# 119 07th St

Block 3726, lot 103. Page: https://www.permitgraph.org/a/3726/103

The city's assessor roll has no record for this parcel.

## Permits filed here

31 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202105190620](https://www.permitgraph.org/p/202105190620) | May 19, 2021 | Completed: final sign-off Mar 2022 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) | red cloud installed the sf errcs compliant bda & donor antenna before the job finished construction. this is the as-built to permit #2014-0624-9298-s9. |  |
| [202102184974](https://www.permitgraph.org/p/202102184974) | Feb 18, 2021 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm as built; 1 new facp, 1 remote led annunciator, 8 nac panels, 1 heat detector, 26 relay modules, 15 dual monitor modules, 19 duct detectors, 31 smoke detectors, 2 pull stations, 23 monitor… | $80,000 |
| [202009254999](https://www.permitgraph.org/p/202009254999) | Sep 25, 2020 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | revision to issue fuel oil / generator pa# 201908148712. generator connection to fire pump. generator spill containment. generator vent caps. ** maher: n/a ** |  |
| [202007160330](https://www.permitgraph.org/p/202007160330) | Jul 16, 2020 | Never finaled: filed Jul 2020, never issued | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | refer to 201406249298 s5. revisions to fire alarm permit drawings. added monitoring points required for fuel oil & generator system. relocation of fire alarm control panel. miscellaneous component lo… | $80,000 |
| [M1209187](https://www.permitgraph.org/p/M1209187) | Jun 11, 2020 | Never finaled: issued Jul 2020, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [M1190288](https://www.permitgraph.org/p/M1190288) | Feb 4, 2020 | Never finaled: issued Feb 2020, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [201912199973](https://www.permitgraph.org/p/201912199973) | Dec 19, 2019 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | revision to pa 2014-0624-9298 addenda 3 to document ab-009 for property line windows at 7th and 8th floor. |  |
| [M1164387](https://www.permitgraph.org/p/M1164387) | Nov 12, 2019 | Never finaled: issued Nov 2019, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [201910043637](https://www.permitgraph.org/p/201910043637) | Oct 4, 2019 | Never finaled: issued Nov 2019, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | revision to pa 2014-0624-9298 addition of rated shaft for fuel oil line and rated enclosure for fuel oil fill station. rated enclosure, 2 hr. | $15,000 |
| [201908269869](https://www.permitgraph.org/p/201908269869) | Aug 26, 2019 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | revision to 201406249298. parking layout changes, reduce parking and change storage room and bike storage layout. |  |
| [201908148712](https://www.permitgraph.org/p/201908148712) | Aug 14, 2019 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673), [Iron Mechanical Inc](https://www.permitgraph.org/contractor/iron-mechanical-inc-934181) | install remote fill to supply diesel fuel to a generator on roof. generator install by others. the fill operation and leak detection will be maintained by a new control panel reference to building pe… | $22,500 |
| [M1085847](https://www.permitgraph.org/p/M1085847) | May 28, 2019 | Never finaled: issued May 2019, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space w/mta |  |
| [M1080607](https://www.permitgraph.org/p/M1080607) | May 15, 2019 | Never finaled: filed May 2019, never issued | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [M1005707](https://www.permitgraph.org/p/M1005707) | Nov 14, 2018 | Never finaled: issued Dec 2018, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | streetspace |  |
| [M955507](https://www.permitgraph.org/p/M955507) | Jul 26, 2018 | Never finaled: issued Jul 2018, no final | [111 07th St](https://www.permitgraph.org/a/3726/103) |  | per pa #201406249298, establish new address to new bldg at block 3726, lot 103 as; 586, 588 minna street and 111 7th street |  |
| [M931867](https://www.permitgraph.org/p/M931867) | May 29, 2018 | Never finaled: issued May 2018, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [201711214531](https://www.permitgraph.org/p/201711214531) | Nov 21, 2017 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ref: appln #201406249298. provide (n) 2-way communication system. add (1) main base station. add (8) call stations. add (1) monitoring module for trouble/power loss | $20,250 |
| [M846087](https://www.permitgraph.org/p/M846087) | Oct 19, 2017 | Never finaled: issued Oct 2017, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space w/mta |  |
| [201704285243](https://www.permitgraph.org/p/201704285243) | Apr 28, 2017 | Completed: final sign-off Sep 2020 | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | revision to 201611213224, 201406249298 s1. revise plans due to creane and manlift opening original permit pa#2014-06-24-9298 s-1 was not reviewed by sffd _foundation work only. maher n/a |  |
| [201704133915](https://www.permitgraph.org/p/201704133915) | Apr 13, 2017 | Completed: final sign-off Oct 2020 | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | provide tower crane foundation plans. | $20,000 |
| [M777367](https://www.permitgraph.org/p/M777367) | Apr 12, 2017 | Never finaled: issued Apr 2017, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space & mta |  |
| [201611213224](https://www.permitgraph.org/p/201611213224) | Nov 21, 2016 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | revision to pa 2014-0624-9298/s1 revise reinforcement at the north edge of the concrete mat foundation. maher na |  |
| [M704848](https://www.permitgraph.org/p/M704848) | Jul 13, 2016 | Never finaled: issued Jul 2016, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space permit - renewal of permit # m689587 |  |
| [201607112036](https://www.permitgraph.org/p/201607112036) | Jul 11, 2016 | Completed: final sign-off Sep 2020 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | excavation and shoring shall occur on this lot (119 7th st) in order to allow foundation work to be done on the adjacent lot#105 (1095 mission/2016-07-11-2015) & lot#106 (1087-1089 mission st/2016-07… |  |
| [201607112042](https://www.permitgraph.org/p/201607112042) | Jul 11, 2016 | Expired or cancelled: withdrawn Aug 2016 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | excavations and shoring shall occur on this lot (119 7th st)in order to allow foundation work on the adjacent lot (1095 mission st) maher not req |  |
| [M697227](https://www.permitgraph.org/p/M697227) | Jun 9, 2016 | Never finaled: issued Jun 2016, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [M689587](https://www.permitgraph.org/p/M689587) | May 10, 2016 | Never finaled: issued May 2016, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [M686807](https://www.permitgraph.org/p/M686807) | May 2, 2016 | Never finaled: filed May 2016, never issued | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | street space |  |
| [201508204876](https://www.permitgraph.org/p/201508204876) | Aug 20, 2015 | Completed: final sign-off Sep 2020 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) | temporary earth shoring system to accommodate earthwork for new construction . new construction under pa#201406249298. n/a for maher ordinance. | $250,000 |
| [201406249298](https://www.permitgraph.org/p/201406249298) | Jun 24, 2014 | Completed: final sign-off Jun 2021 | [119 07th St](https://www.permitgraph.org/a/3726/103) | [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673), [Lend Lease (Us) Construction Inc](https://www.permitgraph.org/contractor/lend-lease-us-construction-inc-483550) | erect new mixed-used 8 story 39 residential units apartment/parking lot. maher ordinane is not required. | $17,237,620 |
| [M494707](https://www.permitgraph.org/p/M494707) | Jun 10, 2014 | Never finaled: issued Jun 2014, no final | [119 07th St](https://www.permitgraph.org/a/3726/103) |  | new address at parking lot as; 119 7th street to block 3726, lot 103. |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Fpc Builders Inc](https://www.permitgraph.org/contractor/fpc-builders-inc-1000673) (8), [Iron Mechanical Inc](https://www.permitgraph.org/contractor/iron-mechanical-inc-934181), [Lend Lease (Us) Construction Inc](https://www.permitgraph.org/contractor/lend-lease-us-construction-inc-483550), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218), [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919)
- Architects: [William Higgins](https://www.permitgraph.org/professional/william-higgins-C15845) (2), [William J Higgins](https://www.permitgraph.org/professional/william-j-higgins-15845)
- Engineers: [Joseph Fay](https://www.permitgraph.org/professional/joseph-fay-E10951), [Kevin O'connor](https://www.permitgraph.org/professional/kevin-o-connor-C65297), [Lori Lee](https://www.permitgraph.org/professional/lori-lee-M26114), [Marc A Press](https://www.permitgraph.org/professional/marc-a-press-3054), [Peter Geissler](https://www.permitgraph.org/professional/peter-geissler-C44320)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3726/103.