17977)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.