# 750 Guerrero St

Block 3598, lot 004. Page: https://www.permitgraph.org/a/3598/004

- City's use: Multi-Family Residential
- Built: 1908
- Stories: 3
- Units: 12
- Rooms: 12 bedrooms, 12 bathrooms
- Building: 10,215 sq ft
- Lot: 3,914 sq ft
- Zoning: RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

7 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202601023159](https://www.permitgraph.org/p/202601023159) | Jan 2, 2026 | Completed: final sign-off Jan 2026 | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Rain Defense](https://www.permitgraph.org/contractor/rain-defense-884246) | (e) roof membrane shall be removed/disposed of. mechanically fasten a #28 fiberglass base sheet to the roof deck w/1-1/4" square head nails. replace all drip edge metal, install new roof scuppers at… | $25,933 |
| [202208090148](https://www.permitgraph.org/p/202208090148) | Aug 9, 2022 | Completed: final sign-off May 2023 | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Halyard Inc](https://www.permitgraph.org/contractor/halyard-inc-1049217) | liike for like replacement and 2023 mandate installation of fire alarm system in non sprinkler building to comply with 1103.7.61. | $4,000 |
| [201409257338](https://www.permitgraph.org/p/201409257338) | Sep 25, 2014 | Completed: final sign-off Oct 2014 | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Triton Construction](https://www.permitgraph.org/contractor/triton-construction-693807) | revision to app. 201408224509, match retrofit to same as other wall/side shearwall, no brackets/metal); maher n/a |  |
| [201408224509](https://www.permitgraph.org/p/201408224509) | Aug 22, 2014 | Completed: final sign-off Jul 2019 | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Triton Construction](https://www.permitgraph.org/contractor/triton-construction-693807) | the scope of work is limited to the seismic retrofit of the buildings crawl space cripple wall bracing by adding plywood and framing connectors. no exterior alterations; maher n/a; soft story retrofi… | $25,000 |
| [201207195204](https://www.permitgraph.org/p/201207195204) | Jul 19, 2012 | Never finaled: issued Jul 2012, no final | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Triton Construction](https://www.permitgraph.org/contractor/triton-construction-693807) | work in unit #6: relocate water heater and gas for range. add more electrical outlets. kitchen remodel. | $5,000 |
| [M216289](https://www.permitgraph.org/p/M216289) | Aug 17, 2010 | Never finaled: issued Aug 2010, no final | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) |  | street space permit |  |
| [201005041726](https://www.permitgraph.org/p/201005041726) | May 4, 2010 | Completed: final sign-off Jan 2011 | [750 Guerrero St](https://www.permitgraph.org/a/3598/004) | [Ward-Tek Inc.](https://www.permitgraph.org/contractor/ward-tek-inc-458614) | fire damage project. replace all interior plaster. replace kitchen cabinets. all flooring and paint. no framing. comply with mandatory measures. | $30,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Triton Construction](https://www.permitgraph.org/contractor/triton-construction-693807) (3), [Halyard Inc](https://www.permitgraph.org/contractor/halyard-inc-1049217), [Rain Defense](https://www.permitgraph.org/contractor/rain-defense-884246), [Ward-Tek Inc.](https://www.permitgraph.org/contractor/ward-tek-inc-458614)
- Engineers: [Andrew C. Radovan](https://www.permitgraph.org/professional/andrew-c-radovan-C55138)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3598/004.
