# 731 Market St

Block 3706, lot 062. Page: https://www.permitgraph.org/a/3706/062

- City's use: Commercial Office
- Built: 1908
- Stories: 6
- Rooms: 10 bathrooms
- Building: 92,951 sq ft
- Lot: 14,496 sq ft
- Zoning: C3R
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

124 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202608176706](https://www.permitgraph.org/p/202608176706) | Aug 17, 2026 | In progress: issued Oct 2026 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | ste 200, tenant improvement to include selective demolition on non-structural partitions, ceilings, lighting and finishes. construction of non-structural partitions, ceiling, lighting, millwork finis… | $1,225,000 |
| [202012161113](https://www.permitgraph.org/p/202012161113) | Dec 16, 2020 | Completed: final sign-off Feb 2021 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | bsmnt & 1st fl. fire life safety: install (2) wall mount horn-strobes, (1) smoke detector w/base, (2) control relays. passenger elevator modernization. | $3,300 |
| [202011128785](https://www.permitgraph.org/p/202011128785) | Nov 12, 2020 | Completed: final sign-off Jun 2021 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | fire sprinkler: voluntary elevator modernization. remove fire sprinklers, pipe, fitting, and hangers from elevator shaft and machine rooms per sffd approved letter dated 09.21.2020 | $2,500 |
| [202009305593](https://www.permitgraph.org/p/202009305593) | Sep 30, 2020 | Expired or cancelled: withdrawn Dec 2020 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | exterior facade maintenance & repair at rear (stevenson st):removal of (e) non-original painted cement plaster.brick masonry repair/restoration.sheet metal repir & restoration.flashing & waterproofin… | $500,000 |
| [M1151467](https://www.permitgraph.org/p/M1151467) | Oct 10, 2019 | Never finaled: issued Oct 2019, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [201908280014](https://www.permitgraph.org/p/201908280014) | Aug 28, 2019 | Never finaled: issued Aug 2019, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | suite 200: lighting control system - title 24. retrofit 14 down lights, demo 30 light fixtures, install 23 new light fixtures. electrical work only. | $80,000 |
| [201905221343](https://www.permitgraph.org/p/201905221343) | May 22, 2019 | Never finaled: issued May 2019, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 5th & 6th fl fire alarm ti: install 2 control relays, install 2 smoke detectors. | $2,640 |
| [201904188360](https://www.permitgraph.org/p/201904188360) | Apr 18, 2019 | Expired or cancelled: cancelled Jan 2026 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | installation of card readers at it room, elevator lobby and freight elevator at 6th fl only | $8,000 |
| [201904188332](https://www.permitgraph.org/p/201904188332) | Apr 18, 2019 | Expired or cancelled: cancelled Jan 2026 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | installation of card readers at it room, elevator lobby and freight elevator at 5th and 6th fl only | $8,000 |
| [201901291471](https://www.permitgraph.org/p/201901291471) | Jan 29, 2019 | Completed: final sign-off Feb 2019 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm voluntary tenant improvement install 2 pull stations | $800 |
| [M1008187](https://www.permitgraph.org/p/M1008187) | Nov 21, 2018 | Never finaled: issued Nov 2018, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [201810233831](https://www.permitgraph.org/p/201810233831) | Oct 23, 2018 | Never finaled: issued Oct 2018, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm ti install 1 control relay. 3rd & 4th fl. | $600 |
| [M964447](https://www.permitgraph.org/p/M964447) | Aug 14, 2018 | Never finaled: issued Aug 2018, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [201705237338](https://www.permitgraph.org/p/201705237338) | May 23, 2017 | Completed: final sign-off Nov 2017 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Legacy Mechanical & Energy Services, Inc](https://www.permitgraph.org/contractor/legacy-mechanical-energy-services-inc-808022) | roof top- like for like replacement of (1) 60 tons capacity air cooled chiller & expansion tank. | $90,000 |
| [201705035611](https://www.permitgraph.org/p/201705035611) | May 3, 2017 | Completed: final sign-off May 2017 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install (1) smoke detector with base as built to pa 2016-0526-8520 | $500 |
| [201607223082](https://www.permitgraph.org/p/201607223082) | Jul 22, 2016 | Completed: final sign-off Aug 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | basement: fire alarm ti - install 1 wall mount horn-strobe | $400 |
| [201607212951](https://www.permitgraph.org/p/201607212951) | Jul 21, 2016 | Never finaled: issued Jul 2016, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers: add 1 pendent sprinkler head in new bathroom at basement level. ti ref pa 2016-0525-8325 | $1,000 |
| [201606039122](https://www.permitgraph.org/p/201606039122) | Jun 3, 2016 | Completed: final sign-off Dec 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gidel & Kocal Construction Co Inc](https://www.permitgraph.org/contractor/gidel-kocal-construction-co-inc-403050) | gr flr - new pharmacy counter upgrades, new drinking fountain, relocate bath fixtures, barrier removal | $40,000 |
| [201605268520](https://www.permitgraph.org/p/201605268520) | May 26, 2016 | Completed: final sign-off Jun 2017 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | grnd flr: fire alarm tenant improvement, install (1) control relay module. | $400 |
| [201605258325](https://www.permitgraph.org/p/201605258325) | May 25, 2016 | Completed: final sign-off Sep 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | modification of existing trashroom to inlcude selective demo and construction of non load bearing partitions, new ceiling, new light fixtures and accessible restroom. all work is within the (e) trash… | $40,000 |
| [201605248190](https://www.permitgraph.org/p/201605248190) | May 24, 2016 | Completed: final sign-off Jun 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | 4th floor - 3 evacuation signs per plans | $1,350 |
| [201604154936](https://www.permitgraph.org/p/201604154936) | Apr 15, 2016 | Completed: final sign-off Jun 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 4th floor: fire alarm t.i. to install 1 booster panel, install 1 signal module, install 2 pull stations, install 1 ceiling mount strobe, install 2 hall mount strobes, install 12 ceiling mount horn-st… | $13,200 |
| [201603243027](https://www.permitgraph.org/p/201603243027) | Mar 24, 2016 | Completed: final sign-off Jun 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065) | 4th floor hvac, ti: provide & install nine fan coils, condensate piping, supply & return air duct work, two new transfer exahust systems, one outside air fan system. ref pa 2016-0217-9764 | $230,000 |
| [201603162151](https://www.permitgraph.org/p/201603162151) | Mar 16, 2016 | Completed: final sign-off May 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers; relocated 95 upright sprinklers on the 4th floor. relocate 19 pendent sprinklers, ti 206-0217-9764 | $58,710 |
| [201603152007](https://www.permitgraph.org/p/201603152007) | Mar 15, 2016 | Completed: final sign-off Jun 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | work is based off of the electrically engineered drawings ref pa 2016-0217-9764. partial scope office tenant retrofit lighting, power and signal, wiring, lighting & receptacle controls. | $195,000 |
| [201602179764](https://www.permitgraph.org/p/201602179764) | Feb 17, 2016 | Completed: final sign-off Jun 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | ste 400: selective demolition of partitions, new ceiling, light fixtures, doors and frames, millworks, sinks, finishes and accessible restrooms. mep/life safety deferred. | $544,000 |
| [201506158939](https://www.permitgraph.org/p/201506158939) | Jun 15, 2015 | Never finaled: issued Jun 2015, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Jeffco Roofing Co](https://www.permitgraph.org/contractor/jeffco-roofing-co-455190) | reroofing | $106,000 |
| [201502269435](https://www.permitgraph.org/p/201502269435) | Feb 26, 2015 | Completed: final sign-off Mar 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | revision appl. 2014.0716.1376 & 2014.0605.7611. add doucumention for ejector pump pit for record. maher n/a. |  |
| [M559127](https://www.permitgraph.org/p/M559127) | Feb 12, 2015 | Never finaled: issued Feb 2015, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [201412153739](https://www.permitgraph.org/p/201412153739) | Dec 15, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm tenant improvement, install 7 smoke detectors, install 2 control relay modules. t.i. pa#201405014666 | $3,600 |
| [201411040702](https://www.permitgraph.org/p/201411040702) | Nov 4, 2014 | Never finaled: issued Nov 2014, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 5th floor: install 1 booster panel, install 17 ceiling mount horn-strobes, 2 smoke detectors with base, 2 pull stations, 2 control relay modules and 1 signal module. ref. appl. 2014.0627.9804. maher… | $20,000 |
| [201410290158](https://www.permitgraph.org/p/201410290158) | Oct 29, 2014 | Completed: final sign-off Nov 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 5th flr: relocate 27 pendant sprinklers on the 5th flr, relocate 66 upright heads, t.i. #201406279804; maher n/a | $47,895 |
| [201410148834](https://www.permitgraph.org/p/201410148834) | Oct 14, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | as built revision to 201409237080. 1 duct detector relocated, 1 duct detector deleted, fire alarm ti for basement |  |
| [201410088455](https://www.permitgraph.org/p/201410088455) | Oct 8, 2014 | Expired or cancelled: cancelled Jan 2026 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | as built revision to pa 201409237080. fire alarm work: 2 fsd and 1 control relay modul were not installed. |  |
| [201409267476](https://www.permitgraph.org/p/201409267476) | Sep 26, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | modification ot existing building lobby to include construction of non structural partition, modification to ceiling, moulding, light fixture.(sprinklers under separate permit) | $27,000 |
| [201409257271](https://www.permitgraph.org/p/201409257271) | Sep 25, 2014 | Expired or cancelled: cancelled Mar 2017 | [250 Stevenson St](https://www.permitgraph.org/a/3706/062) | [Gigabyte Graphics Inc. Dba Fastsigns](https://www.permitgraph.org/contractor/gigabyte-graphics-inc-dba-fastsigns-964587) | erect a non electric single faced sign (sign "a"0 | $1,000 |
| [201409257274](https://www.permitgraph.org/p/201409257274) | Sep 25, 2014 | Never finaled: issued Oct 2016, no final | [250 Stevenson St](https://www.permitgraph.org/a/3706/062) | [Gigabyte Graphics Inc. Dba Fastsigns](https://www.permitgraph.org/contractor/gigabyte-graphics-inc-dba-fastsigns-964587) | erect a non electric single faced sign (side of the bldg) sign "b" | $5,000 |
| [201409237080](https://www.permitgraph.org/p/201409237080) | Sep 23, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 18 wall mount horn strobes, install 3 wall mount strobes, install 1 wall mount horn, install 1 signal module, install 9 control relay modules, install 4 pull stations, install 9 duct detector… | $21,600 |
| [201409116049](https://www.permitgraph.org/p/201409116049) | Sep 11, 2014 | Completed: final sign-off Dec 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | revision to previously submitted mechanical dwgs, orig permit no. 201406279804. | $65,000 |
| [201409095774](https://www.permitgraph.org/p/201409095774) | Sep 9, 2014 | Completed: final sign-off Sep 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 31 pendent sprinklers on the basement level. relocate 7 uppright sprinklers, upgrade end of bracing. ref ti #2014-0605-7611 | $19,570 |
| [201409035275](https://www.permitgraph.org/p/201409035275) | Sep 3, 2014 | Completed: final sign-off Aug 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | structural improvement limited to infill of existing clearstory openings into basement at 731 market | $38,000 |
| [M512447](https://www.permitgraph.org/p/M512447) | Aug 21, 2014 | Never finaled: issued Aug 2014, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space permit |  |
| [M506647](https://www.permitgraph.org/p/M506647) | Jul 24, 2014 | Never finaled: issued Jul 2014, no final | [250 Stevenson St](https://www.permitgraph.org/a/3706/062) |  | per pa #201406057611, to create address for office in church as; 250 stevenson st at block 3706, lot 062. |  |
| [201407161376](https://www.permitgraph.org/p/201407161376) | Jul 16, 2014 | Completed: final sign-off Mar 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | revision to appl #2014.0605.7611 - five columns to be removed at basement level of structure. the steel beams that frame into the (e) columns will be re-supported by new beams, span between new colum… | $193,000 |
| [201407080730](https://www.permitgraph.org/p/201407080730) | Jul 8, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 2 ceiling mount horn-strobe. relocate 1 ceiling mount horn-strobe. remove 1 ceiling mount horn-strobe. ref. t.i. appl. 201405216392. maher n/a. | $1,600 |
| [M501928](https://www.permitgraph.org/p/M501928) | Jul 2, 2014 | Never finaled: issued Jul 2014, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [201406279804](https://www.permitgraph.org/p/201406279804) | Jun 27, 2014 | Completed: final sign-off Aug 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 5/f: modification and expansion of existing space, improvements to include selective demo, and construction of non-structual partitions, new ceiling grid and tiel, light fixtures, office doors and fr… | $1,250,000 |
| [201406269648](https://www.permitgraph.org/p/201406269648) | Jun 26, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | m.e.p. for pa#201406057611 | $225,000 |
| [201406067702](https://www.permitgraph.org/p/201406067702) | Jun 6, 2014 | Completed: final sign-off Jul 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | 3rd floor suite 300 sprinkler renovations , 8 new heads, 5 relocates. ref #201405216392. | $3,400 |
| [201406057611](https://www.permitgraph.org/p/201406057611) | Jun 5, 2014 | Completed: final sign-off Mar 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | change of use to church from office. construct new non-structural partitions, ceiling grid and tile, new lighting fixtures, new doors and frames, millwork, sinks and finishes, add hvac unit on roof.… | $700,000 |
| [201405236612](https://www.permitgraph.org/p/201405236612) | May 23, 2014 | Completed: final sign-off Jun 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 1st through 6th flrs: add 4 upright sprinkler and delete 1 on basement level. add one sidewall sprinkler on the 1st flr. add 1 upright sprinkler on the 2nd flr & delete one sprinkler. relocate 1 upri… | $5,150 |
| [201405216392](https://www.permitgraph.org/p/201405216392) | May 21, 2014 | Completed: final sign-off Aug 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | selective demo and construction of non structural partitons, modify existing ceiling gid. new doors and frames, millwork, rework lighting. sprinkler, life safety, mep under sep permit | $81,000 |
| [201405014666](https://www.permitgraph.org/p/201405014666) | May 1, 2014 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | basement:this work is limitted to cold shell modifications including the construction of a trash room, janitor's room, engineering office, and the addition of an elevator vestibule and connecting cor… | $75,000 |
| [201401247000](https://www.permitgraph.org/p/201401247000) | Jan 24, 2014 | Completed: final sign-off Feb 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | basement:add 5 upright sprinkler and 3 pendents at new stairs in the basement. ref app#201307222423 | $4,120 |
| [201312194648](https://www.permitgraph.org/p/201312194648) | Dec 19, 2013 | Completed: final sign-off May 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 1 ceiling horn-strobes, install 1 smoke detector with base, install 11 dual monitor modules and install 1 control relay module. | $5,600 |
| [201312174351](https://www.permitgraph.org/p/201312174351) | Dec 17, 2013 | Completed: final sign-off Jul 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | this work is limited to the addition of one maintenance room including new partitions, doors, and lighting.this work introduces new bldg service space part of the cold shell build out of the basement… | $15,000 |
| [201312134128](https://www.permitgraph.org/p/201312134128) | Dec 13, 2013 | Completed: final sign-off Apr 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | revision to appl #2013.1105.1118 - rating of (e) elevation machine room & structure. | $2,000 |
| [201311151967](https://www.permitgraph.org/p/201311151967) | Nov 15, 2013 | Never finaled: issued Nov 2013, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | add new sprinkler system on the 4th floor, add 98 pendent sprinkler heads, new end of line bracing. ref. pa#201309277896. | $50,470 |
| [201311051118](https://www.permitgraph.org/p/201311051118) | Nov 5, 2013 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | revision 1: modification to structural framing per as-built conditions; set-back of ground level storefront, revisiotn to 201307222423 | $2,500 |
| [201311051120](https://www.permitgraph.org/p/201311051120) | Nov 5, 2013 | Never finaled: issued Nov 2013, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | add new sprinkler system on 5th floor, add 98 pendent sprinkler heads, ref to pa#201309277896 (6th floor) . new end of line bracing and earthquake bracing. | $50,372 |
| [201309277896](https://www.permitgraph.org/p/201309277896) | Sep 27, 2013 | Completed: final sign-off May 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 6th floor-add new sprinkler system on 6th floor. add 144 upright sprinklers & add 22 pendent sprinklers. new end of line & e.q bracing. install new fire pump in the basement. hydraulic calculation in… | $90,640 |
| [M419167](https://www.permitgraph.org/p/M419167) | Aug 20, 2013 | Never finaled: issued Aug 2013, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space permit |  |
| [201307222427](https://www.permitgraph.org/p/201307222427) | Jul 22, 2013 | Completed: final sign-off May 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | new 1-hr fire rated enclosure at future pump room (part of sprinkler retrofit), includes new 60 min. entry door in basement level. core and shell work. t.i. work under separate permit. | $3,500 |
| [201307222423](https://www.permitgraph.org/p/201307222423) | Jul 22, 2013 | Completed: final sign-off Jan 2015 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | new stevenson street entry with new lobby and canopy; storefront, interior entry stair into basement, and enclosure of 1 existing exit stair. core and shell per ab-017. ti under separate permit. | $324,425 |
| [201305207367](https://www.permitgraph.org/p/201305207367) | May 20, 2013 | Completed: final sign-off May 2014 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd floor - add new sprinkler system - add 71 new uprights & add 17 pendent sprinklers, new end of line & earthquake bracing. ref pa #2013.02.15.0305 | $45,320 |
| [201305096563](https://www.permitgraph.org/p/201305096563) | May 9, 2013 | Never finaled: issued May 2013, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | 2nd floor-installation of 8 air handling units with heating & chilled meter coils, hot & chilled water piping. installation of duct work, installation of fresh air fan | $180,000 |
| [201304255459](https://www.permitgraph.org/p/201304255459) | Apr 25, 2013 | Completed: final sign-off Jun 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 2nd floor-install 9 ceiling horn strobes, 1 ceiling strobe, 5 wall horn strobes, 3 wall strobes, 2 smoke detectors with base, 3 pull stations, 8 control relay modules, 1 booster panel & 1 signal modu… | $13,200 |
| [201304195044](https://www.permitgraph.org/p/201304195044) | Apr 19, 2013 | Never finaled: issued Apr 2013, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | 2nd floor-install 3 evacuation signs | $1,050 |
| [201303222858](https://www.permitgraph.org/p/201303222858) | Mar 22, 2013 | Completed: final sign-off Apr 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | mechanical only - new distribution of air per new layout. other work done under pa #201209270827. | $45,000 |
| [201302150305](https://www.permitgraph.org/p/201302150305) | Feb 15, 2013 | Completed: final sign-off Jul 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 2nd floor:demo of non structural partition, new non structural partitions, suspended, ceilings, new light fixtures, doors and frames, millwork and finishes. barrier removal in restrooms. mep, sprinkl… | $638,000 |
| [201302089790](https://www.permitgraph.org/p/201302089790) | Feb 8, 2013 | Completed: final sign-off Mar 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | evacuation map 6th fl | $1,200 |
| [201301188290](https://www.permitgraph.org/p/201301188290) | Jan 18, 2013 | Completed: final sign-off Jan 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | ti pa#2012-09-27-0827 install 14 ceiling horn-strobes, 1 wall horn-strobe, 2 wll strobes, 3 smoke detector w/ base, 2 pull stations, 2 control relay modules, 1 booster panel, 1 signal module, connect… | $11,200 |
| [201209270827](https://www.permitgraph.org/p/201209270827) | Sep 27, 2012 | Completed: final sign-off Apr 2013 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 6th floor-demolition & construction of non structural partitions, new suspended ceilings, new light fixtures, doors, frames, millwork & finishes. barrier removal in restrooms. sprinklers, life safety… | $350,000 |
| [201203095720](https://www.permitgraph.org/p/201203095720) | Mar 9, 2012 | Completed: final sign-off Mar 2012 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd floor - add strobes, add horn/strobes. | $5,000 |
| [201202023392](https://www.permitgraph.org/p/201202023392) | Feb 2, 2012 | Completed: final sign-off Mar 2012 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 3rd floor: demolition of extg const. within a 13,633 sq ft suite, in extg 6 story bldg. tenant imp. to be completed under seprate permit. extg interior partitions and partial extg suspended ceiling a… | $6,000 |
| [201202013332](https://www.permitgraph.org/p/201202013332) | Feb 1, 2012 | Completed: final sign-off Mar 2012 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade. relocate 11 pendant sprinkler heads on the 3rd floor. | $5,665 |
| [201201202649](https://www.permitgraph.org/p/201201202649) | Jan 20, 2012 | Never finaled: issued Jan 2012, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | renew for final 200810144111. all work is complete |  |
| [201201192502](https://www.permitgraph.org/p/201201192502) | Jan 19, 2012 | Completed: final sign-off Mar 2012 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 3rd floor tenant improvement to modify offices, conference room, storage on 3rd floor - new partition wall will be constructed. | $352,100 |
| [201105266900](https://www.permitgraph.org/p/201105266900) | May 26, 2011 | Completed: final sign-off Aug 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 4th floor-build wall & door, new carpet & paint. mep including lighting under separate permit. | $95,500 |
| [201105186332](https://www.permitgraph.org/p/201105186332) | May 18, 2011 | Completed: final sign-off Nov 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 4th floor- demo walls, ceiling & lighting in 2 suites, per ab-017 | $9,850 |
| [201011124850](https://www.permitgraph.org/p/201011124850) | Nov 12, 2010 | Completed: final sign-off Feb 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | to erect electric, projecting, double faced sign. install one 24"x24" projecting sign on front facade. | $1,500 |
| [201010143051](https://www.permitgraph.org/p/201010143051) | Oct 14, 2010 | Expired or cancelled: withdrawn Apr 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | to erect electric, wall, single faced sign. revision to pa# 2010/08/10/8507. | $2,500 |
| [201010012039](https://www.permitgraph.org/p/201010012039) | Oct 1, 2010 | Completed: final sign-off Nov 2010 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvements: existing fire sprinkler system; remove -5; add-98; relocate-24; 1st flr | $24,400 |
| [201009241558](https://www.permitgraph.org/p/201009241558) | Sep 24, 2010 | Completed: final sign-off Apr 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | install cooling tower on roof to replace extg. | $138,000 |
| [201008239366](https://www.permitgraph.org/p/201008239366) | Aug 23, 2010 | Completed: final sign-off Jan 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st fl -horn/strobes & strobes added to retail area, pharmacy and other areas. smoke detector provided in receiving area for stroke power supply. duct detectors and relay modules added to havac units… | $8,000 |
| [201008108511](https://www.permitgraph.org/p/201008108511) | Aug 10, 2010 | Expired or cancelled: cancelled Jul 2016 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | install 1 projecting sign (24" x 22") | $2,000 |
| [201008108507](https://www.permitgraph.org/p/201008108507) | Aug 10, 2010 | Completed: final sign-off Mar 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | install 3 wall signs as follows: 2 at 18"x54" ( 7 sf ea) and 1 36" x 25'1" ( 75 ft) | $4,500 |
| [201008058220](https://www.permitgraph.org/p/201008058220) | Aug 5, 2010 | Completed: final sign-off Jan 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | install new shelving in retail space approved under 201003259000 | $15,000 |
| [201003259000](https://www.permitgraph.org/p/201003259000) | Mar 25, 2010 | Completed: final sign-off Jan 2011 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | interior ground floor t.i. to install new partitons, flooring & ceiling, new casework, equipment & finiahes. new lighting & mechanical. no change in occupancy, no exterior alteration. fire protection… | $840,000 |
| [200810144111](https://www.permitgraph.org/p/200810144111) | Oct 14, 2008 | Never finaled: issued Oct 2008, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | elevator recall system for frieght elevator. add new smoke detectors to extg spnkler monitoring system- dedicated system. 9 smoke detectors, 2 relay modules | $5,000 |
| [200806265473](https://www.permitgraph.org/p/200806265473) | Jun 26, 2008 | Completed: final sign-off Sep 2008 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Rudolph Commercial Interiors Inc, Rci](https://www.permitgraph.org/contractor/rudolph-commercial-interiors-inc-rci-645723) | 5th floor: barrier removal - create new unisex restroom, add door frame + hardware & plumbing fixtures. | $25,000 |
| [200806265471](https://www.permitgraph.org/p/200806265471) | Jun 26, 2008 | Completed: final sign-off Sep 2008 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Rudolph Commercial Interiors Inc, Rci](https://www.permitgraph.org/contractor/rudolph-commercial-interiors-inc-rci-645723) | 4th floor: barrier removal, restrooms- new gyp board partition door, frame, hardware, relocate plumbing fixtures. | $30,000 |
| [200806265466](https://www.permitgraph.org/p/200806265466) | Jun 26, 2008 | Completed: final sign-off Oct 2008 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Rudolph Commercial Interiors Inc, Rci](https://www.permitgraph.org/contractor/rudolph-commercial-interiors-inc-rci-645723) | 2nd floor: tenant improvement, barrier removal - restrooms new gyp borad partition, door, frame, hardware. relocate (e) toilet accessories. | $10,000 |
| [200806265475](https://www.permitgraph.org/p/200806265475) | Jun 26, 2008 | Completed: final sign-off Sep 2008 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Rudolph Commercial Interiors Inc, Rci](https://www.permitgraph.org/contractor/rudolph-commercial-interiors-inc-rci-645723) | 6th floor: barrier removal, relocate plumbing fixtures. repair automatic door opener. | $30,000 |
| [200708099311](https://www.permitgraph.org/p/200708099311) | Aug 9, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | resubmit as built for appl#200706154031 |  |
| [200707066071](https://www.permitgraph.org/p/200707066071) | Jul 6, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | 3rd floor-t.i. upgrade of sprinkler system; relocate 32 pendend sprinkler heads. relocate upright coverage 42 relocates in all. | $6,000 |
| [200706154031](https://www.permitgraph.org/p/200706154031) | Jun 15, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire sprinkler control monitoring system, basement, 1,2,3rd flfoors | $2,500 |
| [200706042942](https://www.permitgraph.org/p/200706042942) | Jun 4, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | 3rd floor-demo with interior build deck. new walls, partitions, doors-3rd floor. electrical, hvac & life safety, sprinkler to be on seperate permit | $300,000 |
| [200704068203](https://www.permitgraph.org/p/200704068203) | Apr 6, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | install new fire sprinkler system on 3rd floor of building. 181added heads. | $22,000 |
| [200701242455](https://www.permitgraph.org/p/200701242455) | Jan 24, 2007 | Completed: final sign-off Aug 2007 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | 3rd floor - demo (soft interior) doors & wall, install (n) 1 hour rated full height walls, (n) m & w restrooms. | $190,000 |
| [M39012](https://www.permitgraph.org/p/M39012) | Aug 14, 2006 | Never finaled: issued Aug 2006, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space permit |  |
| [200602104361](https://www.permitgraph.org/p/200602104361) | Feb 10, 2006 | Completed: final sign-off Apr 2006 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Weather Masters Inc.](https://www.permitgraph.org/contractor/weather-masters-inc-758827) | oti-2 2/f me modify (e) duct system for new office configuration.no mechanical equipment to be installed, zone controls per mechanical plans. | $37,000 |
| [200510125325](https://www.permitgraph.org/p/200510125325) | Oct 12, 2005 | Completed: final sign-off May 2006 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | oti-1 2/f el, me | $102,000 |
| [200503147411](https://www.permitgraph.org/p/200503147411) | Mar 14, 2005 | Completed: final sign-off Jun 2005 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | new flooring main lobby upgrades, new flooring & wall finishes, new accessible entry door and store- | $70,000 |
| [200503076926](https://www.permitgraph.org/p/200503076926) | Mar 7, 2005 | Expired or cancelled: expired May 2006 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | remove existing rooftop air handling unit supports &replc w/ new steel platforms.repair exist chille | $15,000 |
| [M31461](https://www.permitgraph.org/p/M31461) | Mar 4, 2005 | Never finaled: issued Mar 2005, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [M30296](https://www.permitgraph.org/p/M30296) | Nov 22, 2004 | Never finaled: issued Nov 2004, no final | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space permit |  |
| [200201308086](https://www.permitgraph.org/p/200201308086) | Jan 30, 2002 | Completed: final sign-off Mar 2002 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Mc Sal Commercial](https://www.permitgraph.org/contractor/mc-sal-commercial-702796) | oti-1,4th floor, el,me | $15,000 |
| [M17518](https://www.permitgraph.org/p/M17518) | Oct 29, 2001 | Expired or cancelled: expired Feb 2002 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | street space |  |
| [200108206462](https://www.permitgraph.org/p/200108206462) | Aug 20, 2001 | Expired or cancelled: expired Jan 2002 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Vahdani Construction Co Inc](https://www.permitgraph.org/contractor/vahdani-construction-co-inc-535077) | revision to pa#99712284/ |  |
| [200105229747](https://www.permitgraph.org/p/200105229747) | May 22, 2001 | Completed: final sign-off Jul 2001 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | repair brick, mortar joints & broken terra cotta on exterior of bldg. paint finish, repair in kind | $95,000 |
| [200101230378](https://www.permitgraph.org/p/200101230378) | Jan 23, 2001 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | new crosswalls for seismic upgrade/1 partition replacement/paint new carpet on 5th floor no mech lig | $30,000 |
| [200011105380](https://www.permitgraph.org/p/200011105380) | Nov 10, 2000 | Completed: final sign-off Jan 2001 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | oti-1 (4th floor) | $65,000 |
| [200011105395](https://www.permitgraph.org/p/200011105395) | Nov 10, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | demolish storage rm walls in bsement install new door levers on all basement doors no structural wor | $8,000 |
| [200010132948](https://www.permitgraph.org/p/200010132948) | Oct 13, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | revision to restroom partition |  |
| [200008309234](https://www.permitgraph.org/p/200008309234) | Aug 30, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ti build out of 5th flr space install new walls,new bar ceilings | $300,000 |
| [200008238634](https://www.permitgraph.org/p/200008238634) | Aug 23, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | structural revision to pa#200007114750 install walls per structal plans/details | $5,000 |
| [200008107526](https://www.permitgraph.org/p/200008107526) | Aug 10, 2000 | Completed: final sign-off Dec 2000 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | remove non-structural partitions @ 5th floor | $15,000 |
| [200007266161](https://www.permitgraph.org/p/200007266161) | Jul 26, 2000 | Completed: final sign-off Dec 2000 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-1 4/f | $20,000 |
| [200007266156](https://www.permitgraph.org/p/200007266156) | Jul 26, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 4/f lighting mechanical | $10,000 |
| [200007114750](https://www.permitgraph.org/p/200007114750) | Jul 11, 2000 | Expired or cancelled: expired Mar 2004 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-1= el & me. 4th fl. only | $70,000 |
| [200003295704](https://www.permitgraph.org/p/200003295704) | Mar 29, 2000 | Expired or cancelled: expired Jul 2000 | [731 Market St](https://www.permitgraph.org/a/3706/062) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | renewal of pa 9815885 |  |
| [200003164543](https://www.permitgraph.org/p/200003164543) | Mar 16, 2000 | Expired or cancelled: expired Sep 2000 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | new walls, relocate lights/fixtures,install elect outlet,1 supply grille,3return grille,minor duct | $15,000 |
| [200003164540](https://www.permitgraph.org/p/200003164540) | Mar 16, 2000 | Completed: final sign-off Jun 2000 | [731 Market St](https://www.permitgraph.org/a/3706/062) |  | oti 1 4th floor, el, me | $65,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (15), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) (14), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (11), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (8), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (6), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (5), [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) (5), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (4), [Rudolph Commercial Interiors Inc, Rci](https://www.permitgraph.org/contractor/rudolph-commercial-interiors-inc-rci-645723) (4), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (2), [Gigabyte Graphics Inc. Dba Fastsigns](https://www.permitgraph.org/contractor/gigabyte-graphics-inc-dba-fastsigns-964587) (2), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) (2), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944), [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065), [Gidel & Kocal Construction Co Inc](https://www.permitgraph.org/contractor/gidel-kocal-construction-co-inc-403050), [Jeffco Roofing Co](https://www.permitgraph.org/contractor/jeffco-roofing-co-455190), [Legacy Mechanical & Energy Services, Inc](https://www.permitgraph.org/contractor/legacy-mechanical-energy-services-inc-808022), [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179), [Mc Sal Commercial](https://www.permitgraph.org/contractor/mc-sal-commercial-702796), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637), [Vahdani Construction Co Inc](https://www.permitgraph.org/contractor/vahdani-construction-co-inc-535077), [Weather Masters Inc.](https://www.permitgraph.org/contractor/weather-masters-inc-758827)
- Architects: [Robbin Mcdonald](https://www.permitgraph.org/professional/robbin-mcdonald-C15157) (5), [Ashley Miller](https://www.permitgraph.org/professional/ashley-miller-C27238) (4), [Michael Castro](https://www.permitgraph.org/professional/michael-castro-C24073) (3), [James Mergens](https://www.permitgraph.org/professional/james-mergens-M25039) (2), [Aston Pereira & Assoc.](https://www.permitgraph.org/professional/aston-pereira-assoc-C12756), [Carolyn Kiernat](https://www.permitgraph.org/professional/carolyn-kiernat-C28638), [George Josephs](https://www.permitgraph.org/professional/george-josephs-31807), [Julia Nelson](https://www.permitgraph.org/professional/julia-nelson-C31838), [Larry Brondah](https://www.permitgraph.org/professional/larry-brondah-C15943), [Michael Zelazek](https://www.permitgraph.org/professional/michael-zelazek-C34048), [Rivera Consulting Group](https://www.permitgraph.org/professional/rivera-consulting-group-2835)
- Engineers: [Alan Wright](https://www.permitgraph.org/professional/alan-wright-M32044), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894), [Andrew Hefner](https://www.permitgraph.org/professional/andrew-hefner-E22638), [Ben Au](https://www.permitgraph.org/professional/ben-au-S4938), [James Bradshaw](https://www.permitgraph.org/professional/james-bradshaw-M34110), [Mansour Firouzian](https://www.permitgraph.org/professional/mansour-firouzian-M26662), [Mozart Faizi](https://www.permitgraph.org/professional/mozart-faizi-E15962), [Rlh Fire Design Rlh Fire Design](https://www.permitgraph.org/professional/rlh-fire-design-rlh-fire-design-777717)
- Authorized agents: [Ross Esfandiari](https://www.permitgraph.org/professional/ross-esfandiari-38098)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3706/062.