# 139 06th St

Block 3725, lot 063. Page: https://www.permitgraph.org/a/3725/063

- City's use: Commercial Hotel
- Built: 1909
- Stories: 4
- Units: 3
- Rooms: 13 bathrooms
- Building: 15,000 sq ft
- Lot: 3,750 sq ft
- Zoning: RSD
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

46 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202412207215](https://www.permitgraph.org/p/202412207215) | Dec 20, 2024 | In progress: issued Dec 2024 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | to verify existing levels in sleeping areas complying with sffc section 1103.7.6.1. indicating the dba reading in each living area and sleeping area of at least 75 dba. |  |
| [202104017750](https://www.permitgraph.org/p/202104017750) | Apr 1, 2021 | Never finaled: issued Apr 2022, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Esquivel Grading & Paving, Inc.](https://www.permitgraph.org/contractor/esquivel-grading-paving-inc-463185) | alteration of subsidewalk basement roof slab to install new sidewalk | $100,000 |
| [201804176610](https://www.permitgraph.org/p/201804176610) | Apr 17, 2018 | Completed: final sign-off Apr 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [A C Contracting](https://www.permitgraph.org/contractor/a-c-contracting-779046) | to obtain final inspection for work approved under pa#201208177647. all work is complete. |  |
| [201612286060](https://www.permitgraph.org/p/201612286060) | Dec 28, 2016 | Expired or cancelled: withdrawn Apr 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | basement corridor with 2 multipurpose rooms, toilet rm & laundry, ground floor new servery room, change occupancy from r-2 to 42.1. | $75,000 |
| [201211013301](https://www.permitgraph.org/p/201211013301) | Nov 1, 2012 | Completed: final sign-off Mar 2014 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | new addition to existing system -1 stobe added and 1 relocated on ground floor. 4 strobes on 3rd & 4th floor in bathroom. 4 weather proof in new showers on 3rd & 4th floor, new devices will tie into… | $2,000 |
| [201208177649](https://www.permitgraph.org/p/201208177649) | Aug 17, 2012 | Expired or cancelled: expired Apr 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [A C Contracting](https://www.permitgraph.org/contractor/a-c-contracting-779046) | reconstruct a sidewalk area of approx 4 ft by 18 ft to city standards. sidewalk basement leaks. | $11,500 |
| [201207306003](https://www.permitgraph.org/p/201207306003) | Jul 30, 2012 | Never finaled: issued Jul 2012, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Chen's Plumbing Inc](https://www.permitgraph.org/contractor/chen-s-plumbing-inc-665412) | - add 20 sprinkler heads at ground floor, third & fourth floor , to use existing 4" fire service water meter. for fire only. | $8,000 |
| [M323107](https://www.permitgraph.org/p/M323107) | May 22, 2012 | Never finaled: issued May 2012, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space permit. |  |
| [201204047554](https://www.permitgraph.org/p/201204047554) | Apr 4, 2012 | Completed: final sign-off Jan 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | revision to 201111219340. add new stair to replace existing from gr floor to basement. | $6,000 |
| [M306127](https://www.permitgraph.org/p/M306127) | Mar 6, 2012 | Never finaled: issued Mar 2012, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space with meters. |  |
| [201111219343](https://www.permitgraph.org/p/201111219343) | Nov 21, 2011 | Completed: final sign-off Jan 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | interior gr floor remodel. new partitions to create an exit corridor to front. new community room, and resident manager office. includes electrical, plumbing under sep permit | $50,000 |
| [201111219340](https://www.permitgraph.org/p/201111219340) | Nov 21, 2011 | Completed: final sign-off Jan 2018 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | 3rd & 4th floor - total 4 new toilet rooms & 4 new showers on 3rd and 4th floors. includes lights & exhaust fans. 2 toilet rooms and 2 showers on each floor. | $18,000 |
| [201105236638](https://www.permitgraph.org/p/201105236638) | May 23, 2011 | Completed: final sign-off May 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | renew of pa #200708089145 to obtain final inspection. all work is complete. |  |
| [201105236637](https://www.permitgraph.org/p/201105236637) | May 23, 2011 | Completed: final sign-off May 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | renewal of 200910078533 to obtain final inspection; all work complete |  |
| [201105236634](https://www.permitgraph.org/p/201105236634) | May 23, 2011 | Completed: final sign-off May 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | renew of pa #200905208824 to obtain final inspection. all work is complete. |  |
| [201009301974](https://www.permitgraph.org/p/201009301974) | Sep 30, 2010 | Completed: final sign-off Jan 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | revision to 20051118046 and 201007136438, commercial units 139 and 143. to include e restroom improvments and lighting upgrades. will remain vacant until future tenant improvement | $4,000 |
| [201007227265](https://www.permitgraph.org/p/201007227265) | Jul 22, 2010 | Completed: final sign-off Jan 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | remove existing sheetrock and replace with new sheetrock in commercial stores. no other work | $5,000 |
| [201007136438](https://www.permitgraph.org/p/201007136438) | Jul 13, 2010 | Completed: final sign-off May 2011 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | to obtain final inspection for work approved under appl#200511148046. all work is complete. |  |
| [201007025931](https://www.permitgraph.org/p/201007025931) | Jul 2, 2010 | Completed: final sign-off Jul 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | obtaining permit for emergency evacutation signs- 9 signs on floors 2,3 and 4 | $200 |
| [201006084062](https://www.permitgraph.org/p/201006084062) | Jun 8, 2010 | Completed: final sign-off Jul 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Liu Plumbing](https://www.permitgraph.org/contractor/liu-plumbing-904744) | obtain permit for 3 heads for the garbage chute to comply with sprinkler ordimance and complaint# 200141309 of 5/7/03 | $1,500 |
| [201003027438](https://www.permitgraph.org/p/201003027438) | Mar 2, 2010 | Completed: final sign-off Jun 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as built to reflect add of 3 duct protectors, 7 point module, 6 strobes. reference pa #200612220450 & pa #201003027434 (renew of 0450) | $1,500 |
| [201003027434](https://www.permitgraph.org/p/201003027434) | Mar 2, 2010 | Completed: final sign-off Jun 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | to obtain final inspection 2006122204050 |  |
| [200911060768](https://www.permitgraph.org/p/200911060768) | Nov 6, 2009 | Completed: final sign-off Jul 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | install garbage chute in (e) brick court yard @ 2nd, 3rd, 4th floor. required fire smoke detector and required sprinklers (2) on seperate permit. | $9,500 |
| [200910078533](https://www.permitgraph.org/p/200910078533) | Oct 7, 2009 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | strengthen front wall of basement, install accessible door in basement. revision to pa# 2009-0520-8824. | $5,000 |
| [200908144898](https://www.permitgraph.org/p/200908144898) | Aug 14, 2009 | Completed: final sign-off Jul 2010 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | to submit revised drawings per inspector's request under pa# 2009/03/31/5260. mechanical system revision on all floors. |  |
| [200905208824](https://www.permitgraph.org/p/200905208824) | May 20, 2009 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | install steel posts basement to accessible (4 posts). remodel door to basement to accessible. install accessible handrail to basement stairs. to comply with nov. 200341309. | $10,000 |
| [200903315260](https://www.permitgraph.org/p/200903315260) | Mar 31, 2009 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | renew pa# 2006/08/15/9573 to obtain final inspection. all work has been completed. |  |
| [200902252851](https://www.permitgraph.org/p/200902252851) | Feb 25, 2009 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | to obtain final inspection for work approved under pa#200804240582. all work completed. |  |
| [200804240582](https://www.permitgraph.org/p/200804240582) | Apr 24, 2008 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | renew pa#200511148046 & pa#200705040488 for final inspection. |  |
| [M99164](https://www.permitgraph.org/p/M99164) | Dec 13, 2007 | Never finaled: issued Dec 2007, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space |  |
| [M91345](https://www.permitgraph.org/p/M91345) | Oct 17, 2007 | Never finaled: issued Oct 2007, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space |  |
| [200709051854](https://www.permitgraph.org/p/200709051854) | Sep 5, 2007 | Completed: final sign-off Jul 2008 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Fire Protection Retrofit Specialist](https://www.permitgraph.org/contractor/fire-protection-retrofit-specialist-638976) | to install fire sprinkler system to comply with ord # 170-02 for pa # 2007/02/28/5095 (as built) to comply with nov # 200341309 and 200563877. |  |
| [M83788](https://www.permitgraph.org/p/M83788) | Aug 28, 2007 | Never finaled: issued Aug 2007, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space permit only. |  |
| [200708281153](https://www.permitgraph.org/p/200708281153) | Aug 28, 2007 | Expired or cancelled: withdrawn Sep 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | to remodel the ground floor by creating a corridor & a community kitchen so that the residents have cooking facilities. as of now, there are none. this remodel will help to minimize fire due to cooki… | $10,000 |
| [200708089145](https://www.permitgraph.org/p/200708089145) | Aug 8, 2007 | Expired or cancelled: expired Jun 2009 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | install 3 accessible bthrooms. install masonry wall basement & 1st floor. | $40,000 |
| [200705040488](https://www.permitgraph.org/p/200705040488) | May 4, 2007 | Expired or cancelled: expired Dec 2007 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | to comply with his nov# 200563877 dated 11/04/2005. to complete work under pa# 2005/11/14/8046. | $20,000 |
| [200702285095](https://www.permitgraph.org/p/200702285095) | Feb 28, 2007 | Completed: final sign-off Jul 2008 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Fire Protection Retrofit Specialist](https://www.permitgraph.org/contractor/fire-protection-retrofit-specialist-638976) | to install fire sprinkler system. to comply with ord #170-02. to comply with his nov #200341309 dated 5/7/2003 and #200563877 dated 11/4/2005. | $29,000 |
| [200612220450](https://www.permitgraph.org/p/200612220450) | Dec 22, 2006 | Expired or cancelled: expired May 2009 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | installation of new fire alarm system and sprinkler monitoring. | $15,000 |
| [200608159573](https://www.permitgraph.org/p/200608159573) | Aug 15, 2006 | Expired or cancelled: expired Oct 2012 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | new heating and ventilatioin system: new boiler, hhw plumps, hhw piping system, radiators, t'stats, controller/timer, toilet exhaust fans, ductwork, fan coils. | $105,000 |
| [M37952](https://www.permitgraph.org/p/M37952) | Jun 6, 2006 | Never finaled: issued Jun 2006, no final | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | street space permit |  |
| [200511148046](https://www.permitgraph.org/p/200511148046) | Nov 14, 2005 | Expired or cancelled: expired Apr 2007 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | fire repair damage to be taken care of replacing all charred wood, replace interior walls, rplace windows and doors, install insulation, comply with nov 200563877. some windows in front of bldg. prov… | $105,000 |
| [200309023662](https://www.permitgraph.org/p/200309023662) | Sep 2, 2003 | Expired or cancelled: expired Jan 2006 | [149 06th St](https://www.permitgraph.org/a/3725/063) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | install complete fire sprinkler system approx 130 heads, to comply w/his nov 200341309 | $21,600 |
| [200303280996](https://www.permitgraph.org/p/200303280996) | Mar 28, 2003 | Completed: final sign-off Jun 2003 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Occidental Express](https://www.permitgraph.org/contractor/occidental-express-319153) | soft demo & boarding up to comply w/ n.o.v.#200113646.fire damage work.for securing bldg. & clean up | $5,000 |
| [200201116712](https://www.permitgraph.org/p/200201116712) | Jan 11, 2002 | Expired or cancelled: expired May 2002 | [139 06th St](https://www.permitgraph.org/a/3725/063) | [Occidental Express](https://www.permitgraph.org/contractor/occidental-express-319153) | to renew app#2001/04/26/2382 for remaining work. | $500 |
| [200106262382](https://www.permitgraph.org/p/200106262382) | Jun 26, 2001 | Expired or cancelled: expired Oct 2001 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | revision to approved building permit#2001/01/26/0731. removal of abandoned contents & debris & secu | $3,500 |
| [200101260731](https://www.permitgraph.org/p/200101260731) | Jan 26, 2001 | Expired or cancelled: cancelled Oct 2024 | [139 06th St](https://www.permitgraph.org/a/3725/063) |  | make safe ater fire: install plywood with support boards . all windows , doors, all floors, |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) (5), [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) (4), [A C Contracting](https://www.permitgraph.org/contractor/a-c-contracting-779046) (2), [Fire Protection Retrofit Specialist](https://www.permitgraph.org/contractor/fire-protection-retrofit-specialist-638976) (2), [Occidental Express](https://www.permitgraph.org/contractor/occidental-express-319153) (2), [Chen's Plumbing Inc](https://www.permitgraph.org/contractor/chen-s-plumbing-inc-665412), [Esquivel Grading & Paving, Inc.](https://www.permitgraph.org/contractor/esquivel-grading-paving-inc-463185), [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912), [Liu Plumbing](https://www.permitgraph.org/contractor/liu-plumbing-904744)
- Architects: [Ronald Anthony Perner](https://www.permitgraph.org/professional/ronald-anthony-perner-C4452) (5), [Levi F. Malabuyo](https://www.permitgraph.org/professional/levi-f-malabuyo-M26141)
- Engineers: [Philip Whitehead](https://www.permitgraph.org/professional/philip-whitehead-C30996)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3725/063.