# 160 Spear St

Block 3717, lot 010. Page: https://www.permitgraph.org/a/3717/010

- City's use: Commercial Office
- Built: 1985
- Stories: 19
- Lot: 9,453 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

130 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202605221786](https://www.permitgraph.org/p/202605221786) | May 22, 2026 | Completed: final sign-off Jul 2026 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| [202511129387](https://www.permitgraph.org/p/202511129387) | Nov 12, 2025 | In progress: filed Nov 2025, not yet issued | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Air Systems Of Sacramento](https://www.permitgraph.org/contractor/air-systems-of-sacramento-406794) | 14/f: provide (n) cu and fc to serve av production room. cu and fc to be connected onto existing fire alarm system (by others). mount cu in ceiling. condensate to be piped to nearest termination poin… | $9,500 |
| [202112063712](https://www.permitgraph.org/p/202112063712) | Dec 6, 2021 | Completed: final sign-off Jan 2022 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | fire sprinkler: relocate 12, add 3 and remove 12 pendant sprinlers. install 18 new upright sprinklers. ref t.i. pa202106293445. | $7,500 |
| [202106293445](https://www.permitgraph.org/p/202106293445) | Jun 29, 2021 | Completed: final sign-off Apr 2022 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 10th floor: interior demo of non structural elements. construction of new offices, conference and pantry, mep, life safety and sprinkler permit under seperate permit | $325,000 |
| [201808177662](https://www.permitgraph.org/p/201808177662) | Aug 17, 2018 | Never finaled: issued Aug 2018, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | electrical - maintain some (e) lighting. 2nd fl. & 16th fl. restroom only. title 24 ref 201807063910 & 2018.07.06.3909 | $10,000 |
| [201808177661](https://www.permitgraph.org/p/201808177661) | Aug 17, 2018 | Never finaled: issued Aug 2018, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | mechanical - demo ductwork and install ductwork, suite 214. ref.2018.07.06.3910 | $7,000 |
| [201807104079](https://www.permitgraph.org/p/201807104079) | Jul 10, 2018 | Completed: final sign-off Nov 2019 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permit | $86,250 |
| [201807063909](https://www.permitgraph.org/p/201807063909) | Jul 6, 2018 | Never finaled: issued Jul 2018, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 16th floor: upgrade barrier removal and replace all interior restroom, finishes, include new lighting. new toilet partitions, sink and finishes | $70,000 |
| [201807063889](https://www.permitgraph.org/p/201807063889) | Jul 6, 2018 | Never finaled: issued Jul 2018, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 2nd floor:replace all interior restroom, finishes, new lighting, toilet partitions, sink and finishes "barrier removal" | $70,000 |
| [201807063910](https://www.permitgraph.org/p/201807063910) | Jul 6, 2018 | Completed: final sign-off Nov 2018 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | # 214: demo and construction new partitions, glazing, door, and millwork. | $85,000 |
| [201802060477](https://www.permitgraph.org/p/201802060477) | Feb 6, 2018 | Completed: final sign-off Jun 2018 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 11th flr - electrical work for ti ref 201801088016 maher na | $2,000 |
| [201801088016](https://www.permitgraph.org/p/201801088016) | Jan 8, 2018 | Completed: final sign-off Jun 2018 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | suite 1100 - ti to include non structural partitions, doors, millwork. mep under sep permit maher na | $40,000 |
| [M796467](https://www.permitgraph.org/p/M796467) | Jun 13, 2017 | Never finaled: issued Jun 2017, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | streetspace |  |
| [201603081409](https://www.permitgraph.org/p/201603081409) | Mar 8, 2016 | Completed: final sign-off Aug 2016 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 17th flr: mech & elect for ti. for ref pa 2015 1221 5597 maher na | $15,000 |
| [201412224275](https://www.permitgraph.org/p/201412224275) | Dec 22, 2014 | Completed: final sign-off Jul 2015 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision tp pa #2014/0627/9708. interconnecting stair from 17 to 18th floors. |  |
| [201412153745](https://www.permitgraph.org/p/201412153745) | Dec 15, 2014 | Completed: final sign-off Jul 2015 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision appl. 2014.0627.9702. reviewed under t-24 code prior to july 1, 2014. revision include it room no longer rated as per ab-060. misc. reconfiguration of rooms, rcp, power and signal and doors.… |  |
| [201410068147](https://www.permitgraph.org/p/201410068147) | Oct 6, 2014 | Completed: final sign-off Feb 2015 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 18th floor suite 1800 -revision to appl #2014.0627.9707 tenant improvement : reduction of scope of work to architectural, mechanical & electrical. n/a maher ordinance |  |
| [201406279707](https://www.permitgraph.org/p/201406279707) | Jun 27, 2014 | Never finaled: issued Sep 2014, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 18th floor: interior t.i. to suite 1800. construct new conference rooms, focus rooms, break room. fire, life safety structural and sprinklers are under seperate permit. n/a for the maher ordinance #1… | $986,475 |
| [201406279708](https://www.permitgraph.org/p/201406279708) | Jun 27, 2014 | Completed: final sign-off Jul 2015 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required ** | $260,000 |
| [201406279702](https://www.permitgraph.org/p/201406279702) | Jun 27, 2014 | Completed: final sign-off Jul 2015 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 17th floor: interior t.i. to suite 1700. construct new conference rooms, focus rooms break room. fire, life safety, structural and sprinklers are under seperate permit. n/a for the maher ordinance #1… | $899,640 |
| [201312063495](https://www.permitgraph.org/p/201312063495) | Dec 6, 2013 | Completed: final sign-off Feb 2014 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | 18th floor #1800 - modify existing fire alarm system, adding 3 sync modules, 2 new strobes, 6 new speaker/strobes, & remove & replace 16 strobes. ref pa #2013.0820.4733 | $12,500 |
| [201308204733](https://www.permitgraph.org/p/201308204733) | Aug 20, 2013 | Never finaled: issued Aug 2013, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | #1800- interior office improvement, create new offices, conf. room & lounge, total 10,000 sq.ft. 10,000 sq ft for howard spear. | $200,000 |
| [201306260563](https://www.permitgraph.org/p/201306260563) | Jun 26, 2013 | Completed: final sign-off Sep 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | interior tenant improvement of existing office. new conference room & meeting rooms, remove part of demising wall. | $120,000 |
| [201304295708](https://www.permitgraph.org/p/201304295708) | Apr 29, 2013 | Completed: final sign-off Aug 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | suite #1600-interior improvements at (e) office area in this suite of removing (e) offices & enlrging (e) office. fire sprinkler under separate permit. | $20,000 |
| [201303293417](https://www.permitgraph.org/p/201303293417) | Mar 29, 2013 | Completed: final sign-off May 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | suite #1900-interior demo at (e) office area of removing non structural walls for market ready. demo & construct new ceiling. accessibility has not been reviewed and will be review under t.i. separat… | $45,000 |
| [201206263454](https://www.permitgraph.org/p/201206263454) | Jun 26, 2012 | Never finaled: issued Jun 2012, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | work in suite 1150: add 1-pendant sprinkler for tenant improvement. relocate 8-penent sprinkler for t.i. plug 3-(e) pendents for t.i. add branchline retraints on branch lines in area of work. | $6,990 |
| [201205170646](https://www.permitgraph.org/p/201205170646) | May 17, 2012 | Completed: final sign-off Aug 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | #1100:interior improvements in extg office area, removing extg walls and adding new offices/conf room. mep, sprinkler, fire life safety under separate permit. | $20,000 |
| [201205080053](https://www.permitgraph.org/p/201205080053) | May 8, 2012 | Completed: final sign-off Aug 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | revision to app#201203125894. remove furnature cubes from original permit. |  |
| [201204269227](https://www.permitgraph.org/p/201204269227) | Apr 26, 2012 | Expired or cancelled: expired Oct 2014 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | interior improvements at (e) office area in the suite 250. remove (e) offices and add new office/conf room. no mechanical. | $21,000 |
| [201203276953](https://www.permitgraph.org/p/201203276953) | Mar 27, 2012 | Completed: final sign-off Aug 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | remodeling an existing tenant area space. add return air registers to new offices as need. atler 16 existing reheat to meet new layout. rework 9 existing cooling only vav to meet new layout. relocate… | $20,000 |
| [201203226696](https://www.permitgraph.org/p/201203226696) | Mar 22, 2012 | Completed: final sign-off May 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | #240:interior improvements at extg office area in this suite of removing extg offices and adding new offices and new conf. room in suite #240 | $35,000 |
| [201203125894](https://www.permitgraph.org/p/201203125894) | Mar 12, 2012 | Completed: final sign-off Aug 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | interior improvments at existing office area on 14th floor. remove e offices and create new offices and conference rooms | $250,000 |
| [201203015175](https://www.permitgraph.org/p/201203015175) | Mar 1, 2012 | Completed: final sign-off Jul 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Wci-Gc Inc](https://www.permitgraph.org/contractor/wci-gc-inc-603759) | suite 1750:commercial t.i. in extg office bldg, including new partitions, new kitchenette, new finishes. modifications to extg mechanical, plmg, electrical, fire sprinkler, and fire alarm systems req… | $125,000 |
| [201202013333](https://www.permitgraph.org/p/201202013333) | Feb 1, 2012 | Completed: final sign-off Mar 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | 8th & 9th floor suite 800 & 900 - add (1) 1.5 ton ac unit to server room, add exhaust fan to electrical room, add (2) reheat vav's for (2) new confernece room, rework (e) hvac to meet new layout. | $50,000 |
| [201201122173](https://www.permitgraph.org/p/201201122173) | Jan 12, 2012 | Completed: final sign-off Feb 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | structural drawings for remodel of e office suite. remove walls, add new walls and new steel beams | $18,000 |
| [201112140688](https://www.permitgraph.org/p/201112140688) | Dec 14, 2011 | Completed: final sign-off Aug 2012 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | 9/f - emodel (e) office suite. remove (e) walls and build new walls | $800,000 |
| [201112019945](https://www.permitgraph.org/p/201112019945) | Dec 1, 2011 | Completed: final sign-off Mar 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | unit #800: remodel e office suite, remove e walls and build new walls | $848,000 |
| [201101067931](https://www.permitgraph.org/p/201101067931) | Jan 6, 2011 | Completed: final sign-off Mar 2011 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | 11th floor-construct new walls, install new base cabinet & sink | $25,000 |
| [200912022460](https://www.permitgraph.org/p/200912022460) | Dec 2, 2009 | Completed: final sign-off May 2010 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | minor demolition. install new walls and doors | $20,000 |
| [200912022464](https://www.permitgraph.org/p/200912022464) | Dec 2, 2009 | Completed: final sign-off May 2010 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | tenant improvement. minor revision, installation of partitions and door | $8,000 |
| [200912022424](https://www.permitgraph.org/p/200912022424) | Dec 2, 2009 | Expired or cancelled: cancelled Jan 2026 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | tenant improvement, minor demolition, installation of new partitions & door | $8,000 |
| [200902192389](https://www.permitgraph.org/p/200902192389) | Feb 19, 2009 | Completed: final sign-off May 2010 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | minor demolition, installation of under grid partitions, new doors and sidelight. electrical,mechanical & plumbing under separate permit. | $75,000 |
| [200812168610](https://www.permitgraph.org/p/200812168610) | Dec 16, 2008 | Completed: final sign-off Feb 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | add 2 new pendent fire sprinklers. relocate 19 existing pendent sprinklers, plug 3 existing. upgrade seismic in work area. | $7,494 |
| [200812118260](https://www.permitgraph.org/p/200812118260) | Dec 11, 2008 | Completed: final sign-off Feb 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | #1020 - rework (e) hvac to meet new layout. add 1 2 ton. ductless split system for server. ref.200812027562. | $30,000 |
| [200812047795](https://www.permitgraph.org/p/200812047795) | Dec 4, 2008 | Completed: final sign-off Apr 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | re-work (e) hvac to meet new layout. addd two 5 ton water source heat pump to server/idf room. reference t.i. pa# 2008-1202-7559 | $30,000 |
| [200812027562](https://www.permitgraph.org/p/200812027562) | Dec 2, 2008 | Completed: final sign-off Feb 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | installation of new under grid partitions, base cabinet & sink. mep,sp and ls under separate permits. amend permit 200803116787 |  |
| [200812027559](https://www.permitgraph.org/p/200812027559) | Dec 2, 2008 | Completed: final sign-off Apr 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | installation of new under grid partitions, base cabinet and sink. install 1 hour partition. mep, ls and sp under seperate permit | $95,000 |
| [200811247173](https://www.permitgraph.org/p/200811247173) | Nov 24, 2008 | Completed: final sign-off Jan 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | tenant improvement for existing office space 240- mep, ls and sp separte permits | $45,000 |
| [200811186861](https://www.permitgraph.org/p/200811186861) | Nov 18, 2008 | Completed: final sign-off Jan 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Pankow Special Projects Lp](https://www.permitgraph.org/contractor/pankow-special-projects-lp-776365) | to obtain final inspection for work approved under 200803318331. al work has been completed. |  |
| [200805081624](https://www.permitgraph.org/p/200805081624) | May 8, 2008 | Completed: final sign-off Jul 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Pankow Special Projects Lp](https://www.permitgraph.org/contractor/pankow-special-projects-lp-776365) | 12th floor - resubmit/revise permit. plan change-meeting room location change, add new millwork & straigten out wall. originial 200804119517. | $5,000 |
| [200805081626](https://www.permitgraph.org/p/200805081626) | May 8, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | 10th floor - resubmit for corridor permit - installation lights. walls approved under pa# 2008-0311-6787 & 2008-0311-6789. |  |
| [200804300920](https://www.permitgraph.org/p/200804300920) | Apr 30, 2008 | Completed: final sign-off Jul 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | install under grid partitions, new sidelights, base cabinets & sink. mep & life safety to be submitted under seperate permit | $85,000 |
| [200804119517](https://www.permitgraph.org/p/200804119517) | Apr 11, 2008 | Completed: final sign-off Jul 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | install new walls, base cabinets & sidelights. mep under separate permit. fire/life safety under seperate permit. | $85,000 |
| [200803318333](https://www.permitgraph.org/p/200803318333) | Mar 31, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | revision to pa# 2008/03/04/6175 to install 1 hr fire rated wall around server room and new 60 min door on the 15th floor. | $1,000 |
| [200803318331](https://www.permitgraph.org/p/200803318331) | Mar 31, 2008 | Expired or cancelled: expired Jan 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | revision to pa# 2008/03/17/7242 to increase scope of work to include installation of new walls and non-rated doors on the 12th floor. mep, life safety under separate permit. | $5,000 |
| [200803278118](https://www.permitgraph.org/p/200803278118) | Mar 27, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) | remodeling an (e) tenant space. 1 new a/c unit for server room. altering new duct work | $30,000 |
| [200803177247](https://www.permitgraph.org/p/200803177247) | Mar 17, 2008 | Completed: final sign-off Jan 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | ti for 12th and 13th floor to install under grid partition walls, base carbinets and sink in break room, new doors, sidelights and prefabricated shower. mep and life safety work will be under separat… | $175,000 |
| [200803116787](https://www.permitgraph.org/p/200803116787) | Mar 11, 2008 | Completed: final sign-off Feb 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 10th floor- in suite 1020, suite 1030 and sutie 1040: installation of under grid walls, base cabinets and sinks. installation of sidelights. life safety, mep under seperate permits. | $100,000 |
| [200803116785](https://www.permitgraph.org/p/200803116785) | Mar 11, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 11th floor: revision to appl #200801092174 - door swing change. | $45,000 |
| [200803116789](https://www.permitgraph.org/p/200803116789) | Mar 11, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 10th floor-installation of under grid walls, new base cabinets and sinks. installation of sidelight. life safety and mep under seperate permits. | $110,000 |
| [200803116786](https://www.permitgraph.org/p/200803116786) | Mar 11, 2008 | Never finaled: issued Mar 2008, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 11th floor-revision to revise pa# 200801233102-door location change |  |
| [200803046229](https://www.permitgraph.org/p/200803046229) | Mar 4, 2008 | Completed: final sign-off Apr 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | 4th floor-add 3 and relocate 8 fire sprinklers for new wall layout | $2,800 |
| [200803046230](https://www.permitgraph.org/p/200803046230) | Mar 4, 2008 | Never finaled: issued Mar 2008, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | 11th floor-add 8 new fire sprinklers for new wall layout. relocate 2 (e) fire sprinklers for new wall layout. | $2,800 |
| [200803046175](https://www.permitgraph.org/p/200803046175) | Mar 4, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | 15th floor: tenant improvement - building news walls, minor demolition , installing new base cabinet, sink, new sidelights, 1-hr partition, new doors. mep and fire life safety under separate permit. | $85,000 |
| [200802054085](https://www.permitgraph.org/p/200802054085) | Feb 5, 2008 | Completed: final sign-off Apr 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Starlite Electric Inc.](https://www.permitgraph.org/contractor/starlite-electric-inc-716595) | install 6 strobes, 1 smoke detector, 4 speakers | $4,000 |
| [200801233102](https://www.permitgraph.org/p/200801233102) | Jan 23, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | ti on the 11th floor. minor demo of 1hr walls and installation of under grid wall, new doors, sidelights and patch 1hr walls. electrical, mechanical and plumbing under seperate permit | $98,000 |
| [200801092174](https://www.permitgraph.org/p/200801092174) | Jan 9, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | office tenant improvement on 11th floor. installation of under grid partitions, new doors, and side lights. patch one hour wall. minor demo of 1 hr wall. install new "s' doors in elevator lobby. spri… | $30,000 |
| [200801031740](https://www.permitgraph.org/p/200801031740) | Jan 3, 2008 | Completed: final sign-off Feb 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | office tenant improvement on 11th floor. removal of under grid partitions. installation of under grid partitions, sidelights, glazing, base cabinet and sink of break room. mep under separate permit.… | $85,000 |
| [200712271352](https://www.permitgraph.org/p/200712271352) | Dec 27, 2007 | Completed: final sign-off Apr 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | removal of one hour partition. removal & installation of under grid partitions. installation of new doors, sidelights and glazing, and one hour partition. mep under separate permit. replace 2 drinkin… | $90,000 |
| [200712271348](https://www.permitgraph.org/p/200712271348) | Dec 27, 2007 | Never finaled: issued Dec 2007, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | removal of one hour rated partitions. installation of one hour rated and under grid partitions. installation of new doors, sidelights, glazing and base cabinets. mep under separate permit. work on 10… | $190,000 |
| [200712180749](https://www.permitgraph.org/p/200712180749) | Dec 18, 2007 | Completed: final sign-off Jan 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 16th floor tenant improvements, relocate 6 fire sprinkler heads. | $1,400 |
| [200711299248](https://www.permitgraph.org/p/200711299248) | Nov 29, 2007 | Completed: final sign-off Jan 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | partial demo of (e) office. partition of 2 new offices from open area and new millwork, paint and finishes throughout. fire sprinklers and life safety and mep under separate permit. | $35,000 |
| [200711077511](https://www.permitgraph.org/p/200711077511) | Nov 7, 2007 | Never finaled: issued Nov 2007, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | suite #300- relocate 3 existing sprinkler heads and plug one existing head in suite 300 due to the office renovation approved permit aplication #200708230630. | $2,800 |
| [200711077580](https://www.permitgraph.org/p/200711077580) | Nov 7, 2007 | Expired or cancelled: expired Oct 2013 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 16th floor: tenant improvment to relocate door, patch with one hour wall. | $17,000 |
| [200709243444](https://www.permitgraph.org/p/200709243444) | Sep 24, 2007 | Completed: final sign-off Jun 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | 17th floor, suite 1700 - minor demolition, removing under grid ceiling partitions. (4) existing offices to remain. no tenant for suite. suite 1700 is a speculative space, we will try to market. insta… | $80,000 |
| [200708230630](https://www.permitgraph.org/p/200708230630) | Aug 23, 2007 | Completed: final sign-off Jun 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | tenant improvement on suite 330 to build 2 interior walls for office use. | $52,000 |
| [200708089073](https://www.permitgraph.org/p/200708089073) | Aug 8, 2007 | Completed: final sign-off Oct 2007 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) | suite #330-tenant improvement-minor demolition, building 4 new walls, build new breakroom and storage room. mechanical permit seperate and life safety. | $65,000 |
| [200608018149](https://www.permitgraph.org/p/200608018149) | Aug 1, 2006 | Completed: final sign-off Sep 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Starlite Electric Inc.](https://www.permitgraph.org/contractor/starlite-electric-inc-716595) | install 3 strobes, relocate 1 strobe, install 1 speaker. revision to appl#200607116134 |  |
| [200607065851](https://www.permitgraph.org/p/200607065851) | Jul 6, 2006 | Completed: final sign-off Sep 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | modfy existingsprinklersystem, relocate1firesprinkler head | $2,000 |
| [200606164292](https://www.permitgraph.org/p/200606164292) | Jun 16, 2006 | Completed: final sign-off Sep 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-1 18th floor, el. t.i. minor demolition,build new ceiling height partitions, new carpet and paint. | $22,000 |
| [200605262633](https://www.permitgraph.org/p/200605262633) | May 26, 2006 | Completed: final sign-off Aug 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-1 7th floor demowalls. 1, wall is a portion of the corridor,doors, buiild back corridor wall & office walls, & doors. | $45,000 |
| [200512160520](https://www.permitgraph.org/p/200512160520) | Dec 16, 2005 | Completed: final sign-off Apr 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | removal of partitions and doors for ste 1775 | $15,000 |
| [200512140304](https://www.permitgraph.org/p/200512140304) | Dec 14, 2005 | Completed: final sign-off Apr 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | electrical & lighting work on floor two. | $8,000 |
| [200512140310](https://www.permitgraph.org/p/200512140310) | Dec 14, 2005 | Completed: final sign-off Apr 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | lighting work on floor 18. | $8,000 |
| [200512140311](https://www.permitgraph.org/p/200512140311) | Dec 14, 2005 | Completed: final sign-off Mar 2006 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | electrical & lighting work on floor one. | $9,000 |
| [200507218296](https://www.permitgraph.org/p/200507218296) | Jul 21, 2005 | Completed: final sign-off Nov 2005 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | 18th floor only:istall 13 ceiling maint speaker, 14 wall mount strobes, 2 smoke detectors, | $31,360 |
| [200506225680](https://www.permitgraph.org/p/200506225680) | Jun 22, 2005 | Completed: final sign-off Nov 2005 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | oti-1 18/f el,me,ls,sp | $498,106 |
| [200310278625](https://www.permitgraph.org/p/200310278625) | Oct 27, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | modify fire sprinklers on the 7th floor for tenant improvements | $15,000 |
| [200310278627](https://www.permitgraph.org/p/200310278627) | Oct 27, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | provide fire sprinklers on the 6th floor | $15,000 |
| [200310278622](https://www.permitgraph.org/p/200310278622) | Oct 27, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | provide fire sprinklers on the 5th floor | $15,000 |
| [200309306235](https://www.permitgraph.org/p/200309306235) | Sep 30, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-2 6th fl, el, me | $100,000 |
| [200309255678](https://www.permitgraph.org/p/200309255678) | Sep 25, 2003 | Expired or cancelled: withdrawn Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-2 5th fl. el, me | $100,000 |
| [200309255680](https://www.permitgraph.org/p/200309255680) | Sep 25, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-2 7th fl. el, me | $100,000 |
| [200309195205](https://www.permitgraph.org/p/200309195205) | Sep 19, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-1 7th fl,-el, me, ls, sp | $250,000 |
| [200309175014](https://www.permitgraph.org/p/200309175014) | Sep 17, 2003 | Expired or cancelled: withdrawn Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-1 5th floor wl me ls sp | $250,000 |
| [200309175012](https://www.permitgraph.org/p/200309175012) | Sep 17, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-1 6th floor el me ls sp | $250,000 |
| [200309124607](https://www.permitgraph.org/p/200309124607) | Sep 12, 2003 | Completed: final sign-off Dec 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical work on 17th flr only; no increase in office space | $65,000 |
| [200309094255](https://www.permitgraph.org/p/200309094255) | Sep 9, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | remodel-renoval and addition of interior partitions, new fl and light fixtures, new finishes through | $70,000 |
| [200308192457](https://www.permitgraph.org/p/200308192457) | Aug 19, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | non-structural demolition of existing tenant improvements, ceiling, walls, carpet, lights, no change | $30,000 |
| [200308192459](https://www.permitgraph.org/p/200308192459) | Aug 19, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | non-structural demo, ceiling, walls, lights, no changes to sprinkler or life safety | $30,000 |
| [200308192461](https://www.permitgraph.org/p/200308192461) | Aug 19, 2003 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | floor 5, tenant improvement to follow- non-structural demolition of existing tenant improvements. ce | $30,000 |
| [200307240246](https://www.permitgraph.org/p/200307240246) | Jul 24, 2003 | Completed: final sign-off Dec 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | demolition & reconfiguration of office space on the 17th fl. no increase in space | $50,000 |
| [200112114958](https://www.permitgraph.org/p/200112114958) | Dec 11, 2001 | Completed: final sign-off Mar 2004 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Crk Construction](https://www.permitgraph.org/contractor/crk-construction-763458) | oti-1 2nd floor | $2,000 |
| [200109208816](https://www.permitgraph.org/p/200109208816) | Sep 20, 2001 | Expired or cancelled: expired Jan 2002 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) | final inspection of app#9923116 5th flr. |  |
| [200109208811](https://www.permitgraph.org/p/200109208811) | Sep 20, 2001 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) | 5th floor - oti-3, ls only | $3,000 |
| [200109208813](https://www.permitgraph.org/p/200109208813) | Sep 20, 2001 | Expired or cancelled: expired Jan 2002 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) | for final inspection of #895808 (app#9923755) 5th flr me, el sp |  |
| [200104237471](https://www.permitgraph.org/p/200104237471) | Apr 23, 2001 | Expired or cancelled: cancelled Nov 2001 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Crk Construction](https://www.permitgraph.org/contractor/crk-construction-763458) | oti-1 19th flr, ltg.mech, ls,spr | $15,115 |
| [200103073663](https://www.permitgraph.org/p/200103073663) | Mar 7, 2001 | Completed: final sign-off Mar 2001 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Turner Construction**See 210639****](https://www.permitgraph.org/contractor/turner-construction-see-210639-772270) |  | $7,000 |
| [200009190982](https://www.permitgraph.org/p/200009190982) | Sep 19, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-4 10th floor l/s | $15,000 |
| [200009110144](https://www.permitgraph.org/p/200009110144) | Sep 11, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-4 13th floor - ls | $20,000 |
| [200008238623](https://www.permitgraph.org/p/200008238623) | Aug 23, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti - 3 sp 10th floor | $40,000 |
| [200007195500](https://www.permitgraph.org/p/200007195500) | Jul 19, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-2, 10th floor, el, me | $300,000 |
| [200007195495](https://www.permitgraph.org/p/200007195495) | Jul 19, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-2, 13th floor, me, el | $200,000 |
| [200007175267](https://www.permitgraph.org/p/200007175267) | Jul 17, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-1 10th floor el, me, l/s, sp | $500,000 |
| [200006233545](https://www.permitgraph.org/p/200006233545) | Jun 23, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | demo of partitions/flooring /millwork/hvac/elec. | $25,000 |
| [200006162871](https://www.permitgraph.org/p/200006162871) | Jun 16, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  |  | $15,000 |
| [200005250980](https://www.permitgraph.org/p/200005250980) | May 25, 2000 | Completed: final sign-off Dec 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | replace existing corridor ceiling with new ceiling grid and tile relocate ceiling | $14,000 |
| [200004268255](https://www.permitgraph.org/p/200004268255) | Apr 26, 2000 | Completed: final sign-off Dec 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | change to exit doors at 1st compartment |  |
| [200004258146](https://www.permitgraph.org/p/200004258146) | Apr 25, 2000 | Completed: final sign-off Oct 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-2, el, me, ls, sp, 11th floor | $114,000 |
| [200004258124](https://www.permitgraph.org/p/200004258124) | Apr 25, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | furnish & install additonal devices to extg life safty system | $1,500 |
| [200004258129](https://www.permitgraph.org/p/200004258129) | Apr 25, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | furnish & install additional devices to extg life safety system | $1,520 |
| [200004258143](https://www.permitgraph.org/p/200004258143) | Apr 25, 2000 | Completed: final sign-off Oct 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-2, el, me, sp, 12th floor | $104,000 |
| [200004046244](https://www.permitgraph.org/p/200004046244) | Apr 4, 2000 | Completed: final sign-off Dec 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | furnish & install additional life safety to existing system | $3,600 |
| [200003214886](https://www.permitgraph.org/p/200003214886) | Mar 21, 2000 | Completed: final sign-off Oct 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-1, 11th floor- el, me, l/s, sp | $125,000 |
| [200003204818](https://www.permitgraph.org/p/200003204818) | Mar 20, 2000 | Completed: final sign-off Dec 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | oti-2 18th floor electrical mechanical sprinkler | $80,000 |
| [200002111684](https://www.permitgraph.org/p/200002111684) | Feb 11, 2000 | Completed: final sign-off May 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | oti-3, ls, 3rd floor | $7,400 |
| [20000126297](https://www.permitgraph.org/p/20000126297) | Jan 26, 2000 | Completed: final sign-off Dec 2000 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | remodel of office space. remodel 40% of space; demolish 10% of walls new carpet & paint | $100,000 |
| [20000120573](https://www.permitgraph.org/p/20000120573) | Jan 20, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) | oti-3, 6th floor, el & sp | $52,000 |
| [20000119435](https://www.permitgraph.org/p/20000119435) | Jan 19, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | add to (e) life safety | $2,000 |
| [20000111750](https://www.permitgraph.org/p/20000111750) | Jan 11, 2000 | Expired or cancelled: expired Sep 2003 | [160 Spear St](https://www.permitgraph.org/a/3717/010) |  | install new fm200 fire protection system on 6th flr | $27,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Legacy Partners C D S Inc](https://www.permitgraph.org/contractor/legacy-partners-c-d-s-inc-854328) (26), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (21), [Clinton Heating & A/C Inc](https://www.permitgraph.org/contractor/clinton-heating-a-c-inc-449414) (5), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (5), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (5), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (4), [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) (4), [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) (4), [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) (4), [Crk Construction](https://www.permitgraph.org/contractor/crk-construction-763458) (2), [Pankow Special Projects Lp](https://www.permitgraph.org/contractor/pankow-special-projects-lp-776365) (2), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (2), [Starlite Electric Inc.](https://www.permitgraph.org/contractor/starlite-electric-inc-716595) (2), [Air Systems Of Sacramento](https://www.permitgraph.org/contractor/air-systems-of-sacramento-406794), [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846), [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939), [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196), [Turner Construction**See 210639****](https://www.permitgraph.org/contractor/turner-construction-see-210639-772270), [Wci-Gc Inc](https://www.permitgraph.org/contractor/wci-gc-inc-603759)
- Architects: [Dong Chul Kim](https://www.permitgraph.org/professional/dong-chul-kim-C24140) (15), [D C Kim](https://www.permitgraph.org/professional/d-c-kim-24140) (2), [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609) (2), [Ken Eng](https://www.permitgraph.org/professional/ken-eng-C13241), [Matthew H.T. Ma](https://www.permitgraph.org/professional/matthew-h-t-ma-C31462), [Paul Ferro](https://www.permitgraph.org/professional/paul-ferro-C28809), [Sashikala Murthy](https://www.permitgraph.org/professional/sashikala-murthy-C39484), [Scott E Clement](https://www.permitgraph.org/professional/scott-e-clement-C36455), [Steve Suzuki/Douglas Zucher](https://www.permitgraph.org/professional/steve-suzuki-douglas-zucher-C12821), [Tim Murphy](https://www.permitgraph.org/professional/tim-murphy-C27780)
- Engineers: [Dc Kim](https://www.permitgraph.org/professional/dc-kim-C24140), [Emery Ojala](https://www.permitgraph.org/professional/emery-ojala-C4986), [Pak Hui](https://www.permitgraph.org/professional/pak-hui-S5227), [Santwant Bhatia](https://www.permitgraph.org/professional/santwant-bhatia-E10555)
- Designers: [Garry Westover](https://www.permitgraph.org/professional/garry-westover-406794)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3717/010.