# 1160 Mission St #501

Block 3702, lot 061. Page: https://www.permitgraph.org/a/3702/061

- City's use: Single Family Residential
- Built: 2008
- Stories: 1
- Rooms: 2 bedrooms, 2 bathrooms
- Building: 1,184 sq ft
- Zoning: NA
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

22 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202607305858](https://www.permitgraph.org/p/202607305858) | Jul 30, 2026 | In progress: issued Aug 2026 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Terawatt Infrastructure Inc](https://www.permitgraph.org/contractor/terawatt-infrastructure-inc-1113192) | 1st & 2nd: install traffic-calming speed bumps within the existing pakring garage. no structural modifications. within gthe bldg. | $5,000 |
| [202510066788](https://www.permitgraph.org/p/202510066788) | Oct 6, 2025 | Completed: final sign-off Apr 2026 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Anderson Construction Group Inc](https://www.permitgraph.org/contractor/anderson-construction-group-inc-901748) | installation of a draft curtain 18" from ceiling along new ev stalls. ref pa # 2025-0725-1575 | $2,000 |
| [202507251575](https://www.permitgraph.org/p/202507251575) | Jul 25, 2025 | In progress: issued Oct 2025 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | modify fire sprinklers and piping at level p1 and level p2 due to new electrical vehicle charging stations. includes ab-005 dated 3/13/24. p1= 34 sprinklers, p2= 10 sprinklers. ref pa #202507070300 &… | $22,000 |
| [202507070300](https://www.permitgraph.org/p/202507070300) | Jul 7, 2025 | Completed: final sign-off May 2026 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Barry Mc Graw Electric](https://www.permitgraph.org/contractor/barry-mc-graw-electric-887811) | garage: relocation of 4 existing evcs in existing parking garage with dedicated fleet vehicle charging stations per pc motion no. 21301 and bos motion no. m23-076. ref pa #202307202607,202308104182 |  |
| [202504033628](https://www.permitgraph.org/p/202504033628) | Apr 3, 2025 | Completed: final sign-off Jul 2025 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | 1st floor. fire only work to "verify (e) sound levels in sleeping areas, complying with sffc section 1103.7.6.1" no ref permit app# |  |
| [202409100435](https://www.permitgraph.org/p/202409100435) | Sep 10, 2024 | In progress: filed Sep 2024, not yet issued | [1160 Mission St](https://www.permitgraph.org/a/3702/061) |  | permit to document flammable materal storage cabinet with 3 55 gallon flammable drumm storage for iso propolyl alcholol 20% for tenant waymo ref 202308104182 |  |
| [202409060218](https://www.permitgraph.org/p/202409060218) | Sep 6, 2024 | In progress: issued Sep 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | as built for pa# 202408138545. |  |
| [202408138545](https://www.permitgraph.org/p/202408138545) | Aug 13, 2024 | Completed: final sign-off Sep 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | add 3 plug 1 upright fire sprinklers for ti. no underground work ref pa 202406144545 | $6,300 |
| [202406144545](https://www.permitgraph.org/p/202406144545) | Jun 14, 2024 | Completed: final sign-off Sep 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Anderson Construction Group Inc](https://www.permitgraph.org/contractor/anderson-construction-group-inc-901748) | revise pa 202308104182 to show minor revisions to break room mep and small appliances; revise vehicle parking barrier |  |
| [202404099654](https://www.permitgraph.org/p/202404099654) | Apr 15, 2024 | In progress: issued Apr 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | parking garage: modify fire sprinklers at levels p1 and p2 due to new electric vehicle charging stations only, includes sffd ab-005 dated 3/13/24. ref pa# 202307202607 and 202308104182. | $122,500 |
| [202401184160](https://www.permitgraph.org/p/202401184160) | Jan 18, 2024 | Completed: final sign-off Mar 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Rrs Fire Alarm Inc Dba California Fire D](https://www.permitgraph.org/contractor/rrs-fire-alarm-inc-dba-california-fire-d-1046925) | relocaton of an (e) smoke detector and installation of two new speakers strobes | $8,450 |
| [202312112269](https://www.permitgraph.org/p/202312112269) | Dec 11, 2023 | Completed: final sign-off Feb 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | garage lvl: relocate and replace/ add 3 fire sprinklers for ti, no underground work, ref pa# 202308104182. | $8,800 |
| [202308104182](https://www.permitgraph.org/p/202308104182) | Aug 10, 2023 | Completed: final sign-off Sep 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Anderson Construction Group Inc](https://www.permitgraph.org/contractor/anderson-construction-group-inc-901748) | t.i. on 1st/fl of parking gargae: new owner's office, tenant breakfast rm, mdf rm, bicycle storage, new acceesible bathroom | $165,000 |
| [202307202607](https://www.permitgraph.org/p/202307202607) | Jul 20, 2023 | Completed: final sign-off Sep 2024 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Barry Mc Graw Electric](https://www.permitgraph.org/contractor/barry-mc-graw-electric-887811) | document change of use from public parking garage to fleet charging for portions of (e) public/private parking garage as approved by cpc through motion #21301 & bos motion #m23-076. no change of occu… | $1,700,000 |
| [202306089611](https://www.permitgraph.org/p/202306089611) | Jun 8, 2023 | Never finaled: issued Jun 2023, no final | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Barry Mc Graw Electric](https://www.permitgraph.org/contractor/barry-mc-graw-electric-887811) | temporary installation of (1) evse for testiing to confirm future installation (1) 225 amp feeder, 1 receptacle ev changer |  |
| [202112154442](https://www.permitgraph.org/p/202112154442) | Dec 15, 2021 | Completed: final sign-off Mar 2022 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | rooftop: furnish & install 2 heat pumps, 2 indoor fan coil units. two outfoor condesners units. | $82,000 |
| [201912179802](https://www.permitgraph.org/p/201912179802) | Dec 17, 2019 | Completed: final sign-off Jun 2020 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Campbell Family Electric Inc](https://www.permitgraph.org/contractor/campbell-family-electric-inc-876689) | install (2) l3 vehicle charging stations | $48,000 |
| [201902062285](https://www.permitgraph.org/p/201902062285) | Feb 6, 2019 | Never finaled: issued Feb 2019, no final | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Campbell Family Electric Inc](https://www.permitgraph.org/contractor/campbell-family-electric-inc-876689) | install 10 electric vehicle charger and equipment | $115,000 |
| [201709259426](https://www.permitgraph.org/p/201709259426) | Sep 25, 2017 | Completed: final sign-off Jan 2018 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | electric wall sign maher not req | $5,000 |
| [201709259428](https://www.permitgraph.org/p/201709259428) | Sep 25, 2017 | Completed: final sign-off Jan 2018 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | electric projecting sign maher not req | $5,000 |
| [201507131269](https://www.permitgraph.org/p/201507131269) | Jul 13, 2015 | Completed: final sign-off Aug 2016 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) | [Alpha Restoration & Wateproof](https://www.permitgraph.org/contractor/alpha-restoration-wateproof-496117) | various floors: caulking repairs, recoating water tables & balcony decks, podium level @ 5th floor water proofing at base of building & under the store front windows. n/a maher ordinance | $400,000 |
| [200907243430](https://www.permitgraph.org/p/200907243430) | Jul 24, 2009 | Completed: final sign-off Nov 2009 | [1160 Mission St](https://www.permitgraph.org/a/3702/061) |  | construct 2 wind screens to mitigate wind on 5th fl podium. deck spa windscreen to be 8 ft in height. extend (e) windscreen at bbq area | $12,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Anderson Construction Group Inc](https://www.permitgraph.org/contractor/anderson-construction-group-inc-901748) (3), [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) (3), [Barry Mc Graw Electric](https://www.permitgraph.org/contractor/barry-mc-graw-electric-887811) (3), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (2), [Campbell Family Electric Inc](https://www.permitgraph.org/contractor/campbell-family-electric-inc-876689) (2), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Alpha Restoration & Wateproof](https://www.permitgraph.org/contractor/alpha-restoration-wateproof-496117), [Rrs Fire Alarm Inc Dba California Fire D](https://www.permitgraph.org/contractor/rrs-fire-alarm-inc-dba-california-fire-d-1046925), [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796), [Terawatt Infrastructure Inc](https://www.permitgraph.org/contractor/terawatt-infrastructure-inc-1113192)
- Architects: [Guion Chilldress](https://www.permitgraph.org/professional/guion-chilldress-C39053) (3), [Brandon Carson](https://www.permitgraph.org/professional/brandon-carson-92398), [Brent Allen Kelley](https://www.permitgraph.org/professional/brent-allen-kelley-C29540), [Nadia Anis](https://www.permitgraph.org/professional/nadia-anis-C23527)
- Engineers: [Joseph Nunneley](https://www.permitgraph.org/professional/joseph-nunneley-S6777) (3), [Armahn Soltani-Ghasemi](https://www.permitgraph.org/professional/armahn-soltani-ghasemi-41409), [Christopher Lee](https://www.permitgraph.org/professional/christopher-lee-E18921), [John Bachoua](https://www.permitgraph.org/professional/john-bachoua-19677), [Joseph D Bradshaw](https://www.permitgraph.org/professional/joseph-d-bradshaw-C21202), [Joseph Paul Nelson](https://www.permitgraph.org/professional/joseph-paul-nelson-E23170)
- Designers: [Ronald Demartini](https://www.permitgraph.org/professional/ronald-demartini-758796)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3702/061.