# 350 Mission St

Block 3710, lot 017. Page: https://www.permitgraph.org/a/3710/017

- City's use: Commercial Office
- Built: 2015
- Stories: 30
- Building: 492,980 sq ft
- Lot: 18,905 sq ft
- Zoning: C3O
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609168177](https://www.permitgraph.org/p/202609168177) | Oct 19, 2026 | In progress: issued Oct 2026 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215) | project consist of adding a plate and frame heat exchanger to the building chilled water system provide free - cooling during winter months. heat exchanger is located in the penthouse area of the bui… | $216,837 |
| [202512020736](https://www.permitgraph.org/p/202512020736) | Dec 2, 2025 | Completed: final sign-off Dec 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to bpa: 202506309783 - scope includes partial removal of approved light fixtures that will impact electrical and energy sheets. |  |
| [202511210165](https://www.permitgraph.org/p/202511210165) | Nov 21, 2025 | In progress: issued Nov 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 2nd floor: fire alarm modification- ti on 2nd floor. add(3) new speaker strobes. add (1) new smoke detectors. ref. bpa#202506309783 | $10,000 |
| [202511129337](https://www.permitgraph.org/p/202511129337) | Nov 12, 2025 | In progress: issued Nov 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | as-built for pa#202510217823. revised routing from main riser. | $6,600 |
| [202511048824](https://www.permitgraph.org/p/202511048824) | Nov 4, 2025 | Completed: final sign-off Jan 2026 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | 11th fl: interior sign permit "nnasdaq" | $10,000 |
| [202510217823](https://www.permitgraph.org/p/202510217823) | Oct 21, 2025 | In progress: issued Nov 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | modification to existing fire sprinklers system to add (12)heads for golf simulators. ref pa # 2025-0630-9783. | $6,000 |
| [202510036650](https://www.permitgraph.org/p/202510036650) | Oct 3, 2025 | In progress: issued Oct 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064) | two blade signs same size. non-electric. double faced. projecting sign (20 1/4 inches). "studio golf bar and grill" | $12,000 |
| [202509175452](https://www.permitgraph.org/p/202509175452) | Sep 17, 2025 | Expired or cancelled: withdrawn Nov 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | modification to existing fire sprinklers system to add heads to proposed golf simulators. ref pa # 2025-0630-9783 | $40,000 |
| [202506309783](https://www.permitgraph.org/p/202506309783) | Jun 30, 2025 | Completed: final sign-off Dec 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 2/f - ti (e)restaurant & bar located. add accessory use for 2(n) golf simulators with metal trellis; modification & removal of (e) wood trellis; existing building is fully sprinkler. fire sprinklers… | $297,800 |
| [202501218677](https://www.permitgraph.org/p/202501218677) | Jan 21, 2025 | In progress: issued Jan 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | 10 and 12/fl-ref 202409231365-install relocated security system head end control panels on floors 10 and 12 (1 each). install fire alarm relays at control panel. metro job #242168 | $21,000 |
| [202409231365](https://www.permitgraph.org/p/202409231365) | Sep 23, 2024 | In progress: issued Aug 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 9th and 12th floor. fire alarm ti. add (2) control relays for door holder release into the existing system. | $5,000 |
| [202409060278](https://www.permitgraph.org/p/202409060278) | Sep 6, 2024 | Completed: final sign-off Oct 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | remove (e) glass and replace with new (22) windows. random/specified locations at each elevation. to comply with nov 202305480. new glass to match (e) size, treatment and color. | $50,000 |
| [202402216310](https://www.permitgraph.org/p/202402216310) | Feb 21, 2024 | In progress: issued Oct 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 25th fl ti. enlargement of existing flex office room to provide a conference room. construction of a reception desk. conversion of an existing storage room into a meeting room. convert existing locke… | $335,000 |
| [202311281510](https://www.permitgraph.org/p/202311281510) | Nov 28, 2023 | Completed: final sign-off Dec 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | as built fa permit drawing 202308073838. relocate 1 new speaker strobe on 23rd fl per arch changes. |  |
| [202310199017](https://www.permitgraph.org/p/202310199017) | Oct 19, 2023 | Never finaled: issued Oct 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | add 2 pendent sprinklers on the 5/f for phone booths. add 1 pendent sprinkler on the 9/f for phone booths. add 3 pendent sprinkler on the 14/f for phone booth. add 2 pendent sprinkler on the 18/f for… | $9,100 |
| [202310188878](https://www.permitgraph.org/p/202310188878) | Oct 18, 2023 | Never finaled: issued Oct 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm modifications for tenant improvement on floors 5, 9, 14, 18,20 and 21 to add visual notification inside phone booths as follows: add 2 strobes on level 5, add 1 strobe on level 9, add 3 st… | $15,000 |
| [202310128514](https://www.permitgraph.org/p/202310128514) | Oct 12, 2023 | Never finaled: issued Nov 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 7th flr. documenting occupancy load for place of assembly permit. refer to prmit #2023-0515-7788. |  |
| [202309227190](https://www.permitgraph.org/p/202309227190) | Sep 22, 2023 | Completed: final sign-off Oct 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 6/f: fire alarm modifications for ti on 6th flr includes: remove 3 notification devices, add 3 new smoke detectos, relocated 3 notification devices add 2 new speaker/strobes, add 3 new strobes. ref p… | $3,000 |
| [202309227164](https://www.permitgraph.org/p/202309227164) | Sep 22, 2023 | Never finaled: issued Sep 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 7/f: fire alarm modifications for ti on 7th flr includes: add 6 new duct smoke detectors, add 9 new control relays, add 4 new smoke detectors, add 20new ceiling speaker/strobes, add 3 new speakers, a… | $6,000 |
| [202309227165](https://www.permitgraph.org/p/202309227165) | Sep 22, 2023 | Completed: final sign-off Oct 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 5/f: fire alarm modifications for ti on 5th flr includes: remove 2 notification devices, ref pa# 202306140052. | $1,000 |
| [202309076097](https://www.permitgraph.org/p/202309076097) | Sep 7, 2023 | Completed: final sign-off Sep 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm modifications for tenant improvment on flr 15, 16, 17 to include: remove 4 notification applicances, add 1 notification appliance, add 1 smoke detector, add 1 control decay | $3,000 |
| [202309055880](https://www.permitgraph.org/p/202309055880) | Sep 5, 2023 | Completed: final sign-off Sep 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 15 pendent sprinker and 20 upright on the 5/f. relocate 6 pendent sprinkler and 2 upright on the 6/f. relocate 5 pendent sprinkler and relocate 2 upright on the 9/f. relocate 5 pendent sprin… | $39,200 |
| [202308114238](https://www.permitgraph.org/p/202308114238) | Aug 11, 2023 | Never finaled: issued Aug 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 2 pendent sprinkers and add 3 pendents in phone booths on the 14/f. relocate 3 uprights sprinklers on the 15/f. relocate 3 pendent sprinklers and relcate 3 uprights on the 16/f. relocate 3 p… | $16,900 |
| [202308073838](https://www.permitgraph.org/p/202308073838) | Aug 7, 2023 | Never finaled: issued Aug 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | f/21,22,23: f/a modification t.i., remove (7) notification appliances, add (2) new smoke detectors, add (6) new modification appliances | $6,000 |
| [202308023538](https://www.permitgraph.org/p/202308023538) | Aug 2, 2023 | Completed: final sign-off Sep 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm modification for tenant improvement on floors 8,9, 14 to include remove 2 notification appliances, add 1 notification appliance, 1 smoke detector | $6,000 |
| [202308023525](https://www.permitgraph.org/p/202308023525) | Aug 2, 2023 | Never finaled: issued Aug 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm modification remove 3 notification devices, add 2 notification devices, add 1 smoke detector | $6,000 |
| [202307313352](https://www.permitgraph.org/p/202307313352) | Jul 31, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | fl 5, 9, 14, 18, 20 & 21. work shall consist of the installation of (13) phone booths total. accessibility is provided with phone rooms which are directly adjacent to the phone booths and meet all ac… | $40,000 |
| [202307192447](https://www.permitgraph.org/p/202307192447) | Jul 19, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 24th fl: electrical work includes new power and signal devices and title 24 compliant lighting and controls. see 202212027580 | $25,000 |
| [202307132089](https://www.permitgraph.org/p/202307132089) | Jul 13, 2023 | Completed: final sign-off Sep 2023 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 25 pendent sprinklerss and 31 upgrights on the 7th fl relocate 3 pendent sprinklers 2 uprights on 8th fl. relocate 3 pendent sprinklers and 2 uprights 18th fl. relocate 3 pendent sprinklers… | $48,750 |
| [202307101779](https://www.permitgraph.org/p/202307101779) | Jul 10, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | fl 6 mechnical and electrical work ref to t.i. 202306140055: installation of ducts and equipment. insulation ddc controls and air balancing | $40,000 |
| [202307101777](https://www.permitgraph.org/p/202307101777) | Jul 10, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | fl 21,22,23 mechnical and electrical work ref to t.i. 202212077850 & 202306281052: installation of ducts and equipment. insulation ddc controls and air balancing | $125,000 |
| [202307061542](https://www.permitgraph.org/p/202307061542) | Jul 6, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | floor 5: deferred mechanical & electrical work including installation of ducts and equipment, insulation, ddc controls and air balance. ref bpa#202306140052 | $125,000 |
| [202307061541](https://www.permitgraph.org/p/202307061541) | Jul 6, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | floors 15,16,17: mechanical & electrical work including installation of ducts and equipment, insulation, ddc controls and air balance. ref bpa#202212098038 | $125,000 |
| [202306301337](https://www.permitgraph.org/p/202306301337) | Jun 30, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 18th, 19th, 20th mechanical and electrical work. work includes installation of ducts and equipment, insulation, ddc controls and air balance. ref pa 2022-1208-7958 | $125,000 |
| [202306301333](https://www.permitgraph.org/p/202306301333) | Jun 30, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 8th, 9th and 14th fl - mechanical and electrical work. work includes installation of ducts and equpment insulation, ddc controls and air balance. see pa 2022-1212-8104 for approved architectural | $125,000 |
| [202306281052](https://www.permitgraph.org/p/202306281052) | Jun 28, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | floors 21,22,23 revision to 202212077850. revised egress plans and calculations that do not impact existing exiting from the space |  |
| [202306281051](https://www.permitgraph.org/p/202306281051) | Jun 28, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | floors 18,19,20 revision to 202212087958. revised egress plans and calvulations that do not impact existing exiting from the space |  |
| [202306281050](https://www.permitgraph.org/p/202306281050) | Jun 28, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | floor 24th revision to 202212027580 revised egress plans and calculations that do not impact existing exiting from the space |  |
| [202306281047](https://www.permitgraph.org/p/202306281047) | Jun 28, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | floors 8,9,14 revision to 202212128104. revised egress plans and calvulations that do not impact existing exiting from the space |  |
| [202306140055](https://www.permitgraph.org/p/202306140055) | Jun 14, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 6th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permit. | $600,000 |
| [202306140052](https://www.permitgraph.org/p/202306140052) | Jun 14, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 5th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permit | $600,000 |
| [202305157788](https://www.permitgraph.org/p/202305157788) | May 15, 2023 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 7/f: revision to permit 202212148266. revisions include changes to room layouts, fixtures, restrooms, finishes, and millwork. mep included. |  |
| [202303244366](https://www.permitgraph.org/p/202303244366) | Mar 24, 2023 | Never finaled: issued Mar 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) | erect non electric sign "salesforce east" | $12,000 |
| [202212148266](https://www.permitgraph.org/p/202212148266) | Dec 14, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 7th floor interior demo non structural partitions, doors, finishes, mep defered. | $250,000 |
| [202212128104](https://www.permitgraph.org/p/202212128104) | Dec 12, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ti: fl 8,9,14: int demo of non-structural elements. work included new partitions, finishes, door, and hardware. mep under separate permit. | $250,000 |
| [202212098038](https://www.permitgraph.org/p/202212098038) | Dec 9, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 15-17/flrs: interior ti- demolition of non-structural elements work includes new partitions, finishes, doors and hardware. | $250,000 |
| [202212087958](https://www.permitgraph.org/p/202212087958) | Dec 8, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | fl 18th, 19th, 20th: interior demolition of non structural elements. work includes new partitions, finishes, doors and hardware. | $250,000 |
| [202212077850](https://www.permitgraph.org/p/202212077850) | Dec 7, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | fl 21, 22 & 23 - interior demo of non-structural elements. work includes new partitions, finishes, doors and hardware. mep under separate permit | $250,000 |
| [202212027580](https://www.permitgraph.org/p/202212027580) | Dec 2, 2022 | Completed: final sign-off Mar 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | t.i. for 24,25,26 fls. intererior demo of non structural elements, new partitions, finishes, doors, and hardware. mep under serapate permit | $250,000 |
| [202210144410](https://www.permitgraph.org/p/202210144410) | Oct 14, 2022 | Completed: final sign-off Oct 2022 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) | fire only: errc corrections after sf upgrade to new frequencies. red cloud to install additional antenna and leaks coax in elec room shaft. |  |
| [202205093763](https://www.permitgraph.org/p/202205093763) | May 9, 2022 | Never finaled: issued Mar 2023, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | disabled access compliance documentation per ab-056 for basement 4,3&1, floors 1,2,5-30 to include parking, building entrances, elevators, restrooms, drinking fountains, & signage. replace double doo… |  |
| [202204262997](https://www.permitgraph.org/p/202204262997) | Apr 26, 2022 | Never finaled: issued Apr 2022, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 10th fl: fire alarm t.i. modification. 1 new speaker strobe on (e) nac + speaker circuit. relocate 1 (e) strobe only in new bathroom. all other work to remain. ref pa# 202201055413. | $5,000 |
| [202204222761](https://www.permitgraph.org/p/202204222761) | Apr 22, 2022 | Never finaled: issued Apr 2022, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10/f: revision to pa#202201055413. pg a0.02 & a1-10. plus update "open work" room 10-s08 to assembly for occasional all hands meetings s08-1. add panic hardware, s08.2. new doors for 2nd means of egr… |  |
| [202204132122](https://www.permitgraph.org/p/202204132122) | Apr 13, 2022 | Never finaled: issued Apr 2022, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10/f: mep deferred submitted to support approved arch drawings new bathroom exhaust fan, relocate swirl diffusers and transfer grilles for chemistry wall. ref 202201055413 | $55,000 |
| [202203311276](https://www.permitgraph.org/p/202203311276) | Mar 31, 2022 | Completed: final sign-off Jun 2022 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 10/f: relocate 1 pendent fire sprinkler and 4 uprights. add 5 uprights on the 10th floor. | $5,000 |
| [202201055413](https://www.permitgraph.org/p/202201055413) | Jan 5, 2022 | Never finaled: issued Jan 2022, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10th floor: demo and build back of non structural partitions, ceilings and millwork. mep deferred. | $600,000 |
| [202104289503](https://www.permitgraph.org/p/202104289503) | Apr 28, 2021 | Completed: final sign-off Mar 2022 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) | red cloud to replace bda head end unit to new comba sf compliant bda and replace donor "roof" antenna with gamma nu. all other components remain unchanged. | $25,000 |
| [202102094323](https://www.permitgraph.org/p/202102094323) | Feb 9, 2021 | Completed: final sign-off Oct 2021 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti -voluntary improvement of adding an additional 2-way communications remote master station at the security desk. | $7,500 |
| [202101213073](https://www.permitgraph.org/p/202101213073) | Jan 21, 2021 | Completed: final sign-off Apr 2021 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti: 1st floor notification modification. add (1) new speaker-strobe to an existing circuits. | $7,500 |
| [202012090621](https://www.permitgraph.org/p/202012090621) | Dec 9, 2020 | Never finaled: issued Jan 2021, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hp Build](https://www.permitgraph.org/contractor/hp-build-1048290) | partial removal and replacement of millwork in the dining room of (e) restaurant. project does not propose a change in use or occupancy. projects does not incl changes to mech or plumb. no changes to… | $113,949 |
| [202012030208](https://www.permitgraph.org/p/202012030208) | Dec 3, 2020 | Completed: final sign-off Apr 2021 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate (4) and add (1) fire sprinklers. ref. permit # 2020-0213-4373 | $2,200 |
| [202011068415](https://www.permitgraph.org/p/202011068415) | Nov 6, 2020 | Never finaled: issued Dec 2020, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti: add (1) new speaker/strobe and relocate (2) existing devices on level 6 area of work. all existing operations unaffected. | $7,500 |
| [202009164322](https://www.permitgraph.org/p/202009164322) | Sep 16, 2020 | Completed: final sign-off Oct 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 3 pendents on the 6th floor for design studio. ref pa# 202007069583 | $1,500 |
| [202007069583](https://www.permitgraph.org/p/202007069583) | Jul 6, 2020 | Completed: final sign-off Dec 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6th fl: minor interior construction in single floor tenant, splitting (e) mailroom into mailroom and design studio. scope of work includes selective demo, new partitions, millwork, overhead ceiling,… | $350,000 |
| [202002134373](https://www.permitgraph.org/p/202002134373) | Feb 13, 2020 | Completed: final sign-off Jun 2021 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | lobby - new retail pop-up eatery interior build-out in (e) lobby. new kitchen equipment, service counters & finishes. mech, elec, plulmbing & life safety as design build under separate permit | $150,000 |
| [202001232586](https://www.permitgraph.org/p/202001232586) | Jan 23, 2020 | Completed: final sign-off Feb 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | ref pa# 201911066581; fire sprinklers: relocate 1 upright and add 1 upright on the 22nd fl. | $1,000 |
| [202001131711](https://www.permitgraph.org/p/202001131711) | Jan 13, 2020 | Completed: final sign-off Dec 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 15th fl: minor interior construction to convert team/conference room into shared office | $120,000 |
| [201911066581](https://www.permitgraph.org/p/201911066581) | Nov 6, 2019 | Completed: final sign-off Feb 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 22nd floor: minor interior construction on a single tenant floor work to include new partition door system and finishes. | $44,000 |
| [201903155296](https://www.permitgraph.org/p/201903155296) | Mar 15, 2019 | Completed: final sign-off Jan 2021 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | voluntary barrier removal: install poewr activated dooropeners & associated push plates in elevator lobbies, gender neutral men's & women's restroom in a single tenant floor. no change to existing ex… | $1,500,000 |
| [201811075214](https://www.permitgraph.org/p/201811075214) | Nov 7, 2018 | Completed: final sign-off Jun 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | furnish and install 1 ansul fire system in the main kitchen area on gr fl furnsh and install 1 ansul fire system in pcu in the mezzanine- mechanicaa plans 201810163301, 201809130083- smoke controll r… | $10,000 |
| [201811014736](https://www.permitgraph.org/p/201811014736) | Nov 1, 2018 | Never finaled: issued Nov 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 2nd fl restaurant mina group. add 8 control relays for fan control, 5 duct detectors, 9 moniter modules for fan status and supervision, 8 1/0 modules for fan/damper c0ntrol 1 moniter mo… | $34,000 |
| [201810314592](https://www.permitgraph.org/p/201810314592) | Oct 31, 2018 | Never finaled: issued Oct 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Pvl Signs & Graphics Inc](https://www.permitgraph.org/contractor/pvl-signs-graphics-inc-907484) | installing illuminated channel letters. | $3,500 |
| [201810314591](https://www.permitgraph.org/p/201810314591) | Oct 31, 2018 | Never finaled: issued Oct 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Pvl Signs & Graphics Inc](https://www.permitgraph.org/contractor/pvl-signs-graphics-inc-907484) | installing illuminated channel letter wall signs. | $3,000 |
| [201810314593](https://www.permitgraph.org/p/201810314593) | Oct 31, 2018 | Never finaled: issued Oct 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Pvl Signs & Graphics Inc](https://www.permitgraph.org/contractor/pvl-signs-graphics-inc-907484) | rrefacing 2 existing illuminated blade signs. | $2,000 |
| [201810193645](https://www.permitgraph.org/p/201810193645) | Oct 19, 2018 | Completed: final sign-off Oct 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 12th floor: fire sprinkler only - relocate (3) pendents, (2) uprights for salesforce i.t. lab | $2,750 |
| [201810163301](https://www.permitgraph.org/p/201810163301) | Oct 16, 2018 | Completed: final sign-off Jun 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2/f: smoke control system modificaiton. maher n/a |  |
| [201810092684](https://www.permitgraph.org/p/201810092684) | Oct 9, 2018 | Completed: final sign-off Nov 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 2nd flr restaurant & equip platform: add 33 relocate 20 and plug 1 sprinkler heads to conform with new wall/ceiling layout of ti ref 201706230265 job 18-677 | $21,600 |
| [201809130083](https://www.permitgraph.org/p/201809130083) | Sep 13, 2018 | Completed: final sign-off Jun 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to app201706230265 includes changes to mep, structural and architectural design. | $10,000 |
| [201809139946](https://www.permitgraph.org/p/201809139946) | Sep 13, 2018 | Completed: final sign-off Jan 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 12/f: f/a t.i. add 2 smoke detectors, 2 control relays. ref t.i. pa201805219648. maher n/a. | $5,000 |
| [201808248229](https://www.permitgraph.org/p/201808248229) | Aug 24, 2018 | Completed: final sign-off Feb 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floor 5 & 27: voluntary barrier removal: install power actuated door openers and associated push plates i elevator lobby, men's restroom & women's restroom in a single tenant floor. no change to exis… | $125,000 |
| [201805219648](https://www.permitgraph.org/p/201805219648) | May 21, 2018 | Completed: final sign-off Feb 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 12th floor: minor interior construction in a single tenant floor consisting of conversion of a conference room to a workroom and 2 small i.t. lab. workrooms into one i.t. lab work room including sele… | $700,000 |
| [201805098595](https://www.permitgraph.org/p/201805098595) | May 9, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floors 10-14: revision to 201803194060, new door & signage, electrical and plumbing changes maher na |  |
| [201805098596](https://www.permitgraph.org/p/201805098596) | May 9, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floor 26, ref 201803194056 blank off (e) dimmer & clor chnaging controls demo pantry sink & capped in janitor room maher na | $10,000 |
| [201805098597](https://www.permitgraph.org/p/201805098597) | May 9, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 16-17 floors - revision to 201803194061, blank of (e) dimmer & color chnaging controls, plumbing demo, sink & piping demo & capped maher na | $10,000 |
| [201805098598](https://www.permitgraph.org/p/201805098598) | May 9, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floor 21 flr revision to 201803194062 blank off (e) dimmer & color changing control maher na | $10,000 |
| [201805027973](https://www.permitgraph.org/p/201805027973) | May 2, 2018 | Completed: final sign-off Feb 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 17th fl - voluntary barrier removal: install power ocluded door openers & associated push plates in elevator & lobby & women's restroom in a single tenant floor | $10,000 |
| [201803305104](https://www.permitgraph.org/p/201803305104) | Mar 30, 2018 | Completed: final sign-off Sep 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Axis Construction](https://www.permitgraph.org/contractor/axis-construction-617681) | biuild temporary wall frame 2x4 and plywood in order to protect pedestrian. wall will be perpendicular to the back of the sidewalk outside from public right of way | $10,000 |
| [201803194060](https://www.permitgraph.org/p/201803194060) | Mar 19, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 10,11,12,& 14 floors: minor interior construction in a single tenant floor consisting of conversion of storage room to a personal locker area including selective demolition, partition and finishes. r… | $120,000 |
| [201803194062](https://www.permitgraph.org/p/201803194062) | Mar 19, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 19,20,21,22 floors: minor interior construction in a single tenant floor consisting of conversion of storage room to a personal locker area including selective demolition, partition and finishes. rel… | $120,000 |
| [201803194061](https://www.permitgraph.org/p/201803194061) | Mar 19, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floors 15,16,17, & 18: minor interior construction in a single tenant floor consisting of conversion of storage room to a personal locker area including selective demolition, partition and finishes.… | $120,000 |
| [201803194056](https://www.permitgraph.org/p/201803194056) | Mar 19, 2018 | Completed: final sign-off Mar 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floors 23,24,25, & 26 floors: minor interior construction in a single tenant floor consisting of conversion of storage room to a personal locker area including selective demolition, partition and fin… | $120,000 |
| [201803163891](https://www.permitgraph.org/p/201803163891) | Mar 16, 2018 | Never finaled: issued Mar 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | glass replacement, like for like, on north elevation for selective windows due to scratches. maher na/ | $800,000 |
| [201803143617](https://www.permitgraph.org/p/201803143617) | Mar 14, 2018 | Completed: final sign-off Feb 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | electrical only. ref pa 201712287541 |  |
| [201802201778](https://www.permitgraph.org/p/201802201778) | Feb 20, 2018 | Never finaled: issued Feb 2018, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217), [Axis Construction](https://www.permitgraph.org/contractor/axis-construction-617681) | address waterproofing deficiences at the lobby to bld. exteriors interface. no additional or modifications to be made to the bld area maher na | $180,000 |
| [201712287541](https://www.permitgraph.org/p/201712287541) | Dec 28, 2017 | Completed: final sign-off Feb 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | floors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher | $120,000 |
| [201710100699](https://www.permitgraph.org/p/201710100699) | Oct 10, 2017 | Completed: final sign-off Oct 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | as built drawings for fire alarm 201705176762. maher not req |  |
| [201706230265](https://www.permitgraph.org/p/201706230265) | Jun 23, 2017 | Completed: final sign-off Jun 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | t.i. for extg restaurant on 2nd floor. work includes new bathrooms, fixtures, finishes, int. walls, ceilings, insulation. fire protection under seperate permit. n/a for maher | $200,000 |
| [201705237387](https://www.permitgraph.org/p/201705237387) | May 23, 2017 | Never finaled: issued May 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | administrative permit only: no work. assembly permit only for lobby to document occupancy calculations. |  |
| [201705197101](https://www.permitgraph.org/p/201705197101) | May 19, 2017 | Completed: final sign-off Aug 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | 30th fl installation of ansul r102 fire suppression system in the main kitchen area on the 30th fl, ref pa 201607273487 n/a for maher. | $3,500 |
| [201705176762](https://www.permitgraph.org/p/201705176762) | May 17, 2017 | Completed: final sign-off Aug 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | floors 27 thru 30 fire alarm ti - ref pa 2016-0727-3487 including 1 control input module, 12 control relays, 72 duct detectors, 99 speaker/strobes, 11 smoke detectors. maher na | $88,000 |
| [201705166718](https://www.permitgraph.org/p/201705166718) | May 16, 2017 | Completed: final sign-off Jun 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision 201607273487, remove non bearing partitions at various conference rooms and rpelac with glass walls. change to finishes, door ty[e, lighting fixtures, cabinets furniture | $65,000 |
| [M784688](https://www.permitgraph.org/p/M784688) | May 11, 2017 | Never finaled: issued May 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | street space permit |  |
| [201705025422](https://www.permitgraph.org/p/201705025422) | May 2, 2017 | Never finaled: issued May 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | administrative permit revision to pa 2015-0217-8417 fire dept to provide "occupant load" stamp on 5th and 6th floors ti life safety plans a00.505 and a00.506 |  |
| [201704123762](https://www.permitgraph.org/p/201704123762) | Apr 12, 2017 | Never finaled: issued Apr 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | revision to 201703272363. revise 4 evac maps floors 27, 28,29,30 at elevator lobby only |  |
| [201704113738](https://www.permitgraph.org/p/201704113738) | Apr 11, 2017 | Completed: final sign-off Jun 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to 2016-0727-3487. revised smoke control system and fire alarm as required by tenant improvements. ** maher: n/a ** | $1,000 |
| [201704043193](https://www.permitgraph.org/p/201704043193) | Apr 4, 2017 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Axis Construction](https://www.permitgraph.org/contractor/axis-construction-617681) | exploratory permit - remove floor tiles in main lobby to inspect water leak. common area work - 3 areas of 4 sq. ft. work not visible from street; n/a maher | $2,000 |
| [201703272363](https://www.permitgraph.org/p/201703272363) | Mar 27, 2017 | Never finaled: issued Mar 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 16 evacuation plan maps for floor 27-30 | $6,400 |
| [201702169584](https://www.permitgraph.org/p/201702169584) | Feb 16, 2017 | Completed: final sign-off Sep 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | new pads for mechanical equipment on roof maher na | $5,000 |
| [201701247725](https://www.permitgraph.org/p/201701247725) | Jan 24, 2017 | Never finaled: issued Feb 2017, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | as-builts to 201601157169, 201603091546, 201607071721 evacuation plan maps. maher not req |  |
| [201701177237](https://www.permitgraph.org/p/201701177237) | Jan 17, 2017 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 27/f-30/f: level 27 (140) sprinklers, level 28 (140) sprinklers, level 29 (134) sprinklers, level 30 (129) sprinklers. n/a ordinance #155-13. t.i. pa#201607273487 | $275,000 |
| [201612306297](https://www.permitgraph.org/p/201612306297) | Dec 30, 2016 | Completed: final sign-off Sep 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to 201605036424. minor ti reconfiguration of conference room. new non bearing walls, ceiling, electrical fixtures . energy inspection, refer to pa#2015-07-29-2858. maher na | $21,000 |
| [201611011634](https://www.permitgraph.org/p/201611011634) | Nov 1, 2016 | Completed: final sign-off Sep 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 24th floor: revision 201507171838 minor revision to (e) office space reconfigure lightiing & mechanical, partitions | $18,500 |
| [201610130132](https://www.permitgraph.org/p/201610130132) | Oct 13, 2016 | Completed: final sign-off Jan 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | b1 - fire alarm - 1 smoke detector. 1 relay for door holder release maher na | $5,000 |
| [201609278857](https://www.permitgraph.org/p/201609278857) | Sep 27, 2016 | Completed: final sign-off Oct 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 27th, 28th, 29th, 30th floors: fire sprinkler system - relocation of sprinkler piping around stair opening on 27th through 30th floor and skylight opening on 30th floor. sprinklers fed at each level… | $8,000 |
| [201609137491](https://www.permitgraph.org/p/201609137491) | Sep 13, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | floors 27-30 demolition of finishes in 6 restrooms. removal of elevator lobby doors; ab-017 for floors 28,29 &30. | $15,000 |
| [201607273487](https://www.permitgraph.org/p/201607273487) | Jul 27, 2016 | Completed: final sign-off Sep 2020 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 27/f thru 30/f interior t.i. for single tenant of 4 floors (27/f through 30/f). includes interconnecting stairs between level 27/f thru 30/f.(n) non load bearing partitions,ceiling,floor finishes,hva… | $6,330,560 |
| [201607213016](https://www.permitgraph.org/p/201607213016) | Jul 21, 2016 | Never finaled: issued Aug 2016, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 28th-30th floor: structural only new slab penetration cut into level 28,29,30 at pre built stair knock out panel. no tendons are distrurbed during demo roof penetraions for skylights and mechanical (… | $100,000 |
| [201607202859](https://www.permitgraph.org/p/201607202859) | Jul 20, 2016 | Completed: final sign-off Sep 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on 24th floor, ref pa 2016-0428-5934. 3 relays, 13 duct detectors, 1 speaker, 20 speaker/strobes, 7 strobes. maher na | $15,000 |
| [201607202856](https://www.permitgraph.org/p/201607202856) | Jul 20, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on 22nd floor, ref pa 2015-1222-5746. 6 relays, 2 smoke detectors, 13 duct detectors, 1 speaker, 18 speaker/strobes, 7 strobes. maher na | $15,000 |
| [201607202858](https://www.permitgraph.org/p/201607202858) | Jul 20, 2016 | Completed: final sign-off Sep 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on 23rd floor, ref pa 2016-0428-5931. 3 relays, 13 duct detectors, 1 speaker, 19 speaker/strobes, 7 strobes. maher na | $15,000 |
| [201607152430](https://www.permitgraph.org/p/201607152430) | Jul 15, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 21st flr: fire alarm ti on 21st flr ref. 201512225745 including. 3 relays, 13 duct detectors, 1 speaker, 20 speaker/strobes,7 strobes; maher n/a | $15,000 |
| [201607071721](https://www.permitgraph.org/p/201607071721) | Jul 7, 2016 | Completed: final sign-off Oct 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 16 evac maps. flrs: 23,24,25,26 maher na | $6,400 |
| [201607071722](https://www.permitgraph.org/p/201607071722) | Jul 7, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on the 20th floor ref pa 2015-1222-5741 including 6 control relays, 2 smoke detectors, 13 duct detectors, 1 speaker, 19 speaker/strobes, 7 strobes | $15,000 |
| [201607071718](https://www.permitgraph.org/p/201607071718) | Jul 7, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm on 19th floor ref pa 2015-1221-5649 including 3 control relays, 13 duct detectors, 1 speaker, 19 speaker/strobe, 7 strobes. maher na | $15,000 |
| [201606301240](https://www.permitgraph.org/p/201606301240) | Jun 30, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 26th flr: fire alarm: ref pa 201602018483: 6 control relays, 1 speaker, 2 smoke detectors. 18 speaker/strobes, 13 duct detectors, 6 strobes maher na | $15,000 |
| [201606301238](https://www.permitgraph.org/p/201606301238) | Jun 30, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 25th flr: fire alarm: ref pa 201602119443: 6 control relays, 1 speaker, 2 smoke detectors. 19 speaker/strobes, 13 duct detectors, 7 strobes maher na | $15,000 |
| [201606210442](https://www.permitgraph.org/p/201606210442) | Jun 21, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 201512215643 including 6 control relays, 2 smoke detectors, 13 duct detectors, 1 speaker, 19 speaker strobes, 13 duct detectors, 7 strobes, compliance with maher ordinance no 155-13 not… | $15,000 |
| [201606210445](https://www.permitgraph.org/p/201606210445) | Jun 21, 2016 | Completed: final sign-off Jul 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 201512215648 including 3 control relays, 1 speaker, 19 speaker strobes, 13 duct detectors, 1 speaker, 19 speakers/strobes, 7 strobes. maher not req | $15,000 |
| [201605258251](https://www.permitgraph.org/p/201605258251) | May 25, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | revision to app# 201508053375 fire alarm ti on 5th & 6th floors., adding 3 speaker /stroke & 5 strokes, deleting 7 smoke detectors , 2 auct detectors, 1 speaker 1 strobe | $1,000 |
| [M692707](https://www.permitgraph.org/p/M692707) | May 19, 2016 | Never finaled: issued May 2016, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | street space & mta parking meter |  |
| [201605167499](https://www.permitgraph.org/p/201605167499) | May 16, 2016 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to 2016-0505-6678, revise stair railing with cables replacing glass. | $1,000 |
| [201605056678](https://www.permitgraph.org/p/201605056678) | May 5, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 5th and 6th floors: revision to app#201502178417. new detailing at convenience stair between 5th and 6th floor. n/a for maher. |  |
| [201605056606](https://www.permitgraph.org/p/201605056606) | May 5, 2016 | Never finaled: issued May 2016, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | to erect projecting channel letter sign to replace existing channel letter sign | $3,000 |
| [201605046463](https://www.permitgraph.org/p/201605046463) | May 4, 2016 | Completed: final sign-off Aug 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | on level 23 - fire sprinklers ti "salesforce" (92) adds & relocate fire sprinklers. pa 2016-0201-8480. maher na | $47,560 |
| [201605046462](https://www.permitgraph.org/p/201605046462) | May 4, 2016 | Completed: final sign-off Aug 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | on level 24 - fire sprinklers ti "salesforce (90) adds & relocates fire sprinklers. pa 2016-0211-9346. maher na | $46,530 |
| [201605036424](https://www.permitgraph.org/p/201605036424) | May 3, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 21st floor - revision to pa #201507292858 - minor revision to full floor tenant: removal of non-structural partition & relocate conference room & offices. n/a meher ordinance |  |
| [201604285934](https://www.permitgraph.org/p/201604285934) | Apr 28, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa 201507171838 for design layout modifications; maher n/a |  |
| [201604285931](https://www.permitgraph.org/p/201604285931) | Apr 28, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa 201507171832 for design layout modifications. |  |
| [201604205197](https://www.permitgraph.org/p/201604205197) | Apr 20, 2016 | Completed: final sign-off Aug 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 22nd flr: fire sprinklers for ti ref 2015 1222 5746 - add & relocate 90 maher na | $46,530 |
| [201604205196](https://www.permitgraph.org/p/201604205196) | Apr 20, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 21st flr: fire sprinklers for ref ti 2015 1222 5745 - add & relocate 90 maher na | $46,530 |
| [201603242945](https://www.permitgraph.org/p/201603242945) | Mar 24, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti of entire office space on floor 19, add 92 heads & relocate. ref pa 2015-1221-5649. maher na | $47,290 |
| [201603242947](https://www.permitgraph.org/p/201603242947) | Mar 24, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti on floor 25, add 92 heads & relocate. ref pa 2016-0211-9443. maher na | $47,290 |
| [201603242948](https://www.permitgraph.org/p/201603242948) | Mar 24, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti on floor 26, add 90 heads & relocate. ref pa 2016-0201-8483. maher na | $46,260 |
| [201603242944](https://www.permitgraph.org/p/201603242944) | Mar 24, 2016 | Completed: final sign-off May 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti in entire office space on floor 17, add 92 heads & relocate. ref pa 2015-1221-5643. maher na | $47,290 |
| [201603242946](https://www.permitgraph.org/p/201603242946) | Mar 24, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti on floor 20, add 90 heads & relocate. ref pa 2015-1222-5741. maher na | $46,260 |
| [201603242943](https://www.permitgraph.org/p/201603242943) | Mar 24, 2016 | Completed: final sign-off May 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers ti of entire office space on floor 18, add 92 heads & relocate. ref pa 2015-1221-5648. maher na | $47,290 |
| [201603111770](https://www.permitgraph.org/p/201603111770) | Mar 11, 2016 | Completed: final sign-off Aug 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 7th flr: revision to fire alarm t.i. pa#201508053380 including adding 1 duct detector, 4 strobes. n/a ordinance #155-13 | $1,000 |
| [201603111772](https://www.permitgraph.org/p/201603111772) | Mar 11, 2016 | Never finaled: issued Mar 2016, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | revision to fire alarm t.i. pa#201508113904 including adding 1 duct detector, 1 speaker, 4 strobes. n/a ordinance #155-13 | $1,000 |
| [201603111771](https://www.permitgraph.org/p/201603111771) | Mar 11, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | revision to fire alarm t.i. pa#201508053345 including adding 1 duct detector, 4 strobes. n/a ordinance #155-13 | $1,000 |
| [201603101660](https://www.permitgraph.org/p/201603101660) | Mar 10, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 15th floor: fire alarm t.i. ref pa 2015 1208 4457: include 3 relays, 1 speaker, 19 speakers/strobes, 13 duct detectors, 7 strobes. | $10,000 |
| [201603101659](https://www.permitgraph.org/p/201603101659) | Mar 10, 2016 | Completed: final sign-off Mar 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 16th floor: fire alarm t.i. ref pa 2015 1208 4509: include 6 relays, 2 speakers, 2 smoke detectors, 19 speakers/strobes, 13 duct detectors, 7 strobes. maher na | $10,000 |
| [201603091546](https://www.permitgraph.org/p/201603091546) | Mar 9, 2016 | Never finaled: issued Apr 2016, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 5th through 9 floors and 17th through 22 floors: 44 evacuation maps n/a for maher | $17,600 |
| [201603031074](https://www.permitgraph.org/p/201603031074) | Mar 3, 2016 | Completed: final sign-off Apr 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 5th flr: fire sprinkler system revised per permit 201506259970; maher n/a |  |
| [201603031075](https://www.permitgraph.org/p/201603031075) | Mar 3, 2016 | Completed: final sign-off Jun 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 6th flr: fire sprinkler system revised per permit 201507161647; maher n/a |  |
| [201602250448](https://www.permitgraph.org/p/201602250448) | Feb 25, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 12th fl/level. 4 control relays (for 12 multi-voltage relays fan control), 12 duct det, 1 speaker, 21 speaker/strobes, 7 strobes maher not req | $10,000 |
| [201602250447](https://www.permitgraph.org/p/201602250447) | Feb 25, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 14th fl/level, 6 control relays, 2 smoke det, 13 duct det, 1 speaker, 19 speaker strobes, 7 strobes maher not req. node connection on 12th level not 11th level. levels and floors are di… | $10,000 |
| [201602119376](https://www.permitgraph.org/p/201602119376) | Feb 11, 2016 | Completed: final sign-off Mar 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | levels 7-9: fire sprinkler system revision to app#201507161704. tenant walls and ceiling revised. t.i app# is 201503312421. n/a for maher |  |
| [201602119346](https://www.permitgraph.org/p/201602119346) | Feb 11, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa 2015-0717-1838. minor revisions to non-bearing walls, mep revisions to include. add offices (phone rooms) to north side of floor. maher na | $225,000 |
| [201602119443](https://www.permitgraph.org/p/201602119443) | Feb 11, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to 201505015181. minor revisions to non bearing walls, mep revisions maher not req | $250,000 |
| [201602099097](https://www.permitgraph.org/p/201602099097) | Feb 9, 2016 | Completed: final sign-off Mar 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 10th floor: revision to app#201508053346 fire alarm for adding 1 duct detector and 3 strobes. ref app#201504214211. n/a for maher | $2,000 |
| [201602099096](https://www.permitgraph.org/p/201602099096) | Feb 9, 2016 | Completed: final sign-off Mar 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 11th floor: revision to app#201508053347 fire alarm for adding 1 duct detector and 3 strobes. ref app#201504214211. n/a for maher | $2,000 |
| [201602018483](https://www.permitgraph.org/p/201602018483) | Feb 1, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 26th fl: revision to pa# 2015-0511-5998, minor revision to non bearing walls. mep. revision included. n/a ordinance #155-13 | $235,000 |
| [201602018480](https://www.permitgraph.org/p/201602018480) | Feb 1, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa# 201507171832, minor revision to non bearing walls. mep. revision included. n/a ordinance #155-13 | $225,000 |
| [201601298355](https://www.permitgraph.org/p/201601298355) | Jan 29, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinkler t.i. salesforce level #14: 92 added and relcated sprinklers. n/a for maher. ref app#201512084523 | $47,280 |
| [201601298352](https://www.permitgraph.org/p/201601298352) | Jan 29, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinkler t.i. salesforce level #12: 90 added and relcated sprinklers. n/a for maher. ref app#201512084518 | $46,260 |
| [201601298356](https://www.permitgraph.org/p/201601298356) | Jan 29, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 15th flr: fire sprinkler t/i "salesforce" level #15, 92 added and relocated sprinklers, apn 201512084457; maher n/a | $47,280 |
| [201601298353](https://www.permitgraph.org/p/201601298353) | Jan 29, 2016 | Completed: final sign-off Sep 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 16th flr: fire sprinkler t/i "salesforce" level #16, 92 added and relocated sprinklers, apn 201512084509; maher n/a | $47,280 |
| [201601227685](https://www.permitgraph.org/p/201601227685) | Jan 22, 2016 | Completed: final sign-off Feb 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 5th floor: pre-action sprinkler control . ref pa 2015 0625 9970 includes 3 smoke det. 1 bell. maher n/a | $2,000 |
| [201601157169](https://www.permitgraph.org/p/201601157169) | Jan 15, 2016 | Completed: final sign-off Jan 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | 24 evacuation plan maps for floors 10, 11, 12, 14, 15, 16. n/a ordinance #155-13. new bldg. pa#201108011461 | $9,600 |
| [201601126847](https://www.permitgraph.org/p/201601126847) | Jan 12, 2016 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 5th and 6th floors: revision to pa 2015-0217-8417. minor changes to wall, ceilings & doors. revise finishes, carpet and change to pantry counter. mep included with this permit. maher na | $226,000 |
| [201601076575](https://www.permitgraph.org/p/201601076575) | Jan 7, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 10th floor fire sprinklers t.i. "salesforce" - added 44 & relocated sprinklers. ref pa #201512074363. | $22,600 |
| [201601076576](https://www.permitgraph.org/p/201601076576) | Jan 7, 2016 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 11th floor fire sprinklers t.i. "salesforce" - added 42 & relocated sprinklers. ref pa #201512074365 | $21,590 |
| [201512225741](https://www.permitgraph.org/p/201512225741) | Dec 22, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa# 201507292857 minor changes to doors, frames and walls, revised carpets, finishes and millwork, minor lighting changes, mep. included. n/a ordinance #155-13. | $225,000 |
| [201512225746](https://www.permitgraph.org/p/201512225746) | Dec 22, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 22nd fl: revision to pa# 2015-0724-2411 minor changes to doors, frames and walls, revised carpets, finishes and millwork, minor lighting changes, mep. included. n/a ordinance #155-13. life safety def… | $225,000 |
| [201512225745](https://www.permitgraph.org/p/201512225745) | Dec 22, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa# 201507292858 minor changes to doors, frames and walls, revised carpets, finishes and millwork, minor lighting changes, mep. included. n/a ordinance #155-13. | $225,000 |
| [201512215643](https://www.permitgraph.org/p/201512215643) | Dec 21, 2015 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 17th floor: revision to app#201506199480, minor changes to doors, frames and walls, revise carpet finishes, millwork, and minor lighting changes. mep included. n/a for maher. | $225,000 |
| [201512215649](https://www.permitgraph.org/p/201512215649) | Dec 21, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 19th floor: revision to app#201507292852, minor changes to doors, frames and walls, revise carpet finishes, millwork, and minor lighting changes. mep included. n/a for maher. | $225,000 |
| [201512215648](https://www.permitgraph.org/p/201512215648) | Dec 21, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 18th floor: revision to app#201506199481, minor changes to doors, frames and walls, revise carpet finishes, millwork, and minor lighting changes. mep included. n/a for maher. | $230,000 |
| [201512114842](https://www.permitgraph.org/p/201512114842) | Dec 11, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 9th floor: revision to pa 2015-0421-4206. minor revisions to finishes carpet, millwork. changes to door, frames, walls, minor changes to light. mep included. maher na | $218,000 |
| [201512114839](https://www.permitgraph.org/p/201512114839) | Dec 11, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 8th floor: revision to pa 2015-0331-2424 minor doors, frams and wall changes. revised carpet, finishes, millwork, minor lighting changes. mep included. maher na | $222,000 |
| [201512104773](https://www.permitgraph.org/p/201512104773) | Dec 10, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 7th floor: revision to app#201503312421. revise carpet, millwork, finishes, minor change to doors, frames, and partitions. minor electrical lighting changes. n/a for maher | $218,000 |
| [201512084457](https://www.permitgraph.org/p/201512084457) | Dec 8, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa# 201506128881, revise finish, carpet, millwork, minor wall and door changes, minor lighting changes, work on 15/f. n/a ordinance#155-13. | $185,000 |
| [201512084518](https://www.permitgraph.org/p/201512084518) | Dec 8, 2015 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa 2015-0609-8529 revision to finishes, carpet, millwork. minor partition & door changes. minor lighting revisions mep included. maher na | $225,000 |
| [201512084523](https://www.permitgraph.org/p/201512084523) | Dec 8, 2015 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to pa 2015-0609-8531 revision to finishes, carpet, millwork. minor partition & door changes. minor lighting revisions mep included. maher na | $217,000 |
| [201512084509](https://www.permitgraph.org/p/201512084509) | Dec 8, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision 201506128880. revise finish, carpet, millwork, minor wall and door changes, minor lighting changes. mep included. work on 16th level | $175,000 |
| [201512074363](https://www.permitgraph.org/p/201512074363) | Dec 7, 2015 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision 201504214208. revise finishes, millwork , cabinets, minor wall, and door changes. minor lighting changes maher not req on 10th floor | $200,000 |
| [201512074365](https://www.permitgraph.org/p/201512074365) | Dec 7, 2015 | Completed: final sign-off Jul 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | revision to 201504214211. revise finish, carpet, millwork, minor wall and door changes, minor lighting changes maher not req on 11th floor | $75,000 |
| [M625687](https://www.permitgraph.org/p/M625687) | Sep 29, 2015 | Never finaled: issued Sep 2015, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) |  | street space |  |
| [201509106656](https://www.permitgraph.org/p/201509106656) | Sep 10, 2015 | Never finaled: issued Sep 2015, no final | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | revision to app#201108011461 (s5) to include ab005 for fuel oil generator piping. |  |
| [201508113904](https://www.permitgraph.org/p/201508113904) | Aug 11, 2015 | Completed: final sign-off May 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 9th floor fire alarm t.i. including 6 control relays, 24 speakers/strobes, 2 smoke detectors, 12 duct detectors. ref #201504214206. n/a maher ordinance | $11,000 |
| [201508103795](https://www.permitgraph.org/p/201508103795) | Aug 10, 2015 | Completed: final sign-off Jun 2018 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 3rd, 4th and basement - modification to doors & walls. card readers for access control to storerooms. | $100,000 |
| [201508053346](https://www.permitgraph.org/p/201508053346) | Aug 5, 2015 | Completed: final sign-off Jul 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on the 10th floor, ref pa 201504214208. including 3 control relays, 25 speaker strobes, 12 duct detectors. fire alarm 201108011461, s-8. compliance with maher ordinance no 155-13 not re… | $10,000 |
| [201508053347](https://www.permitgraph.org/p/201508053347) | Aug 5, 2015 | Completed: final sign-off Mar 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on the 11th floor, ref pa 201504214211. including 6 control relays, 24 speaker strobes, 12 duct detectors, 2 smoke detectors. fire alarm 201108011461, s8. compliance with maher ordinanc… | $10,000 |
| [201508053375](https://www.permitgraph.org/p/201508053375) | Aug 5, 2015 | Completed: final sign-off Aug 2019 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm t.i. on 5/f & 6/f including 1 loop controller, 13 control relays, 1 speaker, 34 duct detectors, 11 imput/output modules, 37 speaker/strobes, 5 smoke detectors, 3 imput modules, 2 strobes.… | $27,000 |
| [201508053380](https://www.permitgraph.org/p/201508053380) | Aug 5, 2015 | Completed: final sign-off May 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm t.i. on 7/f including 3 control relays, 12 duct detectors, 24 speaker/strobes, 2 smoke detectors, t.i. pa#201503312421. n/a ordinance #155-13 | $10,000 |
| [201508053345](https://www.permitgraph.org/p/201508053345) | Aug 5, 2015 | Completed: final sign-off May 2016 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on the 8th floor, ref pa 201503312424. including 3 control relays, 25 speaker strobes, 12 duct detectors. fire alarm 201108011461, s-8. compliance with maher ordinance no 155-13 not req… | $10,000 |
| [201507292857](https://www.permitgraph.org/p/201507292857) | Jul 29, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 20th floor: full floor t.i. non bearing walls, card readers in elevator lobbies, fire alarm, sprinklers on seperate permit. n/a for maher. | $1,450,000 |
| [201507292858](https://www.permitgraph.org/p/201507292858) | Jul 29, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 21st floor: full floor t.i. non bearing walls, card readers in elevator lobbies, fire alarm, sprinklers on seperate permit. n/a for maher. | $1,450,000 |
| [201507292852](https://www.permitgraph.org/p/201507292852) | Jul 29, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 19th floor: full floor t.i. non bearing walls, card readers in elevator lobbies, fire alarm, sprinklers on separate permit. n/a for maher. | $1,450,000 |
| [201507242411](https://www.permitgraph.org/p/201507242411) | Jul 24, 2015 | Completed: final sign-off Sep 2017 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | t.i. of full tenant with new non-bearing walls and card readers in elevator lobby. raised floor, restrooms, & sprinkler & fire alarm on separate permit. n/a ordinance #155-13 | $1,450,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) (47), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) (41), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (24), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (21), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (17), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (7), [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) (7), [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) (5), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (3), [Axis Construction](https://www.permitgraph.org/contractor/axis-construction-617681) (3), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (3), [Pvl Signs & Graphics Inc](https://www.permitgraph.org/contractor/pvl-signs-graphics-inc-907484) (3), [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) (2), [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) (2), [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215), [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478), [Hp Build](https://www.permitgraph.org/contractor/hp-build-1048290), [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827), [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047), [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064)
- Architects: [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821) (17), [Scott Clement](https://www.permitgraph.org/professional/scott-clement-C36455) (11), [Wing K. Lee](https://www.permitgraph.org/professional/wing-k-lee-C28929) (3), [Clifton Boswell](https://www.permitgraph.org/professional/clifton-boswell-C26963) (2), [Donnie Lam](https://www.permitgraph.org/professional/donnie-lam-C32542) (2), [Adam Wing](https://www.permitgraph.org/professional/adam-wing-29484), [Ariane Lebrilla](https://www.permitgraph.org/professional/ariane-lebrilla-C38312), [Brian Milford](https://www.permitgraph.org/professional/brian-milford-C33430), [Dennis Heath](https://www.permitgraph.org/professional/dennis-heath-C12815), [Guion Chilldress](https://www.permitgraph.org/professional/guion-chilldress-C39053), [Sashikala Murthy](https://www.permitgraph.org/professional/sashikala-murthy-C39484)
- Engineers: [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (7), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097) (6), [Jillian P. Moritz](https://www.permitgraph.org/professional/jillian-p-moritz-E19179) (5), [Wenda Wang](https://www.permitgraph.org/professional/wenda-wang-E23652) (2), [Anthony Pusatera](https://www.permitgraph.org/professional/anthony-pusatera-M41424), [Darby Scott Rowland](https://www.permitgraph.org/professional/darby-scott-rowland-E21338), [Justin Schultz](https://www.permitgraph.org/professional/justin-schultz-M35462), [Saied Nazeri](https://www.permitgraph.org/professional/saied-nazeri-M29621), [Steve Kang](https://www.permitgraph.org/professional/steve-kang-34668), [Steve Kang](https://www.permitgraph.org/professional/steve-kang-M346658), [Steve Kang](https://www.permitgraph.org/professional/steve-kang-M34668), [Todd M. See](https://www.permitgraph.org/professional/todd-m-see-M30765)
- Designers: [Convergint Technologies Llc](https://www.permitgraph.org/professional/convergint-technologies-llc-986407)
- Pmt consultant/expediters: [Dale Newkirk](https://www.permitgraph.org/professional/dale-newkirk-C33388)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3710/017.