# 500 Howard St

Block 3721, lot 011. Page: https://www.permitgraph.org/a/3721/011

The city's assessor roll has no record for this parcel.

## Permits filed here

103 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201310048538](https://www.permitgraph.org/p/201310048538) | Oct 4, 2013 | Completed: final sign-off Oct 2013 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | install 1 new pendent head in new ceiling | $2,385 |
| [201307010863](https://www.permitgraph.org/p/201307010863) | Jul 1, 2013 | Completed: final sign-off Dec 2013 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 3rd floor-t.i includes demolishing of non structural partitions & building new non structural partitions. life safety work will be design build & submitted for permit seperatley (bldg fully sprinkler… | $520,000 |
| [201208238079](https://www.permitgraph.org/p/201208238079) | Aug 23, 2012 | Completed: final sign-off Aug 2012 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 4th floor-as builts for pa# 2012-0810-7108- 3 relocated sprinklers & added 6 sprinklers | $1,000 |
| [201208107108](https://www.permitgraph.org/p/201208107108) | Aug 10, 2012 | Completed: final sign-off Aug 2012 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvements:fire sprinkler system two relocates, four new springklers- 4th floor | $2,000 |
| [201208096997](https://www.permitgraph.org/p/201208096997) | Aug 9, 2012 | Completed: final sign-off Aug 2012 | [510 Howard St](https://www.permitgraph.org/a/3721/011) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | added 3 smoke detectors; added 1 power supply; added 12 spkr/strobes; added 3 door holders | $10,000 |
| [201205019552](https://www.permitgraph.org/p/201205019552) | May 1, 2012 | Expired or cancelled: expired Dec 2014 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th floor-t.i includes demo of non structural partitions, building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted sep… | $60,000 |
| [201110056148](https://www.permitgraph.org/p/201110056148) | Oct 5, 2011 | Completed: final sign-off Dec 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | suite 100 - install watersource heat pump connect to existing condenser water line. | $10,000 |
| [201109205088](https://www.permitgraph.org/p/201109205088) | Sep 20, 2011 | Never finaled: issued Sep 2011, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Tube Art Displays Inc/Dba Tube Art Signs](https://www.permitgraph.org/contractor/tube-art-displays-inc-dba-tube-art-signs-753690) | revision to app#201106067484 showing new anchor details for sign#1 |  |
| [201108011477](https://www.permitgraph.org/p/201108011477) | Aug 1, 2011 | Completed: final sign-off Sep 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st floor-t.i. (e) fire sprinkler system-9 added srpinklers, 39 relocated sprinklers, 4 removed sprinklers.total 48 sprinklers. as-built plans shall be provided. | $24,000 |
| [201107130064](https://www.permitgraph.org/p/201107130064) | Jul 13, 2011 | Completed: final sign-off Aug 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t i at 500 howard,1st floor,speciality cafe. 2 monitor modules,4relay modules,4 duct detectors, 1 strobes,8 speaker/strobes,1 speaker. | $8,000 |
| [201107069563](https://www.permitgraph.org/p/201107069563) | Jul 6, 2011 | Completed: final sign-off Nov 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | revision to pa# 2011-0519-6367-add disabled access ramp (interior) | $5,000 |
| [201106067488](https://www.permitgraph.org/p/201106067488) | Jun 6, 2011 | Never finaled: issued Aug 2011, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Tube Art Displays Inc/Dba Tube Art Signs](https://www.permitgraph.org/contractor/tube-art-displays-inc-dba-tube-art-signs-753690) | to erect 2 illuminated wall signs | $4,000 |
| [201106067484](https://www.permitgraph.org/p/201106067484) | Jun 6, 2011 | Never finaled: issued Aug 2011, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Tube Art Displays Inc/Dba Tube Art Signs](https://www.permitgraph.org/contractor/tube-art-displays-inc-dba-tube-art-signs-753690) | #102 - erect 5 electric, illuminated double faced hanging signs for specialty's (intelligentsia). | $15,000 |
| [201106027252](https://www.permitgraph.org/p/201106027252) | Jun 2, 2011 | Completed: final sign-off Aug 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate fire sprinkler per tenant improvement. 1 head relocate. | $950 |
| [201105256817](https://www.permitgraph.org/p/201105256817) | May 25, 2011 | Completed: final sign-off Dec 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | mech, elec, and plumbing work for ground floor restaurant approved 201105196367. new structural for mech equip | $76,500 |
| [201105196367](https://www.permitgraph.org/p/201105196367) | May 19, 2011 | Completed: final sign-off Aug 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | ti of specialty cafe and baker resturant serving no alcohol. existing shell. new restrooms | $470,000 |
| [201104214512](https://www.permitgraph.org/p/201104214512) | Apr 21, 2011 | Completed: final sign-off Aug 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti on 2nd floor. 1 wall speaker/strobe. 2 control relays. 2 dual monitor modules | $4,327 |
| [201103313245](https://www.permitgraph.org/p/201103313245) | Mar 31, 2011 | Completed: final sign-off Sep 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd floor remodel existing space include new acoustical,rated, slab-slab partitions, associated elect power/lighting distribution, assoc mech sys distribution, assoc structural upgrades, upgrade rest… | $75,000 |
| [201102089793](https://www.permitgraph.org/p/201102089793) | Feb 8, 2011 | Completed: final sign-off Apr 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti on 3rd fl. 19 new ceiling speakers. 11 relocate speakers/strobes ref# 2010.12.29.7548 and 2011.01.31.2623 | $12,285 |
| [201101289291](https://www.permitgraph.org/p/201101289291) | Jan 28, 2011 | Completed: final sign-off Aug 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | add, relocate and remove fire sprinkler heads on 3rd floor. 4 add, 13 relocate, 33 remove | $8,000 |
| [201012297548](https://www.permitgraph.org/p/201012297548) | Dec 29, 2010 | Completed: final sign-off Nov 2011 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | office ti on 3rd floor. demo, new partitionsm ceiling, lighting, minor painting, casework, elec, mech, fire protection, fire alarm and sprinkler under separate permit | $410,000 |
| [201009221391](https://www.permitgraph.org/p/201009221391) | Sep 22, 2010 | Never finaled: issued Sep 2010, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | install new air sampling detection in 2nd floor server room- connecting to existing pre-action sytem for supervision only. | $11,000 |
| [200711278920](https://www.permitgraph.org/p/200711278920) | Nov 27, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm system on 4th floor. 2 smoke detectors, 14 strobes, 18 speakers, 2 door holders. | $23,528 |
| [200711158195](https://www.permitgraph.org/p/200711158195) | Nov 15, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | 4th floor: re-configure life safety devices per new room + entry layout. 2 dual input module, 2 addressable control relay, 6 smoke detectors, 2 interposing relay, 3 strobes, 2 smoke dampers. ref appl… | $5,000 |
| [200711057284](https://www.permitgraph.org/p/200711057284) | Nov 5, 2007 | Never finaled: issued Nov 2007, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | install tie back anchors,sleeves and davit drop thru arms to roof surface for window washing equip. | $68,000 |
| [200711027148](https://www.permitgraph.org/p/200711027148) | Nov 2, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | 4th floor: modification of hvac system for new layout of space. title 24 calculation for lighting for tenant out. | $274,000 |
| [200710266588](https://www.permitgraph.org/p/200710266588) | Oct 26, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinkler modification/ add 4 heads- 4th floor | $4,000 |
| [200710256426](https://www.permitgraph.org/p/200710256426) | Oct 25, 2007 | Completed: final sign-off Jan 2008 | [510 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | remove redundant doors at elevator lobby on 4th floor only.revision to permit 2007 1025 6426 |  |
| [200710256425](https://www.permitgraph.org/p/200710256425) | Oct 25, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | install 2 new security fencing and gates in stairwells 1 and 2-gr floor | $12,000 |
| [200710195894](https://www.permitgraph.org/p/200710195894) | Oct 19, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | upgrade security desk and addition of optic turnstiles. to include demo of old desk | $155,000 |
| [200710195907](https://www.permitgraph.org/p/200710195907) | Oct 19, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | modify existing sprinkler system on 4th floor only for new tenant improvements within 2000 sq.ft. area. new calc's, 21 add, 6 relocate. | $10,000 |
| [200709132529](https://www.permitgraph.org/p/200709132529) | Sep 13, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | reconfigure hvac distribution to conform with new walls approved under pa# 2007.08.28.1148. life safty on seperate application | $18,000 |
| [200708311465](https://www.permitgraph.org/p/200708311465) | Aug 31, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | 4th floor-first time tenant. t.i. for interior office space on level 4. work proposed will take about 1/3 of the floor area on that floor. mep, sprinkler and fire alarm under separate permit. | $500,000 |
| [200708281148](https://www.permitgraph.org/p/200708281148) | Aug 28, 2007 | Completed: final sign-off Jan 2008 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | prosodie: oti-1, 4th floor el, me, l/s, sp | $25,000 |
| [M65569](https://www.permitgraph.org/p/M65569) | Apr 24, 2007 | Never finaled: issued Apr 2007, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | street space |  |
| [200703065505](https://www.permitgraph.org/p/200703065505) | Mar 6, 2007 | Completed: final sign-off Mar 2007 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety system modificaqtions @ 500 howard st, 1st fl, install 5 wall strobes | $3,500 |
| [200702154195](https://www.permitgraph.org/p/200702154195) | Feb 15, 2007 | Expired or cancelled: expired Sep 2010 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 4th floor: add 44 uprights in shell space. add 28 pendents in shell/ti | $19,000 |
| [200701161667](https://www.permitgraph.org/p/200701161667) | Jan 16, 2007 | Expired or cancelled: expired Sep 2010 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | tenant improvement of 4th floor. 3 with smoke detection, 2 monitor modules, 18 speaker strobes, 4 strobes. | $10,877 |
| [200701111489](https://www.permitgraph.org/p/200701111489) | Jan 11, 2007 | Never finaled: issued Apr 2007, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | oti-2 - prosodie interactive, 4th floor, el, me. | $499,900 |
| [200611218230](https://www.permitgraph.org/p/200611218230) | Nov 21, 2006 | Completed: final sign-off Mar 2007 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | install 14 fire sprinklers from existing plugged outlets on the street level only | $3,500 |
| [200611157775](https://www.permitgraph.org/p/200611157775) | Nov 15, 2006 | Expired or cancelled: expired Sep 2010 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | oti-1, 4th floor, el, me, ls, sp. | $700,000 |
| [200608018193](https://www.permitgraph.org/p/200608018193) | Aug 1, 2006 | Completed: final sign-off Mar 2007 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | 1st floor, unit #101 - new dental office in ground floor suite. work includes non-bearing walls, electrical, plumbing & mechanical work for 1 accessible bathroom 4 dental chairs and realated service… | $120,000 |
| [200503177739](https://www.permitgraph.org/p/200503177739) | Mar 17, 2005 | Completed: final sign-off Jun 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | oti-2 1/f me | $9,800 |
| [200502246102](https://www.permitgraph.org/p/200502246102) | Feb 24, 2005 | Completed: final sign-off Mar 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | change swing of lobby doors per bldg insp per app #200407017860/20040323937s r-1/20040339377 r-1 | $5,000 |
| [200501052551](https://www.permitgraph.org/p/200501052551) | Jan 5, 2005 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | hook up of 1 automatic hood and duct fire suppression system | $600 |
| [200412232049](https://www.permitgraph.org/p/200412232049) | Dec 23, 2004 | Completed: final sign-off Jun 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | oti-1 1st floor el, me, sp, l/s | $55,000 |
| [200412020543](https://www.permitgraph.org/p/200412020543) | Dec 2, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire sprinkler system as-built. (5th floor) |  |
| [200411290176](https://www.permitgraph.org/p/200411290176) | Nov 29, 2004 | Expired or cancelled: expired Dec 2006 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Rago Neon Inc.](https://www.permitgraph.org/contractor/rago-neon-inc-398620) | erect electric wall sign |  |
| [200411098792](https://www.permitgraph.org/p/200411098792) | Nov 9, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm build out for the 8th floor only. new strobes, speakers, & control relays. | $26,000 |
| [200410066071](https://www.permitgraph.org/p/200410066071) | Oct 6, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 8th floor, el, me | $350,000 |
| [200409103868](https://www.permitgraph.org/p/200409103868) | Sep 10, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 8th floor-t.i.- entire floor, base system is existing. hds piped below ceilings. | $27,850 |
| [200408302859](https://www.permitgraph.org/p/200408302859) | Aug 30, 2004 | Completed: final sign-off Sep 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Thomas Parkin Inc Dba Worksafe Technolog](https://www.permitgraph.org/contractor/thomas-parkin-inc-dba-worksafe-technolog-773765) | seismic insulated supports for computer cabinets on 2/f,see oti appl#200404262192 for all other info | $20,000 |
| [200408232293](https://www.permitgraph.org/p/200408232293) | Aug 23, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | build out of cafe, f/a,ansul,sprinkler under seperate permit | $800,000 |
| [200408101143](https://www.permitgraph.org/p/200408101143) | Aug 10, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection work on 9th floor | $15,000 |
| [200408101144](https://www.permitgraph.org/p/200408101144) | Aug 10, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection work on 10th floor | $15,000 |
| [200408101139](https://www.permitgraph.org/p/200408101139) | Aug 10, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection work on 7th floor | $15,000 |
| [200407269742](https://www.permitgraph.org/p/200407269742) | Jul 26, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | installation of security desk and standby generator | $400,000 |
| [200407239621](https://www.permitgraph.org/p/200407239621) | Jul 23, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm system work only new speakers strobes and smoke detectors 9/f | $22,000 |
| [200407239613](https://www.permitgraph.org/p/200407239613) | Jul 23, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm system work only new speakers strobes smoke detectors 7/f | $27,000 |
| [200407239625](https://www.permitgraph.org/p/200407239625) | Jul 23, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm system work only new speakers strobes door holders duct and smoke detectors | $27,000 |
| [200407239618](https://www.permitgraph.org/p/200407239618) | Jul 23, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm system work only new speakers strobes and smoke detectors - 5/f | $27,000 |
| [200407239616](https://www.permitgraph.org/p/200407239616) | Jul 23, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | fire alarm system work only new speakers strobes and smoke detectors 6/f | $27,000 |
| [200407239627](https://www.permitgraph.org/p/200407239627) | Jul 23, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | 10/fl - fire alarm system work only. new sprinkler, strobes, door holders & smoke dectectors. | $22,000 |
| [200407219401](https://www.permitgraph.org/p/200407219401) | Jul 21, 2004 | Completed: final sign-off Mar 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | oti-2 3rd flr-sp | $3,000 |
| [200407017860](https://www.permitgraph.org/p/200407017860) | Jul 1, 2004 | Completed: final sign-off Mar 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Cupertino Electric Inc.](https://www.permitgraph.org/contractor/cupertino-electric-inc-174637) | san francisco fire dept plan check only, t.i buildout (e) bldg fully sprinklered. fire alarm plan | $40,000 |
| [200406287447](https://www.permitgraph.org/p/200406287447) | Jun 28, 2004 | Completed: final sign-off Feb 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1, 8th floor, el, me, ls sp | $400,000 |
| [200405123659](https://www.permitgraph.org/p/200405123659) | May 12, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 10th floor el, me | $200,000 |
| [200405123654](https://www.permitgraph.org/p/200405123654) | May 12, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 7th floor el, me | $200,000 |
| [200405123658](https://www.permitgraph.org/p/200405123658) | May 12, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 9th floor el, me | $200,000 |
| [200405063180](https://www.permitgraph.org/p/200405063180) | May 6, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 10/f el sp ls me | $850,000 |
| [200405063179](https://www.permitgraph.org/p/200405063179) | May 6, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 9th floor, el, me, ls, sp | $750,000 |
| [200405063224](https://www.permitgraph.org/p/200405063224) | May 6, 2004 | Completed: final sign-off Oct 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | install new pre-action system in service room 2nd floor (tenant improvement under ** | $2,000 |
| [200405063182](https://www.permitgraph.org/p/200405063182) | May 6, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 7th floor, el, me, ls, sp | $750,000 |
| [200405042944](https://www.permitgraph.org/p/200405042944) | May 4, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection 2nd floor | $18,000 |
| [200405042943](https://www.permitgraph.org/p/200405042943) | May 4, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection 5th floor | $18,000 |
| [200405042940](https://www.permitgraph.org/p/200405042940) | May 4, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | provide tenant fire protection 6th floor | $18,000 |
| [200405032807](https://www.permitgraph.org/p/200405032807) | May 3, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 el, me, 2nd floor | $200,000 |
| [200404282461](https://www.permitgraph.org/p/200404282461) | Apr 28, 2004 | Never finaled: issued Aug 2004, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2 6th floor el me | $175,000 |
| [200404282460](https://www.permitgraph.org/p/200404282460) | Apr 28, 2004 | Completed: final sign-off Oct 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-2, 5th floor el me | $175,000 |
| [200404262187](https://www.permitgraph.org/p/200404262187) | Apr 26, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 6/f el me sp ls | $1,000,000 |
| [200404262189](https://www.permitgraph.org/p/200404262189) | Apr 26, 2004 | Completed: final sign-off Jan 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 5/f el me ls sp | $1,000,000 |
| [200404262192](https://www.permitgraph.org/p/200404262192) | Apr 26, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | oti-1 2/f el me ls sp | $1,200,000 |
| [200403239375](https://www.permitgraph.org/p/200403239375) | Mar 23, 2004 | Completed: final sign-off Mar 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | oti-1 3th fl-el, me, ls, sp | $1,250,000 |
| [200403239377](https://www.permitgraph.org/p/200403239377) | Mar 23, 2004 | Completed: final sign-off Mar 2005 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | oti-2,3rd fl-el,me,ls | $1,250,000 |
| [200403178906](https://www.permitgraph.org/p/200403178906) | Mar 17, 2004 | Completed: final sign-off Jul 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | set up dust barricades separation 2/f soft demo barricades remove abandoned ductwork and conduit no | $3,000 |
| [200403178907](https://www.permitgraph.org/p/200403178907) | Mar 17, 2004 | Completed: final sign-off Aug 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | set up dust and separation barricades, 10/f soft demo barricades remove abandoned conduit and ductwk | $3,000 |
| [200403178911](https://www.permitgraph.org/p/200403178911) | Mar 17, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 5/f soft demo set up dust barricades separation barricades remove abandoned ductwork and conduit no | $3,000 |
| [200403178910](https://www.permitgraph.org/p/200403178910) | Mar 17, 2004 | Completed: final sign-off Jun 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 9/f soft demo set up dust and separation barricades remove abandoned conduit and ductwork no removal | $3,000 |
| [200403178909](https://www.permitgraph.org/p/200403178909) | Mar 17, 2004 | Completed: final sign-off Jul 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 6/f soft demo set up dust and separation barricades remove abandoned ductwork and conduit no removl | $3,000 |
| [200403178908](https://www.permitgraph.org/p/200403178908) | Mar 17, 2004 | Completed: final sign-off Nov 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 8/f soft demo set up dust and separation barricades remove abandoned ductwork and conduit no removal | $3,000 |
| [200403178905](https://www.permitgraph.org/p/200403178905) | Mar 17, 2004 | Completed: final sign-off Jul 2004 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 7/f soft demo set up dust and separation barricades remvoe abandoned ductwork and conduit no removal | $3,000 |
| [200310278551](https://www.permitgraph.org/p/200310278551) | Oct 27, 2003 | Completed: final sign-off Dec 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Charles M Prescott Electr](https://www.permitgraph.org/contractor/charles-m-prescott-electr-529260) | 1/f- life safety work in association with apppl#200308273206 | $5,000 |
| [200310177826](https://www.permitgraph.org/p/200310177826) | Oct 17, 2003 | Never finaled: issued Oct 2003, no final | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | relocate 7 existing spkr heads and plug-off 4 for new tenant work on 1st floor only. | $3,500 |
| [200308273206](https://www.permitgraph.org/p/200308273206) | Aug 27, 2003 | Completed: final sign-off Dec 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | oti-1 1st floor, le, me, ls, sp | $35,000 |
| [200210179197](https://www.permitgraph.org/p/200210179197) | Oct 17, 2002 | Expired or cancelled: cancelled Dec 2007 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | build out floors 2-5, first time build out in a new construction | $7,300,000 |
| [200206139026](https://www.permitgraph.org/p/200206139026) | Jun 13, 2002 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | new fire sprinkler system standpipes in new 12 story building | $382,000 |
| [200204184356](https://www.permitgraph.org/p/200204184356) | Apr 18, 2002 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | revision to app #200006172952s design build exterior skin shop per plans |  |
| [200111022335](https://www.permitgraph.org/p/200111022335) | Nov 2, 2001 | Expired or cancelled: expired Mar 2002 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | provide 20 indicated piles per soil report |  |
| [200108156065](https://www.permitgraph.org/p/200108156065) | Aug 15, 2001 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | provide crane pad per plans | $50,000 |
| [200010264186](https://www.permitgraph.org/p/200010264186) | Oct 26, 2000 | Expired or cancelled: withdrawn Feb 2002 | [510 Howard St](https://www.permitgraph.org/a/3721/011) |  | ksw properties | $20,000 |
| [200009130342](https://www.permitgraph.org/p/200009130342) | Sep 13, 2000 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | provide underpinning per plans | $50,000 |
| [200007155235](https://www.permitgraph.org/p/200007155235) | Jul 15, 2000 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | to demolish 5 stories of office bldg |  |
| [200006172952](https://www.permitgraph.org/p/200006172952) | Jun 17, 2000 | Completed: final sign-off Apr 2003 | [500 Howard St](https://www.permitgraph.org/a/3721/011) |  | to erect office | $8,000,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (23), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (11), [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) (9), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) (8), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (6), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (3), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) (3), [Tube Art Displays Inc/Dba Tube Art Signs](https://www.permitgraph.org/contractor/tube-art-displays-inc-dba-tube-art-signs-753690) (3), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (2), [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) (2), [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) (2), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (2), [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Charles M Prescott Electr](https://www.permitgraph.org/contractor/charles-m-prescott-electr-529260), [Cupertino Electric Inc.](https://www.permitgraph.org/contractor/cupertino-electric-inc-174637), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Rago Neon Inc.](https://www.permitgraph.org/contractor/rago-neon-inc-398620), [Thomas Parkin Inc Dba Worksafe Technolog](https://www.permitgraph.org/contractor/thomas-parkin-inc-dba-worksafe-technolog-773765)
- Architects: [Fee,Munson & Ebert Fee, Munson & Ebert](https://www.permitgraph.org/professional/fee-munson-ebert-fee-munson-ebert-C8346) (2), [Jonathan Jaeger](https://www.permitgraph.org/professional/jonathan-jaeger-C12815) (2), [Clement Soga 1097 Howard St](https://www.permitgraph.org/professional/clement-soga-1097-howard-st-C1704), [Craig](https://www.permitgraph.org/professional/craig-C22069), [Craig Slavsky](https://www.permitgraph.org/professional/craig-slavsky-C7360), [J. Edgar Fennies Jr](https://www.permitgraph.org/professional/j-edgar-fennies-jr-C20310), [Joseph Remling](https://www.permitgraph.org/professional/joseph-remling-C34144), [Karl Shultz](https://www.permitgraph.org/professional/karl-shultz-C13762), [Kevin Schaeffer](https://www.permitgraph.org/professional/kevin-schaeffer-C13531)
- Engineers: [Avery Miller](https://www.permitgraph.org/professional/avery-miller-S2041), [Paul Mcdonald](https://www.permitgraph.org/professional/paul-mcdonald-15043), [Robert Trifunovic](https://www.permitgraph.org/professional/robert-trifunovic-M19662), [Tractel Lld](https://www.permitgraph.org/professional/tractel-lld-12494)
- Authorized agents: [Jack Cherico](https://www.permitgraph.org/professional/jack-cherico-719959)
- Lessees: [Hks Architects Hks Architects](https://www.permitgraph.org/professional/hks-architects-hks-architects-C28538)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3721/011.