# 121 Spear St

Block 3716, lot 021. Page: https://www.permitgraph.org/a/3716/021

- City's use: Commercial Retail
- Built: 1925
- Stories: 6
- Building: 236,161 sq ft
- Zoning: C3O
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202610229751](https://www.permitgraph.org/p/202610229751) | Oct 22, 2026 | In progress: issued Nov 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st f/ ste b18-19: selective interior demolition and new construction of elements including but not limited to interior partitions, door finishes, ceilings, light fixtures and millwork. mep, sprinkle… | $427,000 |
| [202608277272](https://www.permitgraph.org/p/202608277272) | Aug 27, 2026 | In progress: issued Sep 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 3/fl- mechanical modifications to improve cooling capabilities | $50,000 |
| [202607064561](https://www.permitgraph.org/p/202607064561) | Jul 6, 2026 | In progress: issued Jul 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 4/fl-deferred seismic anchoring for workout equipment for 202512192304 |  |
| [202606223642](https://www.permitgraph.org/p/202606223642) | Jun 22, 2026 | In progress: issued Jul 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 4th flr mep deferred pa#: 202512192304. | $266,400 |
| [202605221766](https://www.permitgraph.org/p/202605221766) | May 22, 2026 | Completed: final sign-off Jun 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | ref#: 202602186115; ste14b: t.i. installation of an exhaust fan serviing the single user restroom, elect and idf room. outside air fan serving air to hp1-1 thru 2-3. heat pumps to serve the new zones… | $245,000 |
| [202605221790](https://www.permitgraph.org/p/202605221790) | May 22, 2026 | Completed: final sign-off Jun 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls. | $239,000 |
| [202602186115](https://www.permitgraph.org/p/202602186115) | Feb 18, 2026 | Completed: final sign-off Jun 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm sy… | $800,000 |
| [202602025055](https://www.permitgraph.org/p/202602025055) | Feb 2, 2026 | Completed: final sign-off May 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of exi… |  |
| [202512302943](https://www.permitgraph.org/p/202512302943) | Dec 30, 2025 | Completed: final sign-off Jan 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 2nd floor. relocate (3) pendents, add (4) pendents. gcti # 202512041028 | $1,000 |
| [202512192304](https://www.permitgraph.org/p/202512192304) | Dec 19, 2025 | In progress: issued May 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with an expanded fitness area. deferred submittals: mep, fire sprinklers, fire alarm, security… | $450,000 |
| [202512182098](https://www.permitgraph.org/p/202512182098) | Dec 18, 2025 | Completed: final sign-off Feb 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 2nd fl ref pa #2025-1204-1028: addition to (e) edwards fire emergency voice/alarm communication system to accomodate new phone booths. | $17,000 |
| [202512041028](https://www.permitgraph.org/p/202512041028) | Dec 4, 2025 | Completed: final sign-off Feb 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 2nd floor: addition of 7 phone booths in office space. | $20,000 |
| [202511149668](https://www.permitgraph.org/p/202511149668) | Nov 14, 2025 | Completed: final sign-off Mar 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [O C Mc Donald Co Inc](https://www.permitgraph.org/contractor/o-c-mc-donald-co-inc-177271) | 6/f: installation of 36k btu cooling system in a/v equipment room. | $62,480 |
| [202509266186](https://www.permitgraph.org/p/202509266186) | Sep 26, 2025 | Completed: final sign-off Dec 2025 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Cobe Construction Inc](https://www.permitgraph.org/contractor/cobe-construction-inc-835122) | floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification. | $28,526 |
| [202305238399](https://www.permitgraph.org/p/202305238399) | May 23, 2023 | Completed: final sign-off May 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [J & N Quality Enterprises](https://www.permitgraph.org/contractor/j-n-quality-enterprises-927350) | ste b12: (e) turbo chef microwave oven all (e) electrical, 2 waffle irons, all (e) electrical. no construction work done | $1,500 |
| [202305188065](https://www.permitgraph.org/p/202305188065) | May 18, 2023 | Completed: final sign-off Sep 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd fl: new non-structural glazing, door & security cameras. ref pa# 202202188359. | $50,000 |
| [202304246286](https://www.permitgraph.org/p/202304246286) | Apr 24, 2023 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ad Image Advertising](https://www.permitgraph.org/contractor/ad-image-advertising-1039860) | install 1 electric double faced wall sign "penelope's coffee & tea" | $4,000 |
| [202304246288](https://www.permitgraph.org/p/202304246288) | Apr 24, 2023 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ad Image Advertising](https://www.permitgraph.org/contractor/ad-image-advertising-1039860) | install 1 electric single faced wall sign "penelope's coffee & tea" | $7,500 |
| [202303214028](https://www.permitgraph.org/p/202303214028) | Mar 21, 2023 | Completed: final sign-off Mar 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 4/f: as-built f/a permit for 202208251216. change smoke detector to duct detector. add 2 relays, 1 add'l duct detector, 5 ceiling strobes, 1 two-way call box and 1 pull station. |  |
| [202212299385](https://www.permitgraph.org/p/202212299385) | Dec 29, 2022 | Completed: final sign-off Jun 2025 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) | decommission & removal of sprint site, returning to original condition. | $20,000 |
| [202212087885](https://www.permitgraph.org/p/202212087885) | Dec 8, 2022 | Never finaled: issued Dec 2022, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2/f fire sprinklers: relocate (2) pendents, (1) upright and add (1) upright. ref t.i. pa# 202210043727. | $2,200 |
| [202212077831](https://www.permitgraph.org/p/202212077831) | Dec 7, 2022 | Completed: final sign-off Dec 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | ste 220: provide & install 1 water source heat pump., 2 new ceiling mounted supply diffusers & new ductwork connecting to new heat pump. provide & install 2 new ceiling mounted return grills & sound… | $30,000 |
| [202211307413](https://www.permitgraph.org/p/202211307413) | Nov 30, 2022 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4th floor: mechanical only permit to demo & install new duct and hvac equipment. ref #202210194733. google phase 2. |  |
| [202211166627](https://www.permitgraph.org/p/202211166627) | Nov 16, 2022 | Completed: final sign-off Dec 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | new power and data for offices. new lighting and controls. ref app# 202210043727. | $2,000 |
| [202210194733](https://www.permitgraph.org/p/202210194733) | Oct 19, 2022 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f: mech only permit revision to remove (e) duct & hvac scope from areas in proposed not occupied areas on page m. 2.1. ref bpa#202206146333 |  |
| [202210043727](https://www.permitgraph.org/p/202210043727) | Oct 4, 2022 | Completed: final sign-off Dec 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | suite 220: ti project : creating two (n) offices. this involves removal of existing lights, new partitions, doors, glazing, power and data, ceiling grid and tile, mechanical, lighting & controls and… | $140,000 |
| [202209303520](https://www.permitgraph.org/p/202209303520) | Sep 30, 2022 | Completed: final sign-off Dec 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ad Image Advertising](https://www.permitgraph.org/contractor/ad-image-advertising-1039860) | replace existing wall sign lettering with new illuminated led channel letters (x2). | $6,000 |
| [202209303521](https://www.permitgraph.org/p/202209303521) | Sep 30, 2022 | Completed: final sign-off Dec 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ad Image Advertising](https://www.permitgraph.org/contractor/ad-image-advertising-1039860) | reface 1 blade sign with (e) electrical (nick the greek souvlaki & gyro house) | $600 |
| [202209011767](https://www.permitgraph.org/p/202209011767) | Sep 1, 2022 | Completed: final sign-off Sep 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | modification to (e) fire sprinkler system 1/f: add 2; 2/f add 4, change out/ relocate 4 sprinkler heads per t.i.202202188359 | $4,050 |
| [202208251216](https://www.permitgraph.org/p/202208251216) | Aug 25, 2022 | Completed: final sign-off Mar 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 4/f: f/a t.i. add (48) control relay module, (48) duct detectors, (66) speaker strobes, (29) strobes, (1) control relay, (5) smoke detectors, (1) synchronization output module | $25,100 |
| [202207259230](https://www.permitgraph.org/p/202207259230) | Jul 25, 2022 | Completed: final sign-off Nov 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4/f: add, relocate and change out fire sprinlers per t.i.. (e) seismic to remain. ref t.i. pa #202112023525. | $41,460 |
| [202206287315](https://www.permitgraph.org/p/202206287315) | Jun 28, 2022 | Completed: final sign-off Sep 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1/f lobby; rev to glass door. new hss steel beam and posts aded to support glass door. rev to pa 202202188359. |  |
| [202206216768](https://www.permitgraph.org/p/202206216768) | Jun 21, 2022 | Never finaled: filed Jun 2022, never issued | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4th floor: relocate (133) add (98) sprinkler heads per ti. reference #2021-1202-3525. job 21-679 | $81,375 |
| [202206146333](https://www.permitgraph.org/p/202206146333) | Jun 14, 2022 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layout | $400,000 |
| [202206096007](https://www.permitgraph.org/p/202206096007) | Jun 9, 2022 | Completed: final sign-off Sep 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st fl: revision to pa# 202203180339. changes to handrail at staircase |  |
| [202204252903](https://www.permitgraph.org/p/202204252903) | Apr 25, 2022 | Completed: final sign-off Sep 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | new convenience receptacle for future tenant space. new lighting & controls. reference #202203180339 |  |
| [202204081846](https://www.permitgraph.org/p/202204081846) | Apr 8, 2022 | Completed: final sign-off Jun 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | 1st fl: fire sprinkler permit (space b3 & b4). delete 6 pendent sprinklers and add 5 new upright sprinklers. | $2,500 |
| [202204081849](https://www.permitgraph.org/p/202204081849) | Apr 8, 2022 | Never finaled: issued Apr 2022, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | 1st fl: fire sprinkler permit (space b14). relocate 2 and delete 3 sprinklers. ti pa# 202010086136 | $2,000 |
| [202203180339](https://www.permitgraph.org/p/202203180339) | Mar 18, 2022 | Completed: final sign-off Sep 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered. | $450,000 |
| [202203099574](https://www.permitgraph.org/p/202203099574) | Mar 9, 2022 | Expired or cancelled: cancelled Apr 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire only correction permit only to change floor number from 5th fl to 4th floor on 202109218844. to allow for permit to then be cancelled |  |
| [202202188358](https://www.permitgraph.org/p/202202188358) | Feb 18, 2022 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included. | $6,241,495 |
| [202202188359](https://www.permitgraph.org/p/202202188359) | Feb 18, 2022 | Completed: final sign-off Jan 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | flrs 1,2: partial demo of non structural interior furring, ceilings and finishes. construction of non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. | $650,000 |
| [202201115731](https://www.permitgraph.org/p/202201115731) | Jan 11, 2022 | Completed: final sign-off Feb 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | p1 parking level - modify existing fire alarm system - add 1 heat detector inside trash room as per field inspector directions; bldg pa n/a | $2,826 |
| [202112144341](https://www.permitgraph.org/p/202112144341) | Dec 14, 2021 | Completed: final sign-off Feb 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | mechanical only: install new type ii hood over existing dishwasher, replace existing fc-3-13 (1 ton) with new 3-ton wshp. install new air distribution in existing dishroom. | $40,000 |
| [202112023525](https://www.permitgraph.org/p/202112023525) | Dec 2, 2021 | Completed: final sign-off Jun 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f: demo only permit of non-structural partitions, doors/frames/hardware, millwork, ceilings and finishes per ab-017. add temp barricade to maintain egress from occupied space | $80,000 |
| [202112013466](https://www.permitgraph.org/p/202112013466) | Dec 1, 2021 | Completed: final sign-off Jan 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4/f: changeout 199 sprinklers to core and shell conditions per t.i. ref permit 202105140410 | $44,775 |
| [202111293249](https://www.permitgraph.org/p/202111293249) | Nov 29, 2021 | Expired or cancelled: cancelled Jan 2026 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | suite b-07: interior remodel (non-structural). reducing size of current countertop. replacing wood tile with updated wood. adding shelves and menu screens. repainting, adding vinyl laminate flooring.… | $30,000 |
| [202110221020](https://www.permitgraph.org/p/202110221020) | Oct 22, 2021 | Completed: final sign-off May 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to permit #202102054120. furring out walls in ada stalls, because a riser is in the way to mount toilets. | $28,000 |
| [202109309552](https://www.permitgraph.org/p/202109309552) | Sep 30, 2021 | Completed: final sign-off Nov 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2/f: add 4, relocate 9, change out 1 sprinker heads per t.i. ref pa 202103166616. | $4,350 |
| [202109218844](https://www.permitgraph.org/p/202109218844) | Sep 21, 2021 | Expired or cancelled: cancelled Apr 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system - demo permit - upright protection upright (65) existing pendents & change out to upright sprks. | $13,000 |
| [202106172721](https://www.permitgraph.org/p/202106172721) | Jun 17, 2021 | Completed: final sign-off Aug 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | as-built for permit 2020-0928-5347 revise fire alarm sequence of operations to match existing field conditions. sequence of operations now indicates global shutdown of fans/heat pumps and global clos… |  |
| [202106162595](https://www.permitgraph.org/p/202106162595) | Jun 16, 2021 | Completed: final sign-off Jan 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd floor: mep deferred submittal to support architectural permit. relocate wshp and redistribute ductwork. ref. bldg pa 202103166616. | $50,000 |
| [202105251027](https://www.permitgraph.org/p/202105251027) | May 25, 2021 | Completed: final sign-off May 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | sign c: install 2 non-illuminated single-faced wall sign. (sign for future tenant) | $8,000 |
| [202105251028](https://www.permitgraph.org/p/202105251028) | May 25, 2021 | Completed: final sign-off May 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | sign a: install 1 illuminated single-faced canopy sign. for (future tenant) | $2,000 |
| [202105251026](https://www.permitgraph.org/p/202105251026) | May 25, 2021 | Completed: final sign-off May 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | sign b: install 1 non-illuminated double-faced projecting blade sign. for "rincon center" (include future tenant name) | $1,000 |
| [202105200763](https://www.permitgraph.org/p/202105200763) | May 20, 2021 | Completed: final sign-off Apr 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3rd, 5th, & 6th floor: ti #2021-0205-4120 modify existing fire alarm system. add (2) booster power supplies, (2) synchronization modules, (24) ceiling speaker/strobes, (30) ceiling strobes | $28,467 |
| [202105200748](https://www.permitgraph.org/p/202105200748) | May 20, 2021 | Completed: final sign-off Apr 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | replace extg non illuminated wall signs: "two rincon center" "121 spear". | $3,000 |
| [202105200751](https://www.permitgraph.org/p/202105200751) | May 20, 2021 | Completed: final sign-off Apr 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | replacement of tenant i.d. sign (electrical) "rincon parking" | $3,000 |
| [202105200743](https://www.permitgraph.org/p/202105200743) | May 20, 2021 | Completed: final sign-off Apr 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | sign type a- retail blade id qty 6. fabricate and install primary id blade, internally non-illuminated; wall mounting. signage is within "transit center special sign district" | $8,000 |
| [202105200750](https://www.permitgraph.org/p/202105200750) | May 20, 2021 | Completed: final sign-off Apr 2024 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | replacement of tenant i.d. sign (electrical)"rincon center" | $3,000 |
| [202105039698](https://www.permitgraph.org/p/202105039698) | May 3, 2021 | Never finaled: issued Jun 2021, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | removal & replacement of sections of 1st floor slab. interior location. | $15,000 |
| [202103166616](https://www.permitgraph.org/p/202103166616) | Mar 16, 2021 | Completed: final sign-off Feb 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under sepa… | $737,500 |
| [202102255371](https://www.permitgraph.org/p/202102255371) | Feb 25, 2021 | Completed: final sign-off Oct 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 18 pendent sprinklers in the restrooms on the 3rd, 5th & 6th floors. t.i. ref# 2021-02-05-4120 | $27,000 |
| [202102054120](https://www.permitgraph.org/p/202102054120) | Feb 5, 2021 | Completed: final sign-off May 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls. | $700,000 |
| [202012140935](https://www.permitgraph.org/p/202012140935) | Dec 14, 2020 | Completed: final sign-off Sep 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065) | ste# 250: mechanical improvements. ref pa# 201912200101 | $90,000 |
| [202012090676](https://www.permitgraph.org/p/202012090676) | Dec 9, 2020 | Completed: final sign-off Mar 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | fire sprinkler permit. relocate 2 sprinklers on the 2nd floor. | $1,000 |
| [202011058326](https://www.permitgraph.org/p/202011058326) | Nov 5, 2020 | Never finaled: issued Dec 2020, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sotello Graphic Associates](https://www.permitgraph.org/contractor/sotello-graphic-associates-767483) | make & install 10 evacuation maps | $9,400 |
| [202010086136](https://www.permitgraph.org/p/202010086136) | Oct 8, 2020 | Completed: final sign-off Sep 2022 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | removal of (e) retail, plumb, electr & lighting fixtures, removal of (e) walls, doors & finishes. patching & preparation for future tenant improvement build-out. space to remain vacant per sf ab-017.… | $65,000 |
| [202009285329](https://www.permitgraph.org/p/202009285329) | Sep 28, 2020 | Completed: final sign-off Oct 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | suite b10, modify existing fa system, add (2)duct detectors, (1)single input module, (2)control relays, (3)smoke detectors, (3)speaker/strobes. ti pa 201911056534 | $17,700 |
| [202009285347](https://www.permitgraph.org/p/202009285347) | Sep 28, 2020 | Completed: final sign-off May 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | f/a ti on 2nd fl, suite 250: add 1 booster power supply, 1 syncrhonization output module, 1 speaker/strovbe, 5 duct smoke detector & 5 control relays, relocate 1 existing speaker/strobe. ref pa# 2019… | $17,374 |
| [202009265162](https://www.permitgraph.org/p/202009265162) | Sep 26, 2020 | Completed: final sign-off Oct 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | suite b11: modify (e) fire alarm system, add (1) duct detector, (1) control relay, (1) single input module, (8) speaker/strobes | $18,033 |
| [202009214591](https://www.permitgraph.org/p/202009214591) | Sep 21, 2020 | Completed: final sign-off Nov 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | level 2: voluntary modify (e) fire alarm system. add 1 control relay to deactivate newly install delayed egress crash bar. | $18,315 |
| [202009033393](https://www.permitgraph.org/p/202009033393) | Sep 3, 2020 | Completed: final sign-off Oct 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 2nd fl: remove and reconfigure fire sprinkler piping to (14) fire sprinklers. install new branch line restraints where indicated. ref pa# 201912200101 | $8,000 |
| [202003167156](https://www.permitgraph.org/p/202003167156) | Mar 16, 2020 | Completed: final sign-off Aug 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | ground floor: fire sprinklers relocate 8 pendants. ref t.i. pa201911056533. maher n/a. | $3,000 |
| [202003167155](https://www.permitgraph.org/p/202003167155) | Mar 16, 2020 | Completed: final sign-off Aug 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | ground floor: fire sprinklers relocate 13 pendants & remove 2 pendants. ref t.i. pa201911056533. maher n/a. | $4,000 |
| [202003096570](https://www.permitgraph.org/p/202003096570) | Mar 9, 2020 | Expired or cancelled: cancelled Sep 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | new wall opening thru extg concrete shear walls. | $20,000 |
| [202003096567](https://www.permitgraph.org/p/202003096567) | Mar 9, 2020 | Completed: final sign-off Mar 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | installation of roof top mechanical concrete platform for mechanical equipment support. | $15,000 |
| [202003096569](https://www.permitgraph.org/p/202003096569) | Mar 9, 2020 | Never finaled: issued Jun 2020, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | scope includes concrete slab infill of extg openings on ground level. this is an interior location where extg slab is being replaced. | $10,000 |
| [201912200101](https://www.permitgraph.org/p/201912200101) | Dec 20, 2019 | Completed: final sign-off Sep 2021 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit | $2,343,634 |
| [201912119186](https://www.permitgraph.org/p/201912119186) | Dec 11, 2019 | Never finaled: issued Aug 2020, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) | electric wall sign. **maher n/a** | $12,000 |
| [201912068856](https://www.permitgraph.org/p/201912068856) | Dec 6, 2019 | Completed: final sign-off Feb 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | ground fl suite b8: demolition of non-structural walls & finishes. | $20,000 |
| [201911056507](https://www.permitgraph.org/p/201911056507) | Nov 5, 2019 | Completed: final sign-off Nov 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 2nd floor: add 2 speker/strobe, 1 relay, 1 input/output module, 1 duct smoke det. ref app#201903225982 | $14,880 |
| [201911056534](https://www.permitgraph.org/p/201911056534) | Nov 5, 2019 | Completed: final sign-off Dec 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | ground fl. suite b-10 (hair salon) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work,… | $200,000 |
| [201911056533](https://www.permitgraph.org/p/201911056533) | Nov 5, 2019 | Completed: final sign-off Dec 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | ground fl.suite b-11; (optician) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, bu… | $200,000 |
| [201910316135](https://www.permitgraph.org/p/201910316135) | Oct 31, 2019 | Completed: final sign-off Dec 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd floor: mechanical drawings to support approved arch set. demo extg duct & equipment. install new heat pumps piping and duct work | $50,000 |
| [M1154207](https://www.permitgraph.org/p/M1154207) | Oct 17, 2019 | Never finaled: issued Oct 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space w/mta |  |
| [201910093965](https://www.permitgraph.org/p/201910093965) | Oct 9, 2019 | Completed: final sign-off Nov 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 2/f: fire sprinklers, 1 add, 1 relocated. ref 201908219421 | $1,500 |
| [201909202205](https://www.permitgraph.org/p/201909202205) | Sep 20, 2019 | Completed: final sign-off Oct 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | fire sprinlker permit. remove 27 pendent sprinlkers and install 32 upright sprinklers on 1st fl ref 201907196392 maher not req | $7,000 |
| [201909192180](https://www.permitgraph.org/p/201909192180) | Sep 19, 2019 | Completed: final sign-off Feb 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | ground floor: t-24 mechanical for work under app#201905301962. n/a for maher |  |
| [201908219421](https://www.permitgraph.org/p/201908219421) | Aug 21, 2019 | Completed: final sign-off Dec 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd flr - new vetsible, demising a large conference room into 2 meeting rooms & add a phone room and upgrade pantry area. maher n/a. | $485,000 |
| [M1122688](https://www.permitgraph.org/p/M1122688) | Aug 12, 2019 | Never finaled: issued Aug 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space w/mta |  |
| [201907297215](https://www.permitgraph.org/p/201907297215) | Jul 29, 2019 | Completed: final sign-off Feb 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | g/f: title 24 electrical compliance for pa 201905301962. maher n/a. |  |
| [201907196392](https://www.permitgraph.org/p/201907196392) | Jul 19, 2019 | Completed: final sign-off Feb 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | removal of interior non-structural partitions, doors, finishes, hvac & electrical distribution @ ground floor tenant space. no exterior work. tenant space to remain unoccupied until future tenant imp… | $9,500 |
| [201906143426](https://www.permitgraph.org/p/201906143426) | Jun 14, 2019 | Completed: final sign-off Jul 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | suite 220: modifiy existing fire alarm system. add 2 ceiling speaker/strobes, add 2 ceiling strobes. ref ti #201903225982. | $13,196 |
| [M1091947](https://www.permitgraph.org/p/M1091947) | Jun 7, 2019 | Never finaled: issued Jun 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space |  |
| [201906042408](https://www.permitgraph.org/p/201906042408) | Jun 4, 2019 | Never finaled: issued Jun 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | per fred stumpp 2nd - 6th floors revised smoke control narrative and smoke control special inspection report to document the changes. ref pa 2017-1212-6276 and 2017-1212-6270 |  |
| [201905301962](https://www.permitgraph.org/p/201905301962) | May 30, 2019 | Completed: final sign-off Feb 2020 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | renovations of (e) at rincon ii courtyard restrooms. demo & construction of non structural partitions and doors. new: plm, light fix, accessories and toilet partitions to match current bld standards.… | $233,354 |
| [201905231481](https://www.permitgraph.org/p/201905231481) | May 23, 2019 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | 2nd flr, fire sprinkler: relocate 6, add 4, and delete 1 sprinkler on the 2nd fl, suite 220. ti #201903225982. | $3,500 |
| [M1062188](https://www.permitgraph.org/p/M1062188) | Apr 8, 2019 | Never finaled: issued Apr 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space w/mta |  |
| [201903225982](https://www.permitgraph.org/p/201903225982) | Mar 22, 2019 | Completed: final sign-off Oct 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | suite 220: t.i. expansion of conference room, office modification. maher n/a. | $75,000 |
| [201902263801](https://www.permitgraph.org/p/201902263801) | Feb 26, 2019 | Never finaled: issued Feb 2019, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 4th fl - ti add 4 duct detectors, add 4 multi-voltage relays. ref pa 2018-1113-5643 and 2018-1204-7435 | $12,230 |
| [201812117944](https://www.permitgraph.org/p/201812117944) | Dec 11, 2018 | Never finaled: issued Dec 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 4ht flr - fire sprinkler, relocate 29 upright and 10 pendent ref 201807164635 | $20,475 |
| [201812107848](https://www.permitgraph.org/p/201812107848) | Dec 10, 2018 | Never finaled: issued Dec 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | roo: replace the existing roof gate with a new gate at east tower of building. maher n/a. | $15,000 |
| [201812047435](https://www.permitgraph.org/p/201812047435) | Dec 4, 2018 | Completed: final sign-off Apr 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | re pa# 201807164635; fire alarm t.i. on 4th fl. add 11 ceiling speaker strobes (4th fl>) | $6,000 |
| [201811135643](https://www.permitgraph.org/p/201811135643) | Nov 13, 2018 | Completed: final sign-off Apr 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 4th floor: revision to permit # 2018-0716-4635. remove door in corridor. |  |
| [201810314670](https://www.permitgraph.org/p/201810314670) | Oct 31, 2018 | Never finaled: issued Nov 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd fl - fire only. permit for a-3 occupancy assembly. ref pa #201711093681. occupant load 91 and 94 |  |
| [201810314667](https://www.permitgraph.org/p/201810314667) | Oct 31, 2018 | Never finaled: issued Nov 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th fl - fire only. permit for a-2 assembly. ref pa #201711164136. barisita and deck occupant load 149 |  |
| [201810314668](https://www.permitgraph.org/p/201810314668) | Oct 31, 2018 | Never finaled: issued Nov 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th floor- fire only permit for a3 occupancy assembly. ref: 2017-1212-6270 ol concentrated 276. ol unconcentrated 14 lb. |  |
| [201810264226](https://www.permitgraph.org/p/201810264226) | Oct 26, 2018 | Completed: final sign-off Apr 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Famand Inc Dba Indoor Environmental Serv](https://www.permitgraph.org/contractor/famand-inc-dba-indoor-environmental-serv-646794) | install 1 new wshp with ductsox. retrofit existing wshp ductwork to serve back of building. maher na. new duct smoke detection for equipment shut down. fire alarm sep permit | $66,461 |
| [201810102747](https://www.permitgraph.org/p/201810102747) | Oct 10, 2018 | Never finaled: issued Oct 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5/f: approval of assembly use per sffd hq ref 201711164136 |  |
| [201810102748](https://www.permitgraph.org/p/201810102748) | Oct 10, 2018 | Never finaled: issued Oct 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6/f: approval of assembly use per sffd hq ref 201712126270 |  |
| [201810102745](https://www.permitgraph.org/p/201810102745) | Oct 10, 2018 | Never finaled: issued Oct 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2/f: approval of assembly use per sffd hq ref 201711164136 |  |
| [M971508](https://www.permitgraph.org/p/M971508) | Aug 28, 2018 | Never finaled: issued Aug 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space with mta |  |
| [201808167473](https://www.permitgraph.org/p/201808167473) | Aug 16, 2018 | Never finaled: issued Aug 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) | install electric wall mounted projecting double faced sign "soma eats" maher na | $10,000 |
| [201808036354](https://www.permitgraph.org/p/201808036354) | Aug 3, 2018 | Never finaled: issued Aug 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Certified Fire And Safety](https://www.permitgraph.org/contractor/certified-fire-and-safety-1015627) | suite b7: install ul300 ansul fire system to protect kitchenhood, cooking equipment and airmaid pollution control unit. ref app#201803234417. n/a for maher. | $6,000 |
| [201808036374](https://www.permitgraph.org/p/201808036374) | Aug 3, 2018 | Completed: final sign-off Oct 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | ti 201803234417 modify e fire alarm system add 1 booster panel, 16 ceiling speaker strobes, 1 wall speaker/strobe, 3 ceiling strobes, 1 synch module 5 control relays, 1 monitor module for ansul monit… | $16,415 |
| [201807255481](https://www.permitgraph.org/p/201807255481) | Jul 25, 2018 | Expired or cancelled: cancelled Aug 2023 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | fire only approval of assembly spaces. ti permits already approved but fire did not use assembly stamp. 201712126227, 201712126276, 201803163850, 201711164136, 201712126270, 201711214496. |  |
| [201807184826](https://www.permitgraph.org/p/201807184826) | Jul 18, 2018 | Never finaled: issued Jul 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Vkk Signmakers Inc.](https://www.permitgraph.org/contractor/vkk-signmakers-inc-737261) | design & manucture of evacuation maps for google permit areas floor 2, 3, 5, & 6. 17 total. | $5,000 |
| [M949687](https://www.permitgraph.org/p/M949687) | Jul 16, 2018 | Never finaled: issued Jul 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space w/mta |  |
| [201807164635](https://www.permitgraph.org/p/201807164635) | Jul 16, 2018 | Completed: final sign-off Apr 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | t.i on 3,500 sq ft, new wall power lighting and finishes | $175,000 |
| [201807124358](https://www.permitgraph.org/p/201807124358) | Jul 12, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | furnish & install 1 ansul r-102 fire suppression system, in the pollution control unit on the roof. ref pa 2018-0507-8370 interconnecting fire suppression operation with hood and duct system. fire al… | $9,000 |
| [201807033615](https://www.permitgraph.org/p/201807033615) | Jul 3, 2018 | Completed: final sign-off Apr 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | fire alrm scope of work is to modify the fire alarm field devices layout at proposed tenant improvement projects consist of the interior renovation at floors 2 thru 6 only for use by google. **maher… | $194,400 |
| [201806262936](https://www.permitgraph.org/p/201806262936) | Jun 26, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th fl revision to approved ti. relocate hand sink inpantry. clarify to utilize floor mop sink. update cove base finish in restroom. ref #201803163850. maher na |  |
| [201806182136](https://www.permitgraph.org/p/201806182136) | Jun 18, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | floors 2, 3, 5, 6 - revised smoke control matrix. ref #201801047815, #201711214496, #201712126270, #201711093681. maher na |  |
| [201806040888](https://www.permitgraph.org/p/201806040888) | Jun 4, 2018 | Completed: final sign-off Jun 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 23 pendents & 4 uprights for soma eats (ground floor). ref pa 2017-1024-2085 | $6,885 |
| [201805229780](https://www.permitgraph.org/p/201805229780) | May 22, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 6/f - add 25 , relocate 14, and plug 7 sprinklers in order to conform with the new ti maher na ref 201803163850 | $20,475 |
| [201805098602](https://www.permitgraph.org/p/201805098602) | May 9, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd flr - revision to deli stations. ref 201711093681 maher na |  |
| [M923987](https://www.permitgraph.org/p/M923987) | May 8, 2018 | Never finaled: issued May 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | street space w/mta |  |
| [201805078370](https://www.permitgraph.org/p/201805078370) | May 7, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | 2nd flr furnish and install 1 ansul pyrana system in the cafeteria | $8,000 |
| [201804277633](https://www.permitgraph.org/p/201804277633) | Apr 27, 2018 | Completed: final sign-off Mar 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite b7: revision to 201803234417 mechanical - includes hood supply air plenum maher n/a |  |
| [201804206908](https://www.permitgraph.org/p/201804206908) | Apr 20, 2018 | Never finaled: issued May 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) | install 1 illuyminated projecting electric double faced "parking" sign | $5,000 |
| [201804186673](https://www.permitgraph.org/p/201804186673) | Apr 18, 2018 | Never finaled: issued Apr 2018, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd flr - health department food service drawings assoicated with approved arch and mep. ref 201711093681 |  |
| [201803264622](https://www.permitgraph.org/p/201803264622) | Mar 26, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | f/s on 2nd-6th fl: 2/f: add 12, relocate 5, and plug 2 sprinklers. 3/f: add 3. 4/f: add 3. 5/f: add 3. 6/f: add 3 sprinklers in order to conform with the new wall/ceiling layout of the ti. ref #20171… | $14,500 |
| [201803264564](https://www.permitgraph.org/p/201803264564) | Mar 26, 2018 | Completed: final sign-off Jul 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 6/f: add 46, relocate 173, and plug 45 sprinklers in order to conform with new wall and ceiling layout of the ti. ref #201712126270. maher na | $50,370 |
| [201803234448](https://www.permitgraph.org/p/201803234448) | Mar 23, 2018 | Completed: final sign-off Jun 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2nd fl - relocate 1 sprinkler. 3rd fl - add 77, relocate 45, & plug 1 sprinkler. rleocate main piping on 3rd fl to conform to new walls and ceilings of tenant improvement.s ref #201711093681. maher na | $28,000 |
| [201803234417](https://www.permitgraph.org/p/201803234417) | Mar 23, 2018 | Completed: final sign-off Mar 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite b7: design of a new service/fast casual restaurant with new open food prep service area, coffee/wine bar, closed back of house prep area, full cook line storage, dining, new equipment. modify e… | $411,400 |
| [201803163850](https://www.permitgraph.org/p/201803163850) | Mar 16, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th flr - a-3 event space with associated pantry. new equipment on roof. maher na | $1,147,000 |
| [201803062975](https://www.permitgraph.org/p/201803062975) | Mar 6, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th flr - removal of office area maher na | $50,000 |
| [201803022673](https://www.permitgraph.org/p/201803022673) | Mar 2, 2018 | Completed: final sign-off Jun 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd floor: add one & relocate 2 sprinklers. 5th floor: add 104, relocate 178, plug 30, & change out 7 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711214… | $61,612 |
| [201803022695](https://www.permitgraph.org/p/201803022695) | Mar 2, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 4th floor: add 20, relocate 72, plug 21 sprinklers, and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#201711154071. n/a for maher | $19,412 |
| [201803022679](https://www.permitgraph.org/p/201803022679) | Mar 2, 2018 | Completed: final sign-off Jun 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd floor: add 106 & relocate 156 and plug 22 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711093681. n/a for maher. | $55,282 |
| [201803022680](https://www.permitgraph.org/p/201803022680) | Mar 2, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2nd floor: relocate 2 sprinklers. 5th floor: add 15, relocate 19, plug 1 sprinkler and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#… | $7,596 |
| [201803022678](https://www.permitgraph.org/p/201803022678) | Mar 2, 2018 | Completed: final sign-off Aug 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2nd floor: add 53, relocate 88 and plug 17 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201712126227. n/a for maher. | $29,751 |
| [201802201676](https://www.permitgraph.org/p/201802201676) | Feb 20, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd floor: revision to app201712126227 to adjust location of wall. n/a for maher |  |
| [201801047815](https://www.permitgraph.org/p/201801047815) | Jan 4, 2018 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd flr: mep to support approved arch. new lighting, controls, duct work & fsd. ref 201712126227 maher na | $850,000 |
| [201712126276](https://www.permitgraph.org/p/201712126276) | Dec 12, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd flr office ti with mep. new partitions, horizontal exit & finishes. | $4,500,000 |
| [201712126227](https://www.permitgraph.org/p/201712126227) | Dec 12, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd flr: office space including partition, event rooms & horizontal exit. maher n/a | $2,000,000 |
| [201712126270](https://www.permitgraph.org/p/201712126270) | Dec 12, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th flr office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9. | $5,000,000 |
| [201711214496](https://www.permitgraph.org/p/201711214496) | Nov 21, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher na | $6,000,000 |
| [201711204399](https://www.permitgraph.org/p/201711204399) | Nov 20, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a ** | $1,100,000 |
| [201711164136](https://www.permitgraph.org/p/201711164136) | Nov 16, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th floor: level 5: coffee barista, counter, general seating . level 2 catering pantry. mep included. n/a for maher. | $950,000 |
| [201711154071](https://www.permitgraph.org/p/201711154071) | Nov 15, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13 | $1,700,000 |
| [201711093681](https://www.permitgraph.org/p/201711093681) | Nov 9, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communicat… | $6,000,000 |
| [201710242085](https://www.permitgraph.org/p/201710242085) | Oct 24, 2017 | Completed: final sign-off Jan 2018 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | g/f- demolition of non structural partitions, ceiling, lighting, finishes and any associated mechanical, plumbing and electrical, new paint and concrete finishing. demo per ab-17, t.i. to follow. no… | $6,340 |
| [201710161317](https://www.permitgraph.org/p/201710161317) | Oct 16, 2017 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | g/f- demo pendent drops & bring back to shell coverage. n/a ordinance #155-13 | $6,340 |
| [201709299923](https://www.permitgraph.org/p/201709299923) | Sep 29, 2017 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | f/s: selective demo of pendent heads on fl 2,3,4,5,6. 1208 pendent removed and 1179 uprights installed, ref ti #201707242790. maher na | $121,943 |
| [201709289866](https://www.permitgraph.org/p/201709289866) | Sep 28, 2017 | Never finaled: issued Sep 2017, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | lobby: title 24: new wall sconces, ceiling and feature light fixtures. ref t.i. pa#201701260820. | $50,000 |
| [201708144772](https://www.permitgraph.org/p/201708144772) | Aug 14, 2017 | Completed: final sign-off Aug 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3/f- as built fire alarm for pa#201707273135. n/a ordinance #155-13 |  |
| [201707273135](https://www.permitgraph.org/p/201707273135) | Jul 27, 2017 | Completed: final sign-off Aug 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd fl: fire alarm ti: add (1) smoke detector in i.t. room, reuse all existing devices as shown. remove 2 smoke detectors from pre-action system. ref. pa #2017-0713-1785. maher na | $1,000 |
| [201707242790](https://www.permitgraph.org/p/201707242790) | Jul 24, 2017 | Completed: final sign-off Jun 2019 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | demolition of floors 2,3,4,5 & 6 interior only selective areas on each floor to be demolished. n/a maher | $100,000 |
| [201707131785](https://www.permitgraph.org/p/201707131785) | Jul 13, 2017 | Completed: final sign-off Jul 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd fl: remove existing pre-action valve and reconnect pipe to wet system. n/a maher | $3,000 |
| [201706300857](https://www.permitgraph.org/p/201706300857) | Jun 30, 2017 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maher | $50,000 |
| [201706058385](https://www.permitgraph.org/p/201706058385) | Jun 5, 2017 | Completed: final sign-off Sep 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | demo of toilet stall prtitions, plumbing fixtures and finiahes. construction of new partitoins, plumb fixtures, light fixtures, finishes for barrier removeal, mep/life safety, sprinkler system modfii… | $104,400 |
| [201705186985](https://www.permitgraph.org/p/201705186985) | May 18, 2017 | Completed: final sign-off Jul 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st floor lobby fire alarm t.i. - add 1 speaker strobe & 1 control relay for gas fireplace shutoff. ref pa #201701268020. n/a maher ordinance | $1,000 |
| [201705126452](https://www.permitgraph.org/p/201705126452) | May 12, 2017 | Completed: final sign-off Jun 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [J & C Safety 1st Fire Protection Inc](https://www.permitgraph.org/contractor/j-c-safety-1st-fire-protection-inc-964500) | fire sprinkler for new restaurant. add 5 automatic fire sprinkler. ref app#201611173012. n/a for maher | $1,300 |
| [201703282482](https://www.permitgraph.org/p/201703282482) | Mar 28, 2017 | Completed: final sign-off Apr 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st & 1st floor (2nd) floor - add & relocate fire sprinklers per tenant improvements. (1st floor - 2 add, mezz (2nd) floor 7 add, 8 relcoate). ref pa #201701268020. n/a maher ordinance | $8,840 |
| [201703161582](https://www.permitgraph.org/p/201703161582) | Mar 16, 2017 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher na | $100,000 |
| [201702088894](https://www.permitgraph.org/p/201702088894) | Feb 8, 2017 | Completed: final sign-off May 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 2 speaker/strobes, add 1 duct detector, add 3 control relays, add 1 pull station, add 1 smoke, add 1 monitor module, relocate 2 devices. ref pa 2016-1117-3012 | $10,000 |
| [201701268020](https://www.permitgraph.org/p/201701268020) | Jan 26, 2017 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanine | $200,000 |
| [201612144982](https://www.permitgraph.org/p/201612144982) | Dec 14, 2016 | Never finaled: issued Dec 2016, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 2nd flr: revision to 201606281050 to include occupancy approval for assembly permit at "lab" area |  |
| [201612024097](https://www.permitgraph.org/p/201612024097) | Dec 2, 2016 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maher | $90,000 |
| [201611173012](https://www.permitgraph.org/p/201611173012) | Nov 17, 2016 | Never finaled: issued Jan 2017, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Mani Builders](https://www.permitgraph.org/contractor/mani-builders-485316) | b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen eq… | $100,000 |
| [201611173026](https://www.permitgraph.org/p/201611173026) | Nov 17, 2016 | Never finaled: issued Jan 2017, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Mani Builders](https://www.permitgraph.org/contractor/mani-builders-485316) | install an electric double face projecting sign inside the courtyard. n/a maher ordinance | $1,700 |
| [201611173023](https://www.permitgraph.org/p/201611173023) | Nov 17, 2016 | Never finaled: issued Jan 2017, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Dorin Buzatu Construction](https://www.permitgraph.org/contractor/dorin-buzatu-construction-853216) | b-9. install an electric single face (letter) wall sign inside the courtyard. n/a maher ordinance | $2,800 |
| [201609228589](https://www.permitgraph.org/p/201609228589) | Sep 22, 2016 | Never finaled: issued Sep 2016, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2nd flr, suite 201: fire alarm; add 10 speaker/strobes, 1 strobe, 1 speaker 6 duct detectors with relays and monitoring modules for heat pump and 1 relay for music shutdown ref 2016-0628-1050 | $9,000 |
| [201608235785](https://www.permitgraph.org/p/201608235785) | Aug 23, 2016 | Completed: final sign-off Oct 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) |  | fire sprinkler install 14 new pendents, 51 new uprights, delete 48 pendents on 2nd fl t.i. 201606281050; maher n/a | $34,000 |
| [201607142330](https://www.permitgraph.org/p/201607142330) | Jul 14, 2016 | Completed: final sign-off Sep 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 electrical for work done under pa 2016-0513-7352 | $10,000 |
| [201606281050](https://www.permitgraph.org/p/201606281050) | Jun 28, 2016 | Completed: final sign-off Nov 2017 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | tenant improvement to include new partitions with glazing configuration, ceiling and power data work and finishes. minimal structural work for new moveable partition and guardrail at e balcony. suite… | $650,000 |
| [201606160159](https://www.permitgraph.org/p/201606160159) | Jun 16, 2016 | Completed: final sign-off Jul 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st floor: fire alarm t.i. : peet's coffee. add 4 ceilling speaker strobes, 2 new duct detectors with relays for heat pump. relocate 1 pull and 1 heat detector. ref app#2016-0225-0558 | $5,000 |
| [201606109704](https://www.permitgraph.org/p/201606109704) | Jun 10, 2016 | Completed: final sign-off Jul 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | ground floor fire sprinkelr t.i. under pa #201602250558 - relocate 13 & add 8, total 21. n/a maher ordinance | $10,807 |
| [201605187707](https://www.permitgraph.org/p/201605187707) | May 18, 2016 | Never finaled: issued Jun 2016, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sign Of Light](https://www.permitgraph.org/contractor/sign-of-light-906191) | peets coffee: erect double faced projecting illum sign maher na | $2,500 |
| [201605187708](https://www.permitgraph.org/p/201605187708) | May 18, 2016 | Never finaled: issued Jun 2016, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Sign Of Light](https://www.permitgraph.org/contractor/sign-of-light-906191) | peets coffee: erect single faced wall illum sign maher na | $4,000 |
| [201605137352](https://www.permitgraph.org/p/201605137352) | May 13, 2016 | Completed: final sign-off Sep 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submi… | $55,000 |
| [201602250558](https://www.permitgraph.org/p/201602250558) | Feb 25, 2016 | Completed: final sign-off Aug 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [C B 2 Builders Incorporated](https://www.permitgraph.org/contractor/c-b-2-builders-incorporated-873875) | interior tenant improvement only. new restrooms, floor, wall, ceiling finishes to meet peets coffee branding | $185,000 |
| [201601298300](https://www.permitgraph.org/p/201601298300) | Jan 29, 2016 | Completed: final sign-off May 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | replace 1 set of (e) exterior doors & install 1 set of (n) exterior doors. all to match existing. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. maher na.… | $5,316 |
| [201601298302](https://www.permitgraph.org/p/201601298302) | Jan 29, 2016 | Completed: final sign-off Jun 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | (n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher na | $23,989 |
| [201512034070](https://www.permitgraph.org/p/201512034070) | Dec 3, 2015 | Completed: final sign-off Dec 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 3 sprinkler pendents for bentham imf on the 4th floor. pa 2015-1027-0943 | $1,500 |
| [201512013833](https://www.permitgraph.org/p/201512013833) | Dec 1, 2015 | Completed: final sign-off Dec 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor: revision to app#201509308432 to add a sump pump and hvac revisions | $7,500 |
| [201511203172](https://www.permitgraph.org/p/201511203172) | Nov 20, 2015 | Completed: final sign-off Feb 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd fl: add 7 speaker/strobes, 2 speakers. ref ti 2015-0930-8432 | $7,000 |
| [201511193091](https://www.permitgraph.org/p/201511193091) | Nov 19, 2015 | Completed: final sign-off Apr 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Ron Thorn Construction Inc](https://www.permitgraph.org/contractor/ron-thorn-construction-inc-942822) | add 2, 2.5 antenns, add 2 , 2.5 rrh , new coax jumper lines from rrhs to new antennas, install new hydbrid lines to new sector locations, add n 2.5 equipment inside e mmbs cabinet, new 2.5 batteries… | $20,000 |
| [201511041672](https://www.permitgraph.org/p/201511041672) | Nov 4, 2015 | Completed: final sign-off Dec 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | install 10 new pendent sprinklers in area of work for t.i. pa# 201509308432. n/a ordinance #155-13 | $4,500 |
| [201510270943](https://www.permitgraph.org/p/201510270943) | Oct 27, 2015 | Completed: final sign-off Feb 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 4th floor t.i.: new interior non-structural partitions, fineshes, mill work, ceiling repair, lighting replacement, electrical, minor mechanical. electrical mechanical, sprinkler, life safety under se… | $72,000 |
| [201510260777](https://www.permitgraph.org/p/201510260777) | Oct 26, 2015 | Completed: final sign-off Dec 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | structural work associated with approved permit 201509308432 for demountable wall system. n/a for maher. | $48,000 |
| [201510210338](https://www.permitgraph.org/p/201510210338) | Oct 21, 2015 | Completed: final sign-off Oct 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocate 2 pendent sprinklers on the 6th floor ti 2015-0515-6419 | $1,030 |
| [201510099318](https://www.permitgraph.org/p/201510099318) | Oct 9, 2015 | Completed: final sign-off Oct 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 2nd flr: added one pendant | $4,238 |
| [201509308432](https://www.permitgraph.org/p/201509308432) | Sep 30, 2015 | Completed: final sign-off Dec 2016 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/a | $511,560 |
| [201509106570](https://www.permitgraph.org/p/201509106570) | Sep 10, 2015 | Completed: final sign-off Dec 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | partial ti on the 6th floor including selective demo, new partition, ceiling, finishes & associated mechanical. fire life safety under separate permit | $68,000 |
| [201508255281](https://www.permitgraph.org/p/201508255281) | Aug 25, 2015 | Completed: final sign-off Oct 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) | remove non-structural partitions. removal of interior glass and full height. installation of new interior glass and full height non-rated partitions. compliance with maher ordinance no 155-13. | $35,959 |
| [201507222095](https://www.permitgraph.org/p/201507222095) | Jul 22, 2015 | Never finaled: issued Jul 2015, no final | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Certified Fire & Safety Co](https://www.permitgraph.org/contractor/certified-fire-safety-co-905771) | install ul 300 core fire system to protect pollution control unit in kitchen duct exhaust. n/a for maher. | $5,000 |
| [201507101216](https://www.permitgraph.org/p/201507101216) | Jul 10, 2015 | Completed: final sign-off Jul 2015 | [121 Spear St](https://www.permitgraph.org/a/3716/021) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | build out of existing ti space to include 5 notification appliances, 1 power suply, 4 monitor points. | $8,500 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (46), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (16), [Marchetti Group](https://www.permitgraph.org/contractor/marchetti-group-992330) (15), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (15), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (12), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (9), [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) (7), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (6), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (5), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (5), [Ad Image Advertising](https://www.permitgraph.org/contractor/ad-image-advertising-1039860) (4), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (3), [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) (3), [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) (2), [Durkin Signs & Graphics Inc](https://www.permitgraph.org/contractor/durkin-signs-graphics-inc-904644) (2), [Mani Builders](https://www.permitgraph.org/contractor/mani-builders-485316) (2), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (2), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (2), [Sign Of Light](https://www.permitgraph.org/contractor/sign-of-light-906191) (2), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (2), [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) (2), [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067), [C B 2 Builders Incorporated](https://www.permitgraph.org/contractor/c-b-2-builders-incorporated-873875), [Certified Fire & Safety Co](https://www.permitgraph.org/contractor/certified-fire-safety-co-905771), [Certified Fire And Safety](https://www.permitgraph.org/contractor/certified-fire-and-safety-1015627), [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065), [Cobe Construction Inc](https://www.permitgraph.org/contractor/cobe-construction-inc-835122), [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380), [Dorin Buzatu Construction](https://www.permitgraph.org/contractor/dorin-buzatu-construction-853216), [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513), [Famand Inc Dba Indoor Environmental Serv](https://www.permitgraph.org/contractor/famand-inc-dba-indoor-environmental-serv-646794), [J & C Safety 1st Fire Protection Inc](https://www.permitgraph.org/contractor/j-c-safety-1st-fire-protection-inc-964500), [J & N Quality Enterprises](https://www.permitgraph.org/contractor/j-n-quality-enterprises-927350), [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138), [O C Mc Donald Co Inc](https://www.permitgraph.org/contractor/o-c-mc-donald-co-inc-177271), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241), [Ron Thorn Construction Inc](https://www.permitgraph.org/contractor/ron-thorn-construction-inc-942822), [Sotello Graphic Associates](https://www.permitgraph.org/contractor/sotello-graphic-associates-767483), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92), [Vkk Signmakers Inc.](https://www.permitgraph.org/contractor/vkk-signmakers-inc-737261)
- Architects: [Marc Penninger](https://www.permitgraph.org/professional/marc-penninger-C27880) (12), [Brian Milford](https://www.permitgraph.org/professional/brian-milford-C33430) (6), [Lisa Bieringer](https://www.permitgraph.org/professional/lisa-bieringer-C34984) (6), [Greg A. Sheppard](https://www.permitgraph.org/professional/greg-a-sheppard-C26557) (4), [Brian Arthur Noteware](https://www.permitgraph.org/professional/brian-arthur-noteware-C21514) (3), [Pamela Robinson](https://www.permitgraph.org/professional/pamela-robinson-C25429) (3), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087) (3), [Nelson Algaze](https://www.permitgraph.org/professional/nelson-algaze-C21090) (2), [Ahmad Mohazab](https://www.permitgraph.org/professional/ahmad-mohazab-C17636), [Alan Johansen](https://www.permitgraph.org/professional/alan-johansen-C9672), [Brett Mccune](https://www.permitgraph.org/professional/brett-mccune-C23150), [Byron Kwong](https://www.permitgraph.org/professional/byron-kwong-C33768), [Claudette Bleijenberg](https://www.permitgraph.org/professional/claudette-bleijenberg-C31720), [Clement Soga](https://www.permitgraph.org/professional/clement-soga-C17024), [Eric Ibsen](https://www.permitgraph.org/professional/eric-ibsen-C25185), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9255), [Jason Mccarthy](https://www.permitgraph.org/professional/jason-mccarthy-C27514), [Julia Seen](https://www.permitgraph.org/professional/julia-seen-C29927), [Keith Morris](https://www.permitgraph.org/professional/keith-morris-C26028), [Kimberly O'dowd](https://www.permitgraph.org/professional/kimberly-o-dowd-C33983), [Naveen Mathur](https://www.permitgraph.org/professional/naveen-mathur-C30108), [Rene Calara](https://www.permitgraph.org/professional/rene-calara-C30788), [Richard Sambucetti](https://www.permitgraph.org/professional/richard-sambucetti-C11535), [Scott E Clement](https://www.permitgraph.org/professional/scott-e-clement-C36455), [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609)
- Engineers: [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (5), [Erica Hayes](https://www.permitgraph.org/professional/erica-hayes-S6428) (3), [Carlo Biscocho](https://www.permitgraph.org/professional/carlo-biscocho-M39690) (2), [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582) (2), [Stephen Shaffer](https://www.permitgraph.org/professional/stephen-shaffer-E21097) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Brian Featherston](https://www.permitgraph.org/professional/brian-featherston-M32323), [Carl Milsum](https://www.permitgraph.org/professional/carl-milsum-S6190), [Cbf, Inc](https://www.permitgraph.org/professional/cbf-inc-335878), [Christopher Lloyd](https://www.permitgraph.org/professional/christopher-lloyd-C11748), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-2835), [Elisabeth M Allen](https://www.permitgraph.org/professional/elisabeth-m-allen-E17659), [Habtom Nugusse Tewelde](https://www.permitgraph.org/professional/habtom-nugusse-tewelde-M39065), [Manouchehr Hakhamaneshi](https://www.permitgraph.org/professional/manouchehr-hakhamaneshi-C88083), [Mozart Faizi](https://www.permitgraph.org/professional/mozart-faizi-E15962), [Nicki Sparks](https://www.permitgraph.org/professional/nicki-sparks-E19491), [Pablo Orozco](https://www.permitgraph.org/professional/pablo-orozco-M27485), [Raymond Meng Zhong](https://www.permitgraph.org/professional/raymond-meng-zhong-M27635), [Sabah Intl.](https://www.permitgraph.org/professional/sabah-intl-381218), [Sebastian Asvaraksh](https://www.permitgraph.org/professional/sebastian-asvaraksh-M36623), [Shun-Lunne Lin](https://www.permitgraph.org/professional/shun-lunne-lin-E11366), [William Hadinger](https://www.permitgraph.org/professional/william-hadinger-M29805)
- Authorized agents: [Thomas Brady](https://www.permitgraph.org/professional/thomas-brady-381218)
- Designers: [Terrence Olson](https://www.permitgraph.org/professional/terrence-olson-777717) (2), [Andrew Erickson](https://www.permitgraph.org/professional/andrew-erickson-927862), [Legacy Mechanical](https://www.permitgraph.org/professional/legacy-mechanical-808022)
- Pmt consultant/expediters: [Russell L. Will Jr.](https://www.permitgraph.org/professional/russell-l-will-jr-622065)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.