# 116 01st St

Block 3721, lot 004. Page: https://www.permitgraph.org/a/3721/004

- City's use: Commercial Office
- Built: 1988
- Stories: 27
- Lot: 1,575 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

88 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202211146357](https://www.permitgraph.org/p/202211146357) | Nov 14, 2022 | Completed: final sign-off Feb 2023 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 26/f: tenant improvement fire alarm system modification to existing elevator landing two-way emergency comm system. | $48,101 |
| [202208251218](https://www.permitgraph.org/p/202208251218) | Aug 25, 2022 | Completed: final sign-off Nov 2023 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 13/f-phase 1&2: f/a t.i. phase 1: add 7 speaker strobes, 2 strobes, 6 smk det, 2 pull station/2contrlrelay; phase 2: add 1 booster power supply, 1 synch output mod, 24 speaker/strobes, 1 strobe, 1 sm… | $19,062 |
| [201809251350](https://www.permitgraph.org/p/201809251350) | Sep 25, 2018 | Completed: final sign-off Aug 2019 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4/f: mechanical, electrical & plumbing for tenant improvemnt 4th fl ref pa#201808076647 & 201812057473 |  |
| [201808177620](https://www.permitgraph.org/p/201808177620) | Aug 17, 2018 | Completed: final sign-off Oct 2018 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ti# 201806071283. modify (e) fire alarm system. relocate 1 wall speaker/strobe add 1 wall strobe | $6,500 |
| [201806040886](https://www.permitgraph.org/p/201806040886) | Jun 4, 2018 | Completed: final sign-off Aug 2018 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 14th floor: provide modification of the extg system. t.i. app#201803123385 | $29,236 |
| [201801229188](https://www.permitgraph.org/p/201801229188) | Jan 22, 2018 | Completed: final sign-off Apr 2018 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | new chese shop in existing commercial space. new counters, refrigerators, stainless sinks, new lighting and water heater. ste 165 | $30,000 |
| [201801088072](https://www.permitgraph.org/p/201801088072) | Jan 8, 2018 | Completed: final sign-off Mar 2018 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | as built fire alarm 201711214523, add 6 new ceiling speaker strobes |  |
| [201711214523](https://www.permitgraph.org/p/201711214523) | Nov 21, 2017 | Completed: final sign-off May 2024 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 25th fl - provide a modification of existing fire alarm system relocate (4) existing ceiling speaker/strobe. add 3 new ceiling speaker/strobe, 4 duct smoke detector & 4 control relay ref pa 2017-1013… | $10,782 |
| [201710201772](https://www.permitgraph.org/p/201710201772) | Oct 20, 2017 | Never finaled: issued Oct 2017, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | f/a: provide modification of the (e) fa system on 25th fl. ref ti #2017-0630-0796. 1 new smoke, 1 ceiling spkr/str, 1 control relay for door holders | $8,143 |
| [201708175135](https://www.permitgraph.org/p/201708175135) | Aug 17, 2017 | Completed: final sign-off Aug 2017 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | suite #355: add 4 new ceiling speaker/strobe. ref app#201609218339 | $9,194 |
| [201701137178](https://www.permitgraph.org/p/201701137178) | Jan 13, 2017 | Never finaled: issued Jan 2017, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 22nd floor: as built drawings for fire alarm showing smoke detector was not installed at elevator lobby 22nd floor. per app#201603020940. t.i. ref app#201512114852 |  |
| [201611303719](https://www.permitgraph.org/p/201611303719) | Nov 30, 2016 | Completed: final sign-off Jan 2017 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 25th fl. provide modification of (e) fire alarm. remove 10 (e) ceiling speakers. remove 12 smoke detectors. add 14 new ceiling speaker/strobes. add 1 duct detector. relocate 1 smoke detector. referen… | $14,626 |
| [201610210861](https://www.permitgraph.org/p/201610210861) | Oct 21, 2016 | Completed: final sign-off Oct 2016 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3/f- add 10 new ceiling speaker/strobes. t.i. pa#201609218339 & 201610120016 | $14,617 |
| [201606301244](https://www.permitgraph.org/p/201606301244) | Jun 30, 2016 | Completed: final sign-off Aug 2016 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 12th flr, ste.1250: add 3 smoke detectors, relocate 3 existing smoke detectors, add 16 ceiling speakers/strobes and 1 duct smoke detector. remove 6 (e) ceiling speakers | $8,658 |
| [201603141908](https://www.permitgraph.org/p/201603141908) | Mar 14, 2016 | Expired or cancelled: withdrawn Jun 2016 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | revision to pa 2015-1211-4852 verify exit signage in the elevator lobby and compliance with section 1008.1.9-12 for acrd reader in elevator lobby. |  |
| [201603020940](https://www.permitgraph.org/p/201603020940) | Mar 2, 2016 | Never finaled: issued Mar 2016, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 22nd flr: modification of (e) fire alarm system. ref pa 2015 1211 4852. add 1 new smoke detector, 1 central relay, 8 new ceiling speakers/strobes. relocate 1 wall mounted strobe & 1 ceiling speaker. | $10,357 |
| [201603020943](https://www.permitgraph.org/p/201603020943) | Mar 2, 2016 | Completed: final sign-off Jan 2017 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3rd flr: r&r 6 smk det. remove (e) wall mount strobes and ceiling mount speakers. install 11 new speakers/strobes in hallway | $7,315 |
| [201507101131](https://www.permitgraph.org/p/201507101131) | Jul 10, 2015 | Completed: final sign-off Oct 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit. | $15,134 |
| [201502249143](https://www.permitgraph.org/p/201502249143) | Feb 24, 2015 | Never finaled: issued Feb 2015, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide a modification of the (e) fire alarm system for ada strobe coverage. install (9) new ceiling speaker/strobes, remove and replace (11) existing speaker/strobes, relocate (5) (e) smoke detector… | $14,850 |
| [201502249138](https://www.permitgraph.org/p/201502249138) | Feb 24, 2015 | Completed: final sign-off Mar 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 13th floor: add (2) smk det & (1) control relay to (e) system. no mechplans - detectors are for elevator lobby door. ti permit 2014-0825-4609 | $5,483 |
| [201502249141](https://www.permitgraph.org/p/201502249141) | Feb 24, 2015 | Completed: final sign-off May 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | fire alarm ti 12th floor- provide modification of the (e) system relocate 2 (e) smoke detectors, demo (1) smoke detector, add (1) new speaker/strobe, change candela (2) s/strobe. no mechanical change… | $6,841 |
| [201502128131](https://www.permitgraph.org/p/201502128131) | Feb 12, 2015 | Completed: final sign-off Jun 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th floor - revision to pa #2014.1126.2611: relocation of tenant suite entry door. |  |
| [201502057567](https://www.permitgraph.org/p/201502057567) | Feb 5, 2015 | Completed: final sign-off Jul 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th floor: lighting and mechanical work per title 24, work includes new lights and installing new grilles, relocate existing grilles and duct work. ref. to pa#201411262611 for architectural work. re… | $42,000 |
| [201501165919](https://www.permitgraph.org/p/201501165919) | Jan 16, 2015 | Completed: final sign-off Feb 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | ste 1250: demolition of some existing ceiling height partitions, demolition of some existing suspended acoustic ceiling and associated lighting and hvac. per ab-017. tenant improvement under separate… | $25,000 |
| [201501024834](https://www.permitgraph.org/p/201501024834) | Jan 2, 2015 | Completed: final sign-off Jan 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 12th flr: arch permit 201411262611; fire sprk t.i., relocate 15 hds, add 1 head,total 16 heads | $8,000 |
| [201411262611](https://www.permitgraph.org/p/201411262611) | Nov 26, 2014 | Completed: final sign-off Jul 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th floor: new corridor being created on a multi tenant floor. 2 new demising walls. elevator lobby work. etc, mep, sprinkler or life safety work if needed will be under 201501054876 separate permit. | $328,000 |
| [201411121282](https://www.permitgraph.org/p/201411121282) | Nov 12, 2014 | Completed: final sign-off Jan 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 5th & 7th floor: modification to existing system. add 4 new strobe. relocate 3 existing strobe and provide 2 existing strobe. ref. appl. 201407141208. | $8,096 |
| [201408214441](https://www.permitgraph.org/p/201408214441) | Aug 21, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 11th floor - modify (e) fire alarm system. demo 3 strobes, 3 speakers and 3 smoke detectors. add 7 ceiling speakers, relocate 4 existing strobes and 12 existing smoke dectors. ref. appl. 2014.0603.73… | $7,526 |
| [201408143864](https://www.permitgraph.org/p/201408143864) | Aug 14, 2014 | Never finaled: issued Sep 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide a modification of the existing fire alarm system to ground floor common area. add 2 wall mount strobes, 3 in duct smoke detectors for fsds, 3 control relays for fsds, 2 wall mount speaker str… | $6,868 |
| [201407242062](https://www.permitgraph.org/p/201407242062) | Jul 24, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | on 1st floor - install two new supply grilles, two new exhaust grilles, three new fire/smoke dampers and duct work. reference permit application #201312174414 for architectural permit | $10,650 |
| [201407090760](https://www.permitgraph.org/p/201407090760) | Jul 9, 2014 | Completed: final sign-off Jan 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | revision to 201312174414; structural details/drawings for existing project. |  |
| [201406279675](https://www.permitgraph.org/p/201406279675) | Jun 27, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | ground floor suite 279: title 24 el4ectricla lighting & power work for (e) panel. ref pa #2013.1217.4414 fro architectural permit. | $30,000 |
| [201406239126](https://www.permitgraph.org/p/201406239126) | Jun 23, 2014 | Completed: final sign-off Mar 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | construction of full height partitions, doors, millwork on the 26th fl ls, sprinklers sep permit | $700,000 |
| [201406047444](https://www.permitgraph.org/p/201406047444) | Jun 4, 2014 | Completed: final sign-off Feb 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 26/f: interior non structural demolition of partiton and ceiling | $6,000 |
| [201405276738](https://www.permitgraph.org/p/201405276738) | May 27, 2014 | Completed: final sign-off Jun 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | electrical/lighting permit refer to t.i. #2013.1024.0112 | $500 |
| [201405216344](https://www.permitgraph.org/p/201405216344) | May 21, 2014 | Completed: final sign-off Nov 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | addition of 1 ea 1 ton heat pump. | $15,000 |
| [201405135650](https://www.permitgraph.org/p/201405135650) | May 13, 2014 | Never finaled: issued Jun 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1st floor - provide a modification of the (e) fire alarm system on 1st fl. remove (3) ceiling speaker/strobes, relocate (1) existing control relay, add new (1) duct detector, add new (1) monitor modu… | $8,244 |
| [201405135654](https://www.permitgraph.org/p/201405135654) | May 13, 2014 | Completed: final sign-off Aug 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide a modification of the existing fire alarm system on 10th floor. remove 10 existing strobes, remove 16 existing speakers, install 1 control relay fore elevator lobby door unlock, install 1 smo… | $12,034 |
| [201404092817](https://www.permitgraph.org/p/201404092817) | Apr 9, 2014 | Never finaled: issued Apr 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | replace 8 pendent sprinklers with 8 upright sprinklers and add one pendent. gc to #201403059900 | $4,000 |
| [201404022320](https://www.permitgraph.org/p/201404022320) | Apr 2, 2014 | Completed: final sign-off Apr 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | new outside air fan and associated ductwork on the second floor. | $35,000 |
| [201404012165](https://www.permitgraph.org/p/201404012165) | Apr 1, 2014 | Never finaled: issued Apr 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | on 2nd floor - provide a modification of the existing fire alarm system. the addition shall consist of providing the following: adding 2 new duct smoke detectors. adding 2 new control relays. | $7,153 |
| [201403100296](https://www.permitgraph.org/p/201403100296) | Mar 10, 2014 | Completed: final sign-off May 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 1st floor: sprinkler ti consisting of 5 pendent sprinklers being replaced with 5 upright sprinklers and 3 relocated sprinklers. ti #201310240112. | $3,968 |
| [201403059900](https://www.permitgraph.org/p/201403059900) | Mar 5, 2014 | Completed: final sign-off May 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Alsterlind Construction Inc.](https://www.permitgraph.org/contractor/alsterlind-construction-inc-679220) | tenant improvement from existing food retail to new food retail, including new service area, partition walls, casework, interior lighting, plumbing and electrical work. | $67,900 |
| [201312244946](https://www.permitgraph.org/p/201312244946) | Dec 24, 2013 | Never finaled: issued Jan 2014, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) |  | 1st floor. installation of giles fsh-6 ventless hood. | $16,000 |
| [201312174414](https://www.permitgraph.org/p/201312174414) | Dec 17, 2013 | Completed: final sign-off Jan 2015 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | ground fl. (2) two new unisex restrooms & aesthetic. upgrades to the ground common area. mep. under seperate permit. | $300,000 |
| [201311202454](https://www.permitgraph.org/p/201311202454) | Nov 20, 2013 | Never finaled: issued Nov 2013, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | adding one new control relay for activation of fire hat light due to elevator modernization. | $4,788 |
| [201310240112](https://www.permitgraph.org/p/201310240112) | Oct 24, 2013 | Completed: final sign-off Jun 2014 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | gb01 (1st floor)-upgrade (e) shell retail to new bakery. new electrical, plumbing, mechanical under seperate permit. sprinklers and fire alarm separate permit. | $15,000 |
| [201308154364](https://www.permitgraph.org/p/201308154364) | Aug 15, 2013 | Completed: final sign-off Aug 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 26th floor-alteration of partitions in a vacant floor per ab-017 | $25,250 |
| [201307161929](https://www.permitgraph.org/p/201307161929) | Jul 16, 2013 | Completed: final sign-off Aug 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1st floor:provide modification of the extg fire alarm system for partial tenant build out on the 1st floor. the addition shall consist of providing the following: add one new booster power supply, on… | $8,000 |
| [201307121668](https://www.permitgraph.org/p/201307121668) | Jul 12, 2013 | Completed: final sign-off Nov 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 3rd floor-suite #350-ti includes demo of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety are design build & submitted f… | $90,000 |
| [201304235189](https://www.permitgraph.org/p/201304235189) | Apr 23, 2013 | Completed: final sign-off Jun 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) |  | 2nd floor-modification of (e) fire alarm system for partial tenant build out on 2nd fl. add 10 new detectors, 3 new strobes, 10 new speaker/strobes, remove 4 (e) speakers & 11 (e) strobes. | $8,000 |
| [201211194470](https://www.permitgraph.org/p/201211194470) | Nov 19, 2012 | Never finaled: issued Nov 2012, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | modify (e) f.a. system for partial 1/f & 2/f, addition consists 2 new duct detectors, 2 new control relays, 7 new strobes, 2 of those strobes are weather proof, 2 new ct2's, 2 new control relays and… |  |
| [201211194471](https://www.permitgraph.org/p/201211194471) | Nov 19, 2012 | Completed: final sign-off Apr 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 13th floor-modify (e) f.a. system-addition includes 4 new duct detectors, 4 new control relays, 5 new strobes, 19 new speaker/strobes. relocate 2 9e) smoke detectors, 2 (e) pull stations & 2 (e) stro… | $12,900 |
| [201208157392](https://www.permitgraph.org/p/201208157392) | Aug 15, 2012 | Completed: final sign-off Jan 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ground floor-provide a modification of (e) f.a system for partial tenant build out-addition shall consist of providing the following: add 1 new strobe, 2 ceiling speakers, relocate 2 (e) strobes, & 1… | $8,477 |
| [201206122390](https://www.permitgraph.org/p/201206122390) | Jun 12, 2012 | Never finaled: issued Jun 2012, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1st & 2nd floor provide a modification of the exisitng fire alarm system for partial tenant build out on partial 1st & 2nds floor. add 2 duct det, 2 control relays, 5 new strobes, 2 ct2, & 1 speaker,… | $10,426 |
| [201201202607](https://www.permitgraph.org/p/201201202607) | Jan 20, 2012 | Expired or cancelled: expired Sep 2013 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 2nd floor-demolition of non structural partitions, new non structural partitions. m.e.p, fire sprinklers & life safety under seperate permit | $45,000 |
| [201112130611](https://www.permitgraph.org/p/201112130611) | Dec 13, 2011 | Completed: final sign-off Jan 2012 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | electric work related to 201110267619. work to include lighting, power for spec suites. includes elec title 24 calcs | $20,897 |
| [201111239489](https://www.permitgraph.org/p/201111239489) | Nov 23, 2011 | Completed: final sign-off Feb 2012 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 22nd floor-tenant improvement/relocate & add notification only | $5,460 |
| [201110267616](https://www.permitgraph.org/p/201110267616) | Oct 26, 2011 | Completed: final sign-off Feb 2012 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | demolition of non structural acoustic ceilig and installation of new non structural acoustic ceiling. all new mechanical and electrical will be design build & submitted separately. | $39,331 |
| [201110267619](https://www.permitgraph.org/p/201110267619) | Oct 26, 2011 | Completed: final sign-off Jan 2012 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | demolition of non structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted separately | $39,456 |
| [201108192838](https://www.permitgraph.org/p/201108192838) | Aug 19, 2011 | Completed: final sign-off Sep 2011 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3rd floor modify the fire alarm system for tenant build out. the upgrade system shall include the following: add (2) ceiling strobes, (2) ceiling speaker/strobes. | $8,662 |
| [201104113849](https://www.permitgraph.org/p/201104113849) | Apr 11, 2011 | Completed: final sign-off Jan 2012 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | modify fa system for t. i.build out on flrs 18, 19, 20, 21, 22, 23 & 24. adding 22 smoke detectors, 27 duct det. w/ 27 controlrelays, 143 speaker strobes, 32 strobes and 2 input modules. | $81,000 |
| [201104113831](https://www.permitgraph.org/p/201104113831) | Apr 11, 2011 | Completed: final sign-off Jul 2011 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | unit #2350-modify fire alarm system for tenant build out, adding 4 speaker strobes & 2 strobes | $6,250 |
| [201012015908](https://www.permitgraph.org/p/201012015908) | Dec 1, 2010 | Completed: final sign-off Jan 2011 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 11th floor-construct one (n) private office in (e) office space. reconfigure (e) lighting & power outlets. mechanical/life safety to be design build under seperate permit. | $12,000 |
| [200904035479](https://www.permitgraph.org/p/200904035479) | Apr 3, 2009 | Completed: final sign-off Apr 2009 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | to complete work and obtain final inspection for work approved under pa # 200602033718. ref app # 200601061633 | $2,500 |
| [200812228959](https://www.permitgraph.org/p/200812228959) | Dec 22, 2008 | Expired or cancelled: expired Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | demolition of existing suspended accoustic ceiling, installation of new gypsum board ceiling. | $9,100 |
| [200811207019](https://www.permitgraph.org/p/200811207019) | Nov 20, 2008 | Completed: final sign-off Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 17th floor: to complete work and obtain final inspection for work approved under pa #200802285813 |  |
| [200806164459](https://www.permitgraph.org/p/200806164459) | Jun 16, 2008 | Never finaled: issued Dec 2008, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 17th floor: demolition of (e) suspended accoustic ceiling, installation of new gypsum board ceiling. | $9,100 |
| [200803257929](https://www.permitgraph.org/p/200803257929) | Mar 25, 2008 | Completed: final sign-off Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | hvac work on the 17th floor. ref. pa# 2007/12/31/1643 fire alarm seperate permit. | $75,000 |
| [200803247801](https://www.permitgraph.org/p/200803247801) | Mar 24, 2008 | Completed: final sign-off Sep 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ti for fire alarm on the 14th floor. adding or replacing 23 strobes,7 speakers, 2 smoke detectors and 16 duct detectors for new fan units located on this floor. floor is fully sprinklered. | $18,984 |
| [200802285813](https://www.permitgraph.org/p/200802285813) | Feb 28, 2008 | Expired or cancelled: expired Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 17th floor-add 12 new strobes to complete coverage of new tenant space. final & test 12 strobes | $14,437 |
| [200801243167](https://www.permitgraph.org/p/200801243167) | Jan 24, 2008 | Expired or cancelled: expired Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate fire sprinklers per 17th floor - relocate fire sprinklers per tenant improvement,, 143 total heads, 143 relocated, 10 plugged heads. | $21,000 |
| [200801172717](https://www.permitgraph.org/p/200801172717) | Jan 17, 2008 | Expired or cancelled: expired Dec 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | final & test. add (1) new smk detector to idf room for coverage for 2 new fsd's. (1) new duct det. to cover new fsd. ( 17) new strobes to complete coverage of new tenant space, relocate (7) speakers… | $15,250 |
| [200710014180](https://www.permitgraph.org/p/200710014180) | Oct 1, 2007 | Never finaled: issued Oct 2007, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | install 3 strobes on the 4th and 10th floor | $5,663 |
| [200710014184](https://www.permitgraph.org/p/200710014184) | Oct 1, 2007 | Never finaled: issued Oct 2007, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | install 2 strobes on the 6th and 7th floor | $4,388 |
| [200705232060](https://www.permitgraph.org/p/200705232060) | May 23, 2007 | Completed: final sign-off Oct 2007 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 4 fire sprinklers on 7th floor only. | $1,250 |
| [200701051032](https://www.permitgraph.org/p/200701051032) | Jan 5, 2007 | Completed: final sign-off Jan 2007 | [100 01st St](https://www.permitgraph.org/a/3721/004) |  | renew pa# 2006/06/29/5325 & pa# 2006/06/20/4471 for final inspection only. |  |
| [200612280662](https://www.permitgraph.org/p/200612280662) | Dec 28, 2006 | Completed: final sign-off Mar 2007 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-1 2nd fl, el | $70,000 |
| [200606295325](https://www.permitgraph.org/p/200606295325) | Jun 29, 2006 | Expired or cancelled: expired Jan 2007 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [R.M.R. Construction Company](https://www.permitgraph.org/contractor/r-m-r-construction-company-404737) | revision to appl#200606204471 delete mechanical & lighting, life safety on oti-1 |  |
| [200606204471](https://www.permitgraph.org/p/200606204471) | Jun 20, 2006 | Expired or cancelled: expired Jan 2007 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [R.M.R. Construction Company](https://www.permitgraph.org/contractor/r-m-r-construction-company-404737) | oti-1 8f el,me,ls,sp | $9,956 |
| [200602073982](https://www.permitgraph.org/p/200602073982) | Feb 7, 2006 | Never finaled: issued Feb 2006, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 3rd floor, me | $6,000 |
| [200602073986](https://www.permitgraph.org/p/200602073986) | Feb 7, 2006 | Never finaled: issued Feb 2006, no final | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 8th fl me | $4,000 |
| [200602033718](https://www.permitgraph.org/p/200602033718) | Feb 3, 2006 | Expired or cancelled: expired Feb 2009 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2, 3rd floor, sprinkler only. ref oti-1, pa# 2006/01/06/1633. | $2,500 |
| [200601061633](https://www.permitgraph.org/p/200601061633) | Jan 6, 2006 | Expired or cancelled: expired Nov 2008 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1, 3rd floor, el, me, ls, sp. | $33,279 |
| [200510206112](https://www.permitgraph.org/p/200510206112) | Oct 20, 2005 | Completed: final sign-off Oct 2005 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | oti-4, 26th floor, ls. | $22,000 |
| [200509274012](https://www.permitgraph.org/p/200509274012) | Sep 27, 2005 | Completed: final sign-off Oct 2005 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2 26th fl el me | $47,000 |
| [200506104805](https://www.permitgraph.org/p/200506104805) | Jun 10, 2005 | Completed: final sign-off Jul 2005 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | demolition only interior partitions. | $20,000 |
| [200505101996](https://www.permitgraph.org/p/200505101996) | May 10, 2005 | Expired or cancelled: expired Oct 2006 | [100 01st St](https://www.permitgraph.org/a/3721/004) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1, 10th floor, el, me, ls, sp. | $20,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (39), [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) (16), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (8), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (6), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (4), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (3), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (2), [R.M.R. Construction Company](https://www.permitgraph.org/contractor/r-m-r-construction-company-404737) (2), [Alsterlind Construction Inc.](https://www.permitgraph.org/contractor/alsterlind-construction-inc-679220), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808)
- Architects: [Steven Lawler](https://www.permitgraph.org/professional/steven-lawler-C29399) (2), [Gary Nichols](https://www.permitgraph.org/professional/gary-nichols-C170290), [Greg A. Sheppard](https://www.permitgraph.org/professional/greg-a-sheppard-C26557), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144), [Rebecca Amato](https://www.permitgraph.org/professional/rebecca-amato-C25700), [Rebecca Amato](https://www.permitgraph.org/professional/rebecca-amato-C25706), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087), [Thomas Thompson](https://www.permitgraph.org/professional/thomas-thompson-C21470)
- Engineers: [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Levi Malabuyo](https://www.permitgraph.org/professional/levi-malabuyo-26141)
- Authorized agents: [Thomas Brady](https://www.permitgraph.org/professional/thomas-brady-381218)
- Designers: [Asd](https://www.permitgraph.org/professional/asd-C32725), [Thomas Thompson](https://www.permitgraph.org/professional/thomas-thompson-C21470)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.