# 1155 Market St

Block 3702, lot 054. Page: https://www.permitgraph.org/a/3702/054

The city's assessor roll has no record for this parcel.

## Permits filed here

90 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201604154938](https://www.permitgraph.org/p/201604154938) | Apr 15, 2016 | Completed: final sign-off May 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | 10th & 11th flrs: new kitchen & fire suppression system (pyro-chem), install of tanks, pull station, detection, piping & gas valve. ref. t.i. permit #2015-0702-0526 | $4,995 |
| [201603172347](https://www.permitgraph.org/p/201603172347) | Mar 17, 2016 | Completed: final sign-off May 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 10th & 11th floors: new fire alarm - 2 power supplies, 61 modules, 50 detectors, 2 speakers, 81 speaker/strobes. ref pa 2015 0702 0526 | $24,430 |
| [M669427](https://www.permitgraph.org/p/M669427) | Mar 4, 2016 | Never finaled: issued Mar 2016, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space permit |  |
| [M662487](https://www.permitgraph.org/p/M662487) | Feb 10, 2016 | Never finaled: issued Feb 2016, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space |  |
| [201602109243](https://www.permitgraph.org/p/201602109243) | Feb 10, 2016 | Completed: final sign-off Apr 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | ground floor: revision to existing permit 2015-0528-7397, revise drawings to reflect existing conditions. existing non-rated full height partition. |  |
| [201512225691](https://www.permitgraph.org/p/201512225691) | Dec 22, 2015 | Completed: final sign-off Dec 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | 10th & 11th floors: fire sprinkler permit. relocate 230, add 65 & delete 52 pendents. relocate 6 and add 6 uprights. add 1 new fire hose valve on the 11th floor. t.i. #201507020526. | $83,907 |
| [201512225693](https://www.permitgraph.org/p/201512225693) | Dec 22, 2015 | Completed: final sign-off Jun 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | floors 10 & 11 - lighting revision to pa #201507020526. |  |
| [201511233290](https://www.permitgraph.org/p/201511233290) | Nov 23, 2015 | Completed: final sign-off Jun 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | 9th floor: modification to permit 2015-0728-2625. add 2 hr corridor and associated mechanical revisions. increase lighting levels with request for special accomodations |  |
| [201511233291](https://www.permitgraph.org/p/201511233291) | Nov 23, 2015 | Completed: final sign-off Jun 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | 9th floor: modification to pa 2015-0319-1356, add 2 hr corridor. remove floor strengthening from scope of work. |  |
| [201511062022](https://www.permitgraph.org/p/201511062022) | Nov 6, 2015 | Completed: final sign-off Jun 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | fire sprinkler, relocate 108, add 37 and delete 21 pendents; relocate 2 uprights on the 9th fl. draft stop for stair by others. | $29,400 |
| [201510230666](https://www.permitgraph.org/p/201510230666) | Oct 23, 2015 | Completed: final sign-off May 2016 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 9th floor new fire alarm devices for a t.i, in an existing bldg to include: (12) relay modules, (29) smoke detectors, (2) duct detectors, (5) speakers, (43) speaker/strobes. ref pa #201503191356. | $29,400 |
| [201509258047](https://www.permitgraph.org/p/201509258047) | Sep 25, 2015 | Never finaled: issued Feb 2016, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | lighting, electrical and plumbing for office and restroom under permit 2015-0528-7397 | $11,951 |
| [201508043303](https://www.permitgraph.org/p/201508043303) | Aug 4, 2015 | Never finaled: issued Aug 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | new fire alarm appliances added to tenant improvment in an existing bldg to include: (2)speakers/strobes. 1st fl: ref pa# 201505287397 | $3,000 |
| [201507282625](https://www.permitgraph.org/p/201507282625) | Jul 28, 2015 | Completed: final sign-off Aug 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal. | $455,800 |
| [201507222138](https://www.permitgraph.org/p/201507222138) | Jul 22, 2015 | Never finaled: issued Jul 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | fire sprinkler permit. relocate 4 and delete 1 pendent on 1st fl | $2,056 |
| [201507020526](https://www.permitgraph.org/p/201507020526) | Jul 2, 2015 | Completed: final sign-off Aug 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, ele… | $2,395,639 |
| [201506179154](https://www.permitgraph.org/p/201506179154) | Jun 17, 2015 | Never finaled: issued Jul 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | revision (adjustment) to pa #201502128172 for structural drwgs to support previous submittal (replacement of existing glass guardrail at the 6th & 7th floor balcony tenant space). installation of new… | $15,000 |
| [201505287397](https://www.permitgraph.org/p/201505287397) | May 28, 2015 | Never finaled: issued Jul 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | ground floor: non structural demo - new non structural partitions,, lighting, electrical, plumbing, finishes and millwork. | $32,400 |
| [201503191356](https://www.permitgraph.org/p/201503191356) | Mar 19, 2015 | Completed: final sign-off Jun 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | 9th flr: ti - new partitions, finishes and fixtures throughout. mech, ele, plum, life safety and sprinkler as deffered submittal | $732,016 |
| [201503120588](https://www.permitgraph.org/p/201503120588) | Mar 12, 2015 | Completed: final sign-off Jun 2017 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) | floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire supp… | $120,000 |
| [M561887](https://www.permitgraph.org/p/M561887) | Feb 23, 2015 | Never finaled: issued Feb 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space permit |  |
| [201502128172](https://www.permitgraph.org/p/201502128172) | Feb 12, 2015 | Never finaled: issued Feb 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | 6th flr: replacement of existing glass guard rail at the 6th flr, covered balcony tenant space (non public) | $50,000 |
| [201502128159](https://www.permitgraph.org/p/201502128159) | Feb 12, 2015 | Never finaled: issued Feb 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | t-24 for t.i. to office space, work consists of connecting power to new or relocated light fixtures, power outlets & tenant equipment, all work consists of making connection to base bldg. (e) panels,… | $185,000 |
| [201502047451](https://www.permitgraph.org/p/201502047451) | Feb 4, 2015 | Never finaled: issued Feb 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 6th flr: fire sprinkler t.i. change/relocate 87, add 5 total 92; ref to 201412194161 (permit pending issuance). | $47,345 |
| [201502027236](https://www.permitgraph.org/p/201502027236) | Feb 2, 2015 | Completed: final sign-off Mar 2015 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th floor: 2 new fire alarm devices added to tenant improvement to an existing bldg to include: (2) speaker/strobes. ref pa #201412194161. | $3,200 |
| [M552947](https://www.permitgraph.org/p/M552947) | Jan 23, 2015 | Never finaled: issued Jan 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space permit |  |
| [M545067](https://www.permitgraph.org/p/M545067) | Dec 23, 2014 | Never finaled: issued Dec 2014, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space |  |
| [201412194161](https://www.permitgraph.org/p/201412194161) | Dec 19, 2014 | Completed: final sign-off Apr 2015 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | 6th floor tenant improvement to existing office space. new non-structural interior partitions, electrical outlets, lighting, restroom accessibility upgrades. life safety deferred. | $950,000 |
| [201410290249](https://www.permitgraph.org/p/201410290249) | Oct 29, 2014 | Never finaled: issued Feb 2015, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | 6th flr: demolition of existing interior partitions & finishes, electrical outlets, lighting, restroom fixtures. per ab-17 accessibility documentation will be provied with tenant improvement applicat… | $25,000 |
| [201404304610](https://www.permitgraph.org/p/201404304610) | Apr 30, 2014 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | rervision to pa#2012-1120-4569 & ab-056. relocated ada van parking at 1160 mission (soma grand) 20 ft approx. north. updated path of travel from parking to 1155 market. new white curb shown at steven… |  |
| [M473187](https://www.permitgraph.org/p/M473187) | Mar 21, 2014 | Never finaled: issued Mar 2014, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space |  |
| [201401236936](https://www.permitgraph.org/p/201401236936) | Jan 23, 2014 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | lobby renovation t.i. to (e) bldg. all core bldg fire alarm components are existing to remain, unless otherwise specified in this sumittal, (1) remote annunicator, (1) speaker/strobe. ref pa #2013.02… | $5,000 |
| [201401075747](https://www.permitgraph.org/p/201401075747) | Jan 7, 2014 | Expired or cancelled: cancelled Jan 2026 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | revision to pa#2013-02-13-0143. revised work includes art wall, in lieu of lightboxes, new lighting, design, demo of (e) cafe & dimentional change to exterior glazing & structural update to canopy de… |  |
| [201312194663](https://www.permitgraph.org/p/201312194663) | Dec 19, 2013 | Never finaled: issued Jan 2014, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | roof mechanical and piping upgrades. fire alarm and fire sprinkler under seperate permit | $200,000 |
| [201312194574](https://www.permitgraph.org/p/201312194574) | Dec 19, 2013 | Never finaled: issued Dec 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | interior lobby renovation. reception desk. building entry renovation. electrical only. approved ti 201302130143 |  |
| [201312053431](https://www.permitgraph.org/p/201312053431) | Dec 5, 2013 | Never finaled: issued Dec 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 1st floor lobby. relocate (17) sprinkler heads. | $8,500 |
| [201311262911](https://www.permitgraph.org/p/201311262911) | Nov 26, 2013 | Never finaled: issued Nov 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | 1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147 | $40,000 |
| [M443227](https://www.permitgraph.org/p/M443227) | Nov 12, 2013 | Never finaled: issued Nov 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space permit only. |  |
| [201308124100](https://www.permitgraph.org/p/201308124100) | Aug 12, 2013 | Expired or cancelled: cancelled Jan 2026 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | 6, 10 & 11 floors - barrier removal accessiblity upgrades to restrooms and elev. lobbies floors 6,10,&11. mep and fire safety under seperate permit. | $480,000 |
| [201307292983](https://www.permitgraph.org/p/201307292983) | Jul 29, 2013 | Never finaled: issued Jul 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | add 2 sprinkler heads at 12th floor. generator room. | $1,000 |
| [201303293350](https://www.permitgraph.org/p/201303293350) | Mar 29, 2013 | Never finaled: issued Aug 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | install fuel fill port at street with double-walled fuel pipe to extg generator on roof. installing new 75 gallon tank at generator to replace old tank which will be abandoned in place. | $45,000 |
| [201302130143](https://www.permitgraph.org/p/201302130143) | Feb 13, 2013 | Never finaled: issued Oct 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | interior lobby:ceiling, feature wall, reception desk. exterior work: demolition of exterior wall & entry on level 1. intallation on nw wll as noted, nw glazing on level 2. nw canopy, miscelanious wor… | $1,600,000 |
| [201301228438](https://www.permitgraph.org/p/201301228438) | Jan 22, 2013 | Completed: final sign-off Apr 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | basement & 5th floor-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa's# 2012-1126-4818 & 2012-1133-5206 | $5,000 |
| [201301228441](https://www.permitgraph.org/p/201301228441) | Jan 22, 2013 | Completed: final sign-off Apr 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 7th/8th/9th floors-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa #2012-1126-4817 | $5,500 |
| [201301178202](https://www.permitgraph.org/p/201301178202) | Jan 17, 2013 | Completed: final sign-off Apr 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | replace (e) fire alarm system per the scope of work on drawing. | $90,000 |
| [201301157962](https://www.permitgraph.org/p/201301157962) | Jan 15, 2013 | Never finaled: issued Jan 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | floors 5,7, & 8 - a total of (10) relcoated sprinklers, (7) added sprinklers. ref #2012.1.26.4817 & 2012.11.26.4818. | $8,500 |
| [201301107633](https://www.permitgraph.org/p/201301107633) | Jan 10, 2013 | Never finaled: issued Jan 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fire sprinklers flors 1 and 3: 18 relocates, 9 added | $15,000 |
| [201301087478](https://www.permitgraph.org/p/201301087478) | Jan 8, 2013 | Never finaled: issued Jan 2013, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | on floors 2 and 4 a total of 14 relocated sprinklers and 5 added sprinklers. ti app#201211264820/4818 | $9,500 |
| [201301087459](https://www.permitgraph.org/p/201301087459) | Jan 8, 2013 | Completed: final sign-off Apr 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | ti pa# 2012-11-33-5206 & 2012-11-26-4820. add (n) speaker, 3 strobes throughout tenant areas. | $6,000 |
| [201301077337](https://www.permitgraph.org/p/201301077337) | Jan 7, 2013 | Completed: final sign-off Apr 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add new strobes and speakers. repalce all strobes in tenant area. ref#201211264820/4818 | $7,000 |
| [201212115886](https://www.permitgraph.org/p/201212115886) | Dec 11, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $100,000 |
| [201212115884](https://www.permitgraph.org/p/201212115884) | Dec 11, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 2 & 3. ref arch pa #201211264820 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $110,000 |
| [201212115888](https://www.permitgraph.org/p/201212115888) | Dec 11, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 7,8 & 9. ref arch pa #201211264817 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $175,000 |
| [201212115887](https://www.permitgraph.org/p/201212115887) | Dec 11, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | mechanical ductwork & plumbing, electrical power & lighting and plumbing upgrade to floor 4 & 5. ref arch pa #201211264818 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $110,000 |
| [201212045425](https://www.permitgraph.org/p/201212045425) | Dec 4, 2012 | Never finaled: issued Dec 2012, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | revisison to pa#2012-11-20-4569 & 2012-11-30-5206. bsmt & 1st fl. structural work including slab cuts at ground fl & bsmt, curb cut & move in bsmt, ramp alteration in bsmt, platform @ 2nd exit for ne… | $10,000 |
| [M360287](https://www.permitgraph.org/p/M360287) | Nov 30, 2012 | Never finaled: issued Nov 2012, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | street space |  |
| [201211305206](https://www.permitgraph.org/p/201211305206) | Nov 30, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | basement & 1st floor-interior tenant improvement & minor demolition in basement & ground floor (1st fl). m.e.p is not included & is design build. accessibility is not addressed & can be referenced un… | $14,032 |
| [201211264820](https://www.permitgraph.org/p/201211264820) | Nov 26, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | tenant improvement of floor 2 and 3. base bldg accessibility under separate permit. mep and fire protection under separate permit | $585,775 |
| [201211264818](https://www.permitgraph.org/p/201211264818) | Nov 26, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | 4th & 5th floors-tenant improvement of floor 4 and 5. base bldg accessibility under 201211204569. mep and fire protection under separate permit | $770,000 |
| [201211264817](https://www.permitgraph.org/p/201211264817) | Nov 26, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | floors 7,8,9 tenant improvement - (base bldg accessibility work ab-056 under appl# 2012.11.20.4569) includes restroom, elev lobbies, elev cabs, path of travel, drinking fountains, parking entrance. m… | $827,323 |
| [201211204569](https://www.permitgraph.org/p/201211204569) | Nov 20, 2012 | Completed: final sign-off May 2014 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) | base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors… | $500,000 |
| [200911171371](https://www.permitgraph.org/p/200911171371) | Nov 17, 2009 | Completed: final sign-off Nov 2010 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195) | install a new cooling tower (100 ton). for (e) water source air conditioning units in the building. | $85,000 |
| [200705030370](https://www.permitgraph.org/p/200705030370) | May 3, 2007 | Completed: final sign-off Jul 2007 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | legalize existing atm located at front of property line in response to nov complaint #200790110. | $2,000 |
| [200702053367](https://www.permitgraph.org/p/200702053367) | Feb 5, 2007 | Completed: final sign-off Aug 2007 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate (6) fire sprinklers on the 6th floor only. | $1,950 |
| [200611308808](https://www.permitgraph.org/p/200611308808) | Nov 30, 2006 | Completed: final sign-off Aug 2007 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) | at the 6th floor, construction of 6 new offices, remodel of extg storate room and extg copy room. sprnklr to be submitted on separate permit | $107,000 |
| [200509284183](https://www.permitgraph.org/p/200509284183) | Sep 28, 2005 | Never finaled: issued Sep 2005, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | renew appl#200303119387,200307018480,200304112032,200306207329 for final inspection |  |
| [200509284180](https://www.permitgraph.org/p/200509284180) | Sep 28, 2005 | Never finaled: issued Sep 2005, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | mep/lighting/life safety. relocate 3 strobes | $8,000 |
| [200509284175](https://www.permitgraph.org/p/200509284175) | Sep 28, 2005 | Never finaled: issued Sep 2005, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | mep & lighting & sprinkler piping plan per appl#200306207329 | $7,000 |
| [200507077040](https://www.permitgraph.org/p/200507077040) | Jul 7, 2005 | Never finaled: issued Jul 2005, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621) | relocate 3 pendant fire sprinkler heads at 7th floor | $3,000 |
| [200505102018](https://www.permitgraph.org/p/200505102018) | May 10, 2005 | Never finaled: issued May 2005, no final | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) | oti-1,7th/fl-el,sp. |  |
| [200402257177](https://www.permitgraph.org/p/200402257177) | Feb 25, 2004 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | card access doors being added on 4th, 5th, 7th, and 8th. intergrates with fire system per cbc 403.9 |  |
| [200307240247](https://www.permitgraph.org/p/200307240247) | Jul 24, 2003 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [California Suppresion Dba Calif. Protect](https://www.permitgraph.org/contractor/california-suppresion-dba-calif-protect-327196) | furnish and install new fm200 fire suppression system for the expansion in the 10th floor main frame | $16,935 |
| [200307018480](https://www.permitgraph.org/p/200307018480) | Jul 1, 2003 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | oti-1 1/f el ls | $88,417 |
| [200306207329](https://www.permitgraph.org/p/200306207329) | Jun 20, 2003 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | oti-1 10th floor el | $91,309 |
| [200304112032](https://www.permitgraph.org/p/200304112032) | Apr 11, 2003 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | t.i to exsting office space barrier removal project. add drinking foundation, lower urinal, ada sign | $92,750 |
| [200303119387](https://www.permitgraph.org/p/200303119387) | Mar 11, 2003 | Expired or cancelled: expired Sep 2005 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | tenant improvement to extg office space/remove 2 walls/1 between conf. room/2nd wall to remove egres | $95,000 |
| [200202219647](https://www.permitgraph.org/p/200202219647) | Feb 21, 2002 | Expired or cancelled: expired Sep 2002 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-2 7th floor el | $12,000 |
| [200110049926](https://www.permitgraph.org/p/200110049926) | Oct 4, 2001 | Expired or cancelled: expired Apr 2002 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1,7th fl,ltg only | $10,000 |
| [200110049922](https://www.permitgraph.org/p/200110049922) | Oct 4, 2001 | Expired or cancelled: expired Feb 2002 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 8th floor no oti-2 | $2,000 |
| [200110049924](https://www.permitgraph.org/p/200110049924) | Oct 4, 2001 | Expired or cancelled: expired Feb 2002 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 5th floor no oti-2 | $2,500 |
| [200011024737](https://www.permitgraph.org/p/200011024737) | Nov 2, 2000 | Expired or cancelled: expired May 2001 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | build new offices/relocate light fixtures/add new elec. outlet | $20,000 |
| [200008258891](https://www.permitgraph.org/p/200008258891) | Aug 25, 2000 | Expired or cancelled: expired Dec 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | as built drawings from app #200008087290/fire sprnklr 7th floor |  |
| [200008087290](https://www.permitgraph.org/p/200008087290) | Aug 8, 2000 | Expired or cancelled: expired Dec 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) | add 4 and relocate 1 head on fire sprinkler system | $1,000 |
| [200007195529](https://www.permitgraph.org/p/200007195529) | Jul 19, 2000 | Expired or cancelled: expired Aug 2001 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Gateway Construction Service](https://www.permitgraph.org/contractor/gateway-construction-service-565763) | minor demolition/upgrade walls/fm-200 on 10th floor | $80,000 |
| [200007114760](https://www.permitgraph.org/p/200007114760) | Jul 11, 2000 | Expired or cancelled: expired Aug 2001 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 = el, me, ls & sp (7th fl.) | $65,000 |
| [200007054320](https://www.permitgraph.org/p/200007054320) | Jul 5, 2000 | Expired or cancelled: expired Nov 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | oti-3, 2nd floor, l/s only |  |
| [200003305818](https://www.permitgraph.org/p/200003305818) | Mar 30, 2000 | Expired or cancelled: expired Sep 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) | [Honeywell](https://www.permitgraph.org/contractor/honeywell-52926) | release lobby & stairwell locked doors for fire alarm. | $11,838 |
| [200002141839](https://www.permitgraph.org/p/200002141839) | Feb 14, 2000 | Expired or cancelled: expired Nov 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | install control cabinet, antennae, for wireless transmission facility | $15,655 |
| [20000128485](https://www.permitgraph.org/p/20000128485) | Jan 28, 2000 | Completed: final sign-off Jul 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | oti-3, ls, sp, 2nd floor | $14,000 |
| [20000121661](https://www.permitgraph.org/p/20000121661) | Jan 21, 2000 | Completed: final sign-off Jul 2000 | [1155 Market St](https://www.permitgraph.org/a/3702/054) |  | oti-2, el, me, 2nd floor | $120,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Truebeck Construction](https://www.permitgraph.org/contractor/truebeck-construction-903798) (13), [Dpr Construction](https://www.permitgraph.org/contractor/dpr-construction-953749) (11), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (10), [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) (8), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (5), [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) (3), [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) (2), [Aquamatic Fire Protection](https://www.permitgraph.org/contractor/aquamatic-fire-protection-669521) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195), [California Suppresion Dba Calif. Protect](https://www.permitgraph.org/contractor/california-suppresion-dba-calif-protect-327196), [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779), [Gateway Construction Service](https://www.permitgraph.org/contractor/gateway-construction-service-565763), [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664), [Honeywell](https://www.permitgraph.org/contractor/honeywell-52926), [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241)
- Architects: [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223) (5), [Mark Cavagnero](https://www.permitgraph.org/professional/mark-cavagnero-C19521) (4), [Brynda Kirt](https://www.permitgraph.org/professional/brynda-kirt-C8880) (2), [Gary Hoy](https://www.permitgraph.org/professional/gary-hoy-C15679), [Mike Pierrom](https://www.permitgraph.org/professional/mike-pierrom-C12859)
- Engineers: [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828) (5), [Dennis Chung](https://www.permitgraph.org/professional/dennis-chung-9279) (2), [Joshua Mcmahan](https://www.permitgraph.org/professional/joshua-mcmahan-E18209) (2), [Albert Eng](https://www.permitgraph.org/professional/albert-eng-M25966), [Elisabeth Allen](https://www.permitgraph.org/professional/elisabeth-allen-E17659), [Guil Orihuela](https://www.permitgraph.org/professional/guil-orihuela-M31230), [Jesus Cabellon Jr.](https://www.permitgraph.org/professional/jesus-cabellon-jr-E9278), [Jonathan Jaeger](https://www.permitgraph.org/professional/jonathan-jaeger-C12815), [Pak Hui](https://www.permitgraph.org/professional/pak-hui-S5227)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3702/054.