# 519 Mission St

Block 3721, lot 087. Page: https://www.permitgraph.org/a/3721/087

- City's use: Commercial Office
- Built: 1988
- Stories: 27
- Lot: 7,700 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

87 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202610079121](https://www.permitgraph.org/p/202610079121) | Oct 7, 2026 | In progress: filed Oct 2026, not yet issued | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | scope of work to install (4) ev chargers for street level garage | $8,000 |
| [202410293968](https://www.permitgraph.org/p/202410293968) | Oct 29, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | ste 170: revision to 202406033553: administrative permit to edit plans to reflect existing. |  |
| [202410233556](https://www.permitgraph.org/p/202410233556) | Oct 23, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 1/f: suite 170. rev 202408158756: health review only for new storefront. |  |
| [202408158756](https://www.permitgraph.org/p/202408158756) | Aug 15, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 1st fl/ ste 170: demo of a temporary storefront system & contruction of new storefront to included new door & service window | $30,000 |
| [202406033553](https://www.permitgraph.org/p/202406033553) | Jun 3, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | commercial tenant improvement of a limited service restaurant with limited food prep. no change in occupancy. area of remodel is limited to the first floor, ste 170. demo (e) floors and ceiling. cons… | $130,000 |
| [202405162265](https://www.permitgraph.org/p/202405162265) | May 16, 2024 | Completed: final sign-off Mar 2025 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | scope of work to include the demolition of extg restroom plumbing and accessories and the installation of new plmg, accessories, and ada compliant signage. | $60,000 |
| [202404240623](https://www.permitgraph.org/p/202404240623) | Apr 24, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | ref 202401083577-12/f office ti for mep trade work to include replace lighting fixtures, circuits, signal devices and rewiring. add and relocated ceiling diffusers and grills. add sidewall supply and… | $75,000 |
| [202404099593](https://www.permitgraph.org/p/202404099593) | Apr 9, 2024 | Completed: final sign-off Jul 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 12/f: this is a fire alarm tenant improvement. add (9) led speaker strobes-ceiling mounted. ref# 202401083577. | $14,494 |
| [202403228406](https://www.permitgraph.org/p/202403228406) | Mar 22, 2024 | Completed: final sign-off May 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | ref pa# 202403188058 fire sprinklers; delete 1 pendent and relocate 1 pendent on the 3rd fl | $1,200 |
| [202403198149](https://www.permitgraph.org/p/202403198149) | Mar 19, 2024 | Completed: final sign-off May 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 12/f ste 1250: fire sprinklers - relocate 20 pendents and 6 uprights. ref ti permit 202401083577 | $15,000 |
| [202403188058](https://www.permitgraph.org/p/202403188058) | Mar 18, 2024 | Completed: final sign-off Oct 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3/f: rev to pa# 2023-1221-2905; not to build the demising wall |  |
| [202401083577](https://www.permitgraph.org/p/202401083577) | Jan 8, 2024 | Completed: final sign-off Nov 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th fl: demo non-structural walls, ceiling, lighting, millwork, door, glazing, finishes. construct new non-structural walls, millwork, ceiling, lighting & finishes. | $150,000 |
| [202312212905](https://www.permitgraph.org/p/202312212905) | Dec 21, 2023 | Completed: final sign-off Oct 2024 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3/f: demolish e non structural walls, glazing, door, power and signal, patch and match finishes,construct demising wall, glazing and install a few light fixtures to match existing. rework hvac as req | $150,000 |
| [202005147537](https://www.permitgraph.org/p/202005147537) | May 14, 2020 | Completed: final sign-off Oct 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1/f & 2/f: fire alarm add (7) new high power control relay for turnstile. add (1) new high power control relay for security interface. bldg permit #202003096516 | $13,080 |
| [202003136961](https://www.permitgraph.org/p/202003136961) | Mar 13, 2020 | Completed: final sign-off Oct 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 17th fl - ti add 1 booster power supply, 1 smoke detector, 14 duct smoke detector, 14 high power control relay, 6 smoke detector, 31 speaker strobes, 1 ceiling strobe, 2 rath call stations | $41,472 |
| [202003136963](https://www.permitgraph.org/p/202003136963) | Mar 13, 2020 | Never finaled: issued Mar 2020, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 16th fl - modife (e) fire alarm & 2 way communication systems. add 1 booster power supply, 2 smoke detectors, 15 duct smoke detectors, 15 high power control relays, 1 dual input module, 1 smoke detec… | $82,945 |
| [202003096516](https://www.permitgraph.org/p/202003096516) | Mar 9, 2020 | Completed: final sign-off Oct 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908) | installing new security turnstiles @ 1st & 2nd fl elevator lobbies, moving elevator kiosk screens on 1st fl and installing new accessible closer and wireless push buttons/activator bar at exist onto… | $350,000 |
| [202002194802](https://www.permitgraph.org/p/202002194802) | Feb 19, 2020 | Completed: final sign-off Aug 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | fire alarm for 24th fl: modify existing fa system & 2-way communication system. add 1 power supply, 28 ceiling speaker/strobes, 1 smoke detector, 13 duct smoke detectors, 12 high powered control rela… | $30,896 |
| [201911258089](https://www.permitgraph.org/p/201911258089) | Nov 25, 2019 | Completed: final sign-off May 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 25th flr: restroom upgrades @ men's restroom. reconfigure (e) urinal. provide new non-ada toilet stall, plumbing fixtures, & accessories. (e) lavatories & accessible stall to remain. construction @ c… | $53,817 |
| [201910093951](https://www.permitgraph.org/p/201910093951) | Oct 9, 2019 | Completed: final sign-off Jan 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | accessibility improvements to the restrooms on the 24th flr. barrier removal only. deferred: fire/life safety/mep | $85,000 |
| [201908027695](https://www.permitgraph.org/p/201908027695) | Aug 2, 2019 | Completed: final sign-off Nov 2020 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | exterior gate & fence 5'7" high at top of stair from mission st. | $50,000 |
| [201811075224](https://www.permitgraph.org/p/201811075224) | Nov 7, 2018 | Completed: final sign-off Jun 2019 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ti project on modification of (e) fire alarm system for floors 5,9,10 and 11 modification shall include providing notification coverage throughout and duct detectors at fpb units ref pa 5th fl -2018-… | $103,949 |
| [201809129862](https://www.permitgraph.org/p/201809129862) | Sep 12, 2018 | Completed: final sign-off Dec 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | demo and install hvac equipment and ductwork as shown on 3m2.1 provide new lighting and branch circuiting to (e) panel. maintain some of the existing power and signal outlets and provide additional n… | $21,541 |
| [201809129861](https://www.permitgraph.org/p/201809129861) | Sep 12, 2018 | Completed: final sign-off Dec 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | add supply and return diffusers, relocate t-stat, add new ductwork, add transer fan and air balance. lighting, power and signal wiring, lighting controls. modifications to match the new architectural… | $35,800 |
| [201809129864](https://www.permitgraph.org/p/201809129864) | Sep 12, 2018 | Completed: final sign-off Nov 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 2nd fl: install new hvac ductwork and equipment as shown on 2m2.1. provide new lighting and branch circuiting to existing panel. no new fire smoke dampers. ref pa 2018-0607-1283 | $19,780 |
| [201808217834](https://www.permitgraph.org/p/201808217834) | Aug 21, 2018 | Completed: final sign-off Oct 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | fire alarm ti 22nd floor permit #201807195028. provide modification of existing fire alarm system. demo (3) existing ceiling spekers. demo (3) existing wall strobes. add (3) new speaker/strobe. 22nd… | $9,120 |
| [201807195028](https://www.permitgraph.org/p/201807195028) | Jul 19, 2018 | Completed: final sign-off Dec 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 22nd floor: mep, life safety, fire sprinklers & alarm deferred, demo of partitions, millwork finishes, ceiling & lighting fixtures, construction to include partions (non-structural) ceiling and tile,… | $218,000 |
| [201807194932](https://www.permitgraph.org/p/201807194932) | Jul 19, 2018 | Completed: final sign-off Dec 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd fl - merging with neighbor unit- finish removal, construction of new non-structural partitions, new finishes, restroom accessibility upgrades (tenant work) mep, sprinklers and fire alarm separte… | $123,992 |
| [201807164615](https://www.permitgraph.org/p/201807164615) | Jul 16, 2018 | Completed: final sign-off Aug 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suites | $30,000 |
| [201806071283](https://www.permitgraph.org/p/201806071283) | Jun 7, 2018 | Completed: final sign-off Nov 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 2nd fl - restroom upgrades. scope includes demo of (e) wall and column. provide new all gender restroom and urinal. plumbing fixtures and accessories as well as finishes, ceiling and lighting | $62,000 |
| [201806061143](https://www.permitgraph.org/p/201806061143) | Jun 6, 2018 | Expired or cancelled: cancelled Nov 2022 | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | 201805108727installation of two stem 66k/117.5kwh lithiumm ion battery energy storage units,this will be utilized to offset peak demand charges by discharging during periods of high demand. the monit… | $26,309 |
| [201802211804](https://www.permitgraph.org/p/201802211804) | Feb 21, 2018 | Completed: final sign-off Apr 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | restroom accessibility improvements on the 14th fl. scope of work includes install new stall partitions & new drinking fountain and re-install existing accessories to be code compliant. | $55,278 |
| [201711093556](https://www.permitgraph.org/p/201711093556) | Nov 9, 2017 | Completed: final sign-off Dec 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | 25th floor fire sprinkler t.i.: 4 relocated pendent, 5 added pendent, & one deleted. ref pa #201706300796. | $3,900 |
| [201711083452](https://www.permitgraph.org/p/201711083452) | Nov 8, 2017 | Completed: final sign-off Jun 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 25/f- mechanical: 4 new water source heat pumps, duct distribution. electrical: new lighting and branch circuiting. pa#201710131195 | $340,000 |
| [201710131195](https://www.permitgraph.org/p/201710131195) | Oct 13, 2017 | Completed: final sign-off Jun 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 25/f: improvements to unoccupied office suite. limited cieling, light fixtures and partition dmeolition, new non-structural partitions, glazing, celings, light fixture, millwork and finishes. ref pa2… | $1,080,000 |
| [201709299964](https://www.permitgraph.org/p/201709299964) | Sep 29, 2017 | Completed: final sign-off Oct 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 2 upright sprinklers at elevator lobby on the 25th floor. t.i pa# 21706300796 | $500 |
| [201706300796](https://www.permitgraph.org/p/201706300796) | Jun 30, 2017 | Completed: final sign-off Dec 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 25th floor - revision to pa 2016-0831-6421 - improvements to unoccupied office suite on the 25th floor: construction of elevator lobby | $16,983 |
| [201701066606](https://www.permitgraph.org/p/201701066606) | Jan 6, 2017 | Completed: final sign-off May 2018 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 22nd flr: provide modificatiopn of (e) fire alarm system, add 5 new ceiling speaker/strobes. add 1 duct smoke detector. add 1 control relay ti#2016 2017 0404 | $9,130 |
| [201612074332](https://www.permitgraph.org/p/201612074332) | Dec 7, 2016 | Never finaled: issued Dec 2016, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 22nd flor: fire sprinkler. relocate 2 pendents add 1 pendent. ref to app#2015-12-11-4851 |  |
| [201611162840](https://www.permitgraph.org/p/201611162840) | Nov 16, 2016 | Completed: final sign-off Feb 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 14th floor -per ab-017- demolition 0f (e) non-structural partitions, ceiling, lighting, floor finishes and any associated mechanical, plumbing and electrical in a full floor unoccupied office space.… | $75,000 |
| [201611152693](https://www.permitgraph.org/p/201611152693) | Nov 15, 2016 | Never finaled: issued Nov 2016, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only relocate 110 uprights heads for spec suite on 14th fl | $27,500 |
| [201611102400](https://www.permitgraph.org/p/201611102400) | Nov 10, 2016 | Completed: final sign-off Mar 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd flr: ref. ti 201601298401; title 24 work to include install one new linear diffuser,install new return air grilles,relocate supply diffusers,retrofit lighting & controls in corridor. no new fire… | $75,000 |
| [201603101664](https://www.permitgraph.org/p/201603101664) | Mar 10, 2016 | Completed: final sign-off Mar 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 22nd floor: lighting and mechanical work per title 24. reference app#201512114852 for arch. work. no new fire smoke dampers. |  |
| [201601298401](https://www.permitgraph.org/p/201601298401) | Jan 29, 2016 | Completed: final sign-off Mar 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd fl ti demo accoustical tile ceiling grid new accoustical tile ceiling/grid. finsih upgrade. new or revised mep, ls, sprinklers design build if needed. | $350,000 |
| [201512316209](https://www.permitgraph.org/p/201512316209) | Dec 31, 2015 | Never finaled: issued Jan 2016, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide a modification of the (e) fire alarm system. add (3) control relays for elevator primary recall, alternate recall, and firefighter's hat in high rise machine room, mid rise machine room, and… | $26,499 |
| [201512114852](https://www.permitgraph.org/p/201512114852) | Dec 11, 2015 | Completed: final sign-off Mar 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 22nd floor suite #2200 & 2250: combine 2 extg tenant suites into one larger suite, improvements inlcude non structural partitions, casework, ceiling, lights and finishes. | $504,000 |
| [201512114851](https://www.permitgraph.org/p/201512114851) | Dec 11, 2015 | Completed: final sign-off Mar 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 22nd floor: barrier free removal including upgrading restrooms to be compliant. | $15,000 |
| [201512013803](https://www.permitgraph.org/p/201512013803) | Dec 1, 2015 | Completed: final sign-off May 2016 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical | $100,000 |
| [201510260740](https://www.permitgraph.org/p/201510260740) | Oct 26, 2015 | Completed: final sign-off Dec 2016 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd floor: lighting and mechanical work pr t-24, include new lights vav boxes, grilles and ductwork. ref pa 2015 0924 7927. no new fire smoke dampers. | $175,000 |
| [201510159716](https://www.permitgraph.org/p/201510159716) | Oct 15, 2015 | Completed: final sign-off Jan 2016 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3rd flr: add 1 smoke detector and 3 speaker/strobes, and relocate 1 strobe and 1 speaker. on 3rd floor ref 2015/09/24/7927 | $6,319 |
| [201509247927](https://www.permitgraph.org/p/201509247927) | Sep 24, 2015 | Completed: final sign-off Dec 2016 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 3rd floor improvements to an unoccupied office suite. improvement include non-structural partitions, casement, ceilings, lighting & finishes. deferred submittals for t-24 mechanical & electrical, lif… | $319,540 |
| [201508053358](https://www.permitgraph.org/p/201508053358) | Aug 5, 2015 | Completed: final sign-off Dec 2017 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | demolition of e partitions, ceilings, lighting, floor finishes, and associated mech, plumbing, elec in full floor, unoccupied office space. per ab 17. space will remain unoccupied. permit for constru… | $102,000 |
| [201412093336](https://www.permitgraph.org/p/201412093336) | Dec 9, 2014 | Never finaled: issued Dec 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | extg duct distribution being modified to serve new space one new vav unit to include new electrical work. ref app#201411181754 | $15,000 |
| [201411181754](https://www.permitgraph.org/p/201411181754) | Nov 18, 2014 | Completed: final sign-off Jan 2015 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th floor t.i -demolitoin of non-structural partitions, doors/frames & finishes. ocnstruction of new non-structural walls, electrical & data rework, & installation of new finishes, minor ceiling rewo… |  |
| [201410068148](https://www.permitgraph.org/p/201410068148) | Oct 6, 2014 | Never finaled: issued Nov 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th and 7th floor: mechanical and electrical work for t.i. ref arch #201407141208 | $8,000 |
| [201410027900](https://www.permitgraph.org/p/201410027900) | Oct 2, 2014 | Completed: final sign-off May 2015 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [D A W Electric Inc](https://www.permitgraph.org/contractor/d-a-w-electric-inc-927569) | connnect the insul system to the existing f-a system. ref permit 20131224946. adding 1 fire strobe | $1,000 |
| [201409176517](https://www.permitgraph.org/p/201409176517) | Sep 17, 2014 | Completed: final sign-off Sep 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | flrs: 5 &7- fire sprinkler permit, relocate 5 and add 3 pendants on the 5th ad 7th flrs, t.i. 201407141208 | $4,112 |
| [201408274857](https://www.permitgraph.org/p/201408274857) | Aug 27, 2014 | Completed: final sign-off Sep 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | fire sprinkler permit, relocate 16, add 5 and delete 6 pendent sprinklers. t.i. pa# 201406037389 | $10,794 |
| [201407141208](https://www.permitgraph.org/p/201407141208) | Jul 14, 2014 | Never finaled: issued Aug 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th and 7th floors: demolition of non-structural partition doors, frames, finihses construction of new non-structural partitions. mep under seperate permit. | $32,000 |
| [201406269657](https://www.permitgraph.org/p/201406269657) | Jun 26, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical for tenant improvement, new vav, new transfer fans, new lighting. ref. arch# 201306037389 | $10,000 |
| [201406269604](https://www.permitgraph.org/p/201406269604) | Jun 26, 2014 | Completed: final sign-off Aug 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | add & relocate fire sprinkler per t.i. (2) add, (7) relocate. t.i. pa# 201312174414. | $4,626 |
| [201406037389](https://www.permitgraph.org/p/201406037389) | Jun 3, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 11th floor: t.i. to include demolition of non-structural partitions, construction of new non-structural partitions, new finishes and ceiling rework. mep , sprinklers and fire alarm separate permit. | $260,000 |
| [201405296977](https://www.permitgraph.org/p/201405296977) | May 29, 2014 | Completed: final sign-off Aug 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical for t.i. on the 10th floor. ref arch. 201404082696. | $45,000 |
| [201404082696](https://www.permitgraph.org/p/201404082696) | Apr 8, 2014 | Completed: final sign-off Aug 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement on the 10th flr, to include construction of new offices, project rooms and ammenity spaces, mep under sep. permit | $625,000 |
| [201403180991](https://www.permitgraph.org/p/201403180991) | Mar 18, 2014 | Completed: final sign-off Aug 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | interior non structural demo of paritions, ceiling electrial outlets and finishes throughout ab-017 | $21,000 |
| [201310300627](https://www.permitgraph.org/p/201310300627) | Oct 30, 2013 | Completed: final sign-off Oct 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | roof area: remove fire sprinkler pipe and heads from elevator machine room and hoistway per elevator modernization. | $1,500 |
| [201310169371](https://www.permitgraph.org/p/201310169371) | Oct 16, 2013 | Completed: final sign-off Jan 2014 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | demolition of existing non structural partitions, existing ceiling. construction of new non structural partitions, doors, frames. millwork. demo of unused duct work, relocate and install new vav box | $300,000 |
| [201209058951](https://www.permitgraph.org/p/201209058951) | Sep 5, 2012 | Never finaled: issued Sep 2012, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | revision to pa# 201203146066. work to include fire proofing column, provide j-box for hvac pump, transformer platform removed from scope, new transformer concrete pad and heat pump anchorage, 1st flo… | $25,000 |
| [201205150495](https://www.permitgraph.org/p/201205150495) | May 15, 2012 | Completed: final sign-off Jan 2013 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [The Whiting-Turner Contracting Company](https://www.permitgraph.org/contractor/the-whiting-turner-contracting-company-311107) | 1st/2nd floors-remove (e) & provide new lighting fixtures, plumbing fixtures, accessories & finishes. hallway, alcove, toilet rooms, provide new toilet rooms & shower rooms | $120,000 |
| [200811207025](https://www.permitgraph.org/p/200811207025) | Nov 20, 2008 | Completed: final sign-off Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew permit appl. #200712200928 for final insp. only. |  |
| [200811207027](https://www.permitgraph.org/p/200811207027) | Nov 20, 2008 | Completed: final sign-off Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew permit appl. #200801243167 for final insp. only. |  |
| [200811207026](https://www.permitgraph.org/p/200811207026) | Nov 20, 2008 | Completed: final sign-off Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | renew permit appl. #200801172717 for final insp. only. |  |
| [200704249505](https://www.permitgraph.org/p/200704249505) | Apr 24, 2007 | Completed: final sign-off Oct 2007 | [100 01st St](https://www.permitgraph.org/a/3721/087) |  | oti-1 6th fl me, sp, ls | $25,000 |
| [200701312999](https://www.permitgraph.org/p/200701312999) | Jan 31, 2007 | Completed: final sign-off Mar 2007 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-3or el | $16,000 |
| [200601202647](https://www.permitgraph.org/p/200601202647) | Jan 20, 2006 | Expired or cancelled: expired May 2008 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 8th floor el me ls sp | $9,956 |
| [200601202651](https://www.permitgraph.org/p/200601202651) | Jan 20, 2006 | Never finaled: issued Jan 2006, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 revision 3rd floor (200406045593) | $100 |
| [200505091865](https://www.permitgraph.org/p/200505091865) | May 9, 2005 | Expired or cancelled: expired Jul 2006 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | furnish & test (2) photo electric smoke detectors, (2) std. base. (17) genesis strobe. (15) ceiling | $13,700 |
| [200504150153](https://www.permitgraph.org/p/200504150153) | Apr 15, 2005 | Completed: final sign-off Jul 2005 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | modify (e) sprinkler system on 22nd fl relocate 67 heads, add 5 & plug off 19. | $13,000 |
| [200503308725](https://www.permitgraph.org/p/200503308725) | Mar 30, 2005 | Expired or cancelled: expired Mar 2007 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 2/fl-accessibility upgrades to men's and women's restrooms on the 2nd floor. barrier removal only. | $20,000 |
| [200503308732](https://www.permitgraph.org/p/200503308732) | Mar 30, 2005 | Completed: final sign-off Jul 2005 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1, 22nd fl, el,me,ls,sp. | $375,000 |
| [200404282469](https://www.permitgraph.org/p/200404282469) | Apr 28, 2004 | Completed: final sign-off Oct 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2 5/f me | $9,800 |
| [200404282465](https://www.permitgraph.org/p/200404282465) | Apr 28, 2004 | Completed: final sign-off Sep 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2 6/f me | $16,800 |
| [200404090961](https://www.permitgraph.org/p/200404090961) | Apr 9, 2004 | Completed: final sign-off Oct 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | 4/f & 6/f - relocate 4 & add 6 heads sprinkler head | $3,500 |
| [200404090901](https://www.permitgraph.org/p/200404090901) | Apr 9, 2004 | Completed: final sign-off Oct 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 5/f el me ls sp | $53,000 |
| [200404090896](https://www.permitgraph.org/p/200404090896) | Apr 9, 2004 | Completed: final sign-off Oct 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 3/f el me ls sp | $22,000 |
| [200404020299](https://www.permitgraph.org/p/200404020299) | Apr 2, 2004 | Expired or cancelled: expired Jul 2006 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1, 11th fl, el, me, sp, ls. | $86,144 |
| [200403178853](https://www.permitgraph.org/p/200403178853) | Mar 17, 2004 | Completed: final sign-off Sep 2004 | [100 01st St](https://www.permitgraph.org/a/3721/087) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 6/f el me ls sp | $100,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) (25), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (13), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (11), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (10), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (5), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (5), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (2), [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) (2), [D A W Electric Inc](https://www.permitgraph.org/contractor/d-a-w-electric-inc-927569), [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761), [The Whiting-Turner Contracting Company](https://www.permitgraph.org/contractor/the-whiting-turner-contracting-company-311107)
- Architects: [Eric Munson Ebert](https://www.permitgraph.org/professional/eric-munson-ebert-C25185) (10), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087) (9), [Jack Munson](https://www.permitgraph.org/professional/jack-munson-C9620) (2), [Lucinda Tay](https://www.permitgraph.org/professional/lucinda-tay-C33227) (2), [Rollack Architecture](https://www.permitgraph.org/professional/rollack-architecture-C29399) (2), [Alan Johansen](https://www.permitgraph.org/professional/alan-johansen-C9672), [Daniel Huntsman](https://www.permitgraph.org/professional/daniel-huntsman-C9255), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223), [Greg A. Sheppard](https://www.permitgraph.org/professional/greg-a-sheppard-C26557), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144), [Leif Glomset](https://www.permitgraph.org/professional/leif-glomset-C18931), [Woodward Engineering](https://www.permitgraph.org/professional/woodward-engineering-E17207)
- Engineers: [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378) (2), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (2), [Antonio Jakosalem](https://www.permitgraph.org/professional/antonio-jakosalem-E15401), [Henry Holbrook Hyde Iii](https://www.permitgraph.org/professional/henry-holbrook-hyde-iii-C21290), [Jesus Cabellon Jr.](https://www.permitgraph.org/professional/jesus-cabellon-jr-E9278), [Paul O'neill](https://www.permitgraph.org/professional/paul-o-neill-M29440)
- Authorized agents: [Jesse Magana](https://www.permitgraph.org/professional/jesse-magana-381218), [Kurtiss Kusumoto](https://www.permitgraph.org/professional/kurtiss-kusumoto-C32469)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3721/087.
