# 2300 Harrison St

Block 3593, lot 001. Page: https://www.permitgraph.org/a/3593/001

- City's use: Commercial Office
- Built: 1913
- Stories: 3
- Building: 82,097 sq ft
- Lot: 38,676 sq ft
- Zoning: M1
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

42 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202605151347](https://www.permitgraph.org/p/202605151347) | May 15, 2026 | Completed: final sign-off Jun 2026 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | 2/f: restroom exhaust fan, ductwork, and outlets. one vav box relocation. ref permit 202604139302 | $15,000 |
| [202604139302](https://www.permitgraph.org/p/202604139302) | Apr 13, 2026 | Completed: final sign-off Jul 2026 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | new gender neutral resterooms - demo, new partitions, ceilings, and finishes. | $35,000 |
| [202512302967](https://www.permitgraph.org/p/202512302967) | Dec 30, 2025 | Completed: final sign-off Jun 2026 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 12 ev chargers to be instal at (e) parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in s… | $100,000 |
| [202312062035](https://www.permitgraph.org/p/202312062035) | Dec 6, 2023 | Completed: final sign-off Jul 2024 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | fire alarm t.i. on roof level add 1 weather proof horn/strobe. ref ti pa 202309126396 | $800 |
| [202311211220](https://www.permitgraph.org/p/202311211220) | Nov 21, 2023 | Completed: final sign-off Sep 2024 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | rooftop: install (n) trellis shade structure. | $195,000 |
| [202309126396](https://www.permitgraph.org/p/202309126396) | Sep 12, 2023 | Completed: final sign-off Oct 2024 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility | $600,000 |
| [202308094044](https://www.permitgraph.org/p/202308094044) | Aug 9, 2023 | Completed: final sign-off Oct 2023 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3/f: electrical work for tenant improvement, ref pa# 202306099685. | $12,000 |
| [202306099685](https://www.permitgraph.org/p/202306099685) | Jun 9, 2023 | Completed: final sign-off Oct 2023 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3/f: mods of (e) t.i. to include selectrive partial demolition on non-load bearing partitions and addition of new glazing and framings, new door, frames and finishes. | $182,830 |
| [202305037013](https://www.permitgraph.org/p/202305037013) | May 3, 2023 | Completed: final sign-off Aug 2023 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | remove (e) tar and gravel. existing roof membrane to remain. install one layer of 2" iso insulation and siplast modified bitumen roof system. existing roof has r-19 insulation - add minimum r-10 insu… | $698,926 |
| [202207128272](https://www.permitgraph.org/p/202207128272) | Jul 12, 2022 | Never finaled: issued Jul 2022, no final | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | ref pa 202204182383 1st floor ti (13) ceiling horn/strobes (17) ceiling strobes. | $20,000 |
| [202206287239](https://www.permitgraph.org/p/202206287239) | Jun 28, 2022 | Completed: final sign-off Oct 2022 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite 100 & 150: mechanical for t.i. mechanical and electrical. ref app#202204182383 | $25,000 |
| [202206025457](https://www.permitgraph.org/p/202206025457) | Jun 2, 2022 | Completed: final sign-off Jun 2022 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) |  | 1st fl: fire sprinkler tenant improvement. 7 relocated upright sprinklers to pendent sprinklers. ref pa# 202204182383. | $2,000 |
| [202204182383](https://www.permitgraph.org/p/202204182383) | Apr 18, 2022 | Completed: final sign-off Oct 2022 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st fl (ste 100 & 150): tenant improvement to include selsctive demolition & construction of non-load bearing partitions, (n) ceilings over pantry area, (n) light fixtures, (n) office doors + frames.… | $1,000,000 |
| [202105281278](https://www.permitgraph.org/p/202105281278) | May 28, 2021 | Never finaled: issued May 2021, no final | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | new lighting and controls for restrooms on the 1st, 2nd and 3rd floors. ref pa 2021-0322-70131 | $15,000 |
| [202103227031](https://www.permitgraph.org/p/202103227031) | Mar 22, 2021 | Completed: final sign-off Dec 2021 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st,2nd,3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit. | $250,000 |
| [202011058301](https://www.permitgraph.org/p/202011058301) | Nov 5, 2020 | Completed: final sign-off Jun 2021 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) | emergency facu replacement: (1) new fire alarm control unit, (1) remote annuciator, (1) cellular dialer with monitor module to report trouble to facu. | $18,000 |
| [201908290212](https://www.permitgraph.org/p/201908290212) | Aug 29, 2019 | Completed: final sign-off Jul 2020 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Peterson Mechanical Inc.](https://www.permitgraph.org/contractor/peterson-mechanical-inc-171486) | replace (4) ac units, (3) exhaust fans, (1) boiler system on the roof. maher na | $450,000 |
| [M878487](https://www.permitgraph.org/p/M878487) | Jan 19, 2018 | Never finaled: issued Jan 2018, no final | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) |  | street space |  |
| [201801088008](https://www.permitgraph.org/p/201801088008) | Jan 8, 2018 | Never finaled: issued Jan 2018, no final | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Battery Street Construction](https://www.permitgraph.org/contractor/battery-street-construction-990815) | ti work includes partition door frames, finishes. fire/life safety deferred. maher na | $50,000 |
| [201706210003](https://www.permitgraph.org/p/201706210003) | Jun 21, 2017 | Completed: final sign-off Dec 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | adding 2 walls between (e) offices and creating 2 new offices on the 1st floor. adding kitchenette area with new sitting area. new electrical and plumbing in new kitchenette. maher na | $100,000 |
| [201703292722](https://www.permitgraph.org/p/201703292722) | Mar 29, 2017 | Completed: final sign-off May 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm t.i. -as built 201703091132, install 1 duct detector, relocate 1 plenum smoke detector, relocate 1 duct detector maher not req | $1,000 |
| [201703242254](https://www.permitgraph.org/p/201703242254) | Mar 24, 2017 | Completed: final sign-off Mar 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklres relocate 5 upright sprinklers on the 1st fl ti 201701318265 | $3,150 |
| [201703091132](https://www.permitgraph.org/p/201703091132) | Mar 9, 2017 | Completed: final sign-off May 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st fl: fire alarm tenant improvement. install 1 smoke detector with base, 1 duct detector. ref ti 2017-0131-8265. | $1,600 |
| [201702109164](https://www.permitgraph.org/p/201702109164) | Feb 10, 2017 | Completed: final sign-off May 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 1st floor: mechanical and electrical for ti ref 201701318265 maher na | $6,000 |
| [201701318265](https://www.permitgraph.org/p/201701318265) | Jan 31, 2017 | Completed: final sign-off May 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | tenant improvement to consist of demolition of non-structural partitions, new partitions and finishes; mep & fire, life safety under separate permit; maher ord 155-13 na | $215,000 |
| [201212196561](https://www.permitgraph.org/p/201212196561) | Dec 19, 2012 | Expired or cancelled: cancelled Jan 2017 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Airco Commercial Services Inc](https://www.permitgraph.org/contractor/airco-commercial-services-inc-572243) | 2nd floor & roof-replace 1 liebert air handler unit in computer room, replace 2 liebert condensing units on roof (new unit 1830 lbs) | $90,000 |
| [200308071410](https://www.permitgraph.org/p/200308071410) | Aug 7, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | rev. to pa#2003/02/06/6907 - rev. fire alarm matrix sheet fa-1 dated 7/23/03 |  |
| [200306308359](https://www.permitgraph.org/p/200306308359) | Jun 30, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | revise fire alarm system operational matrix per app #200302066907 |  |
| [200305235353](https://www.permitgraph.org/p/200305235353) | May 23, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | alternation of exist fire sprinkler system. relocate 10. add new 5 and plyg 17 heads on all 3 stori | $4,900 |
| [200304112015](https://www.permitgraph.org/p/200304112015) | Apr 11, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | alteration of (e) fire sprinkler system: relocate sprinkler 7 heads, add 4 plugs, 17 heads | $4,900 |
| [200302066907](https://www.permitgraph.org/p/200302066907) | Feb 6, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | modifications to the existing fire alarm sys at 1st, 2nd & 3rd & roof only under this permit | $16,500 |
| [200301165347](https://www.permitgraph.org/p/200301165347) | Jan 16, 2003 | Completed: final sign-off Aug 2003 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | demolition of extg offece,conferance, breakroom and storage space /new and relocated of gyp bd prtn | $600,000 |
| [200104046046](https://www.permitgraph.org/p/200104046046) | Apr 4, 2001 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | rev to 9917604 to show relocated fire smoke |  |
| [200104046043](https://www.permitgraph.org/p/200104046043) | Apr 4, 2001 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | revision to app#200003275437 to show smoke detector for sever room 2nd fl. |  |
| [200102222750](https://www.permitgraph.org/p/200102222750) | Feb 22, 2001 | Completed: final sign-off May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | renewal appl#9917425,200003013177,200003013180,200003275437,9917604,9917606,200003013169,9917426,etc |  |
| [200005170262](https://www.permitgraph.org/p/200005170262) | May 17, 2000 | Expired or cancelled: expired Mar 2001 | [3101 19th St](https://www.permitgraph.org/a/3593/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect non-electric, single faced, wall sign | $6,000 |
| [200003275437](https://www.permitgraph.org/p/200003275437) | Mar 27, 2000 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [Cupertino Electric Inc.](https://www.permitgraph.org/contractor/cupertino-electric-inc-174637) | provide new fire alarm notification devices as part of tenant build out in existing building | $47,600 |
| [200003144328](https://www.permitgraph.org/p/200003144328) | Mar 14, 2000 | Completed: final sign-off May 2000 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) |  | installation of magnetic lock lock/battery backup | $500 |
| [200003013169](https://www.permitgraph.org/p/200003013169) | Mar 1, 2000 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | oti-3 1st floor, sp | $5,000 |
| [200003013180](https://www.permitgraph.org/p/200003013180) | Mar 1, 2000 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | oti-3, 3rd floor, sp only | $5,000 |
| [200003013177](https://www.permitgraph.org/p/200003013177) | Mar 1, 2000 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | oti-3, 2nd fl, sp only | $5,000 |
| [9917427](https://www.permitgraph.org/p/9917427) | Feb 25, 2000 | Expired or cancelled: expired May 2001 | [2300 Harrison St](https://www.permitgraph.org/a/3593/001) |  | oti-1 3rd floor el, me, l/s, sp | $400,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (8), [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) (7), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (4), [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) (3), [Everon Llc](https://www.permitgraph.org/contractor/everon-llc-1065604) (3), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (2), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) (2), [Airco Commercial Services Inc](https://www.permitgraph.org/contractor/airco-commercial-services-inc-572243), [Battery Street Construction](https://www.permitgraph.org/contractor/battery-street-construction-990815), [Cupertino Electric Inc.](https://www.permitgraph.org/contractor/cupertino-electric-inc-174637), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232), [Peterson Mechanical Inc.](https://www.permitgraph.org/contractor/peterson-mechanical-inc-171486), [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053)
- Architects: [Kenneth A Lowney](https://www.permitgraph.org/professional/kenneth-a-lowney-C29482) (2), [Cory Steven Creath](https://www.permitgraph.org/professional/cory-steven-creath-C18505), [Donna K Cook](https://www.permitgraph.org/professional/donna-k-cook-C34846), [Douglas Mehl](https://www.permitgraph.org/professional/douglas-mehl-C17504), [Gene Pena](https://www.permitgraph.org/professional/gene-pena-C33511), [Seth Davis](https://www.permitgraph.org/professional/seth-davis-C39514), [Victoria Salgado](https://www.permitgraph.org/professional/victoria-salgado-C37053)
- Engineers: [C B F Inc](https://www.permitgraph.org/professional/c-b-f-inc-335873), [David Mahr](https://www.permitgraph.org/professional/david-mahr-M37794), [Dorel Anghel](https://www.permitgraph.org/professional/dorel-anghel-M26561), [Marc Andrew Steyer](https://www.permitgraph.org/professional/marc-andrew-steyer-S6022), [Pablo Orozco](https://www.permitgraph.org/professional/pablo-orozco-M27485)
- Authorized agents: [Donna K Cook](https://www.permitgraph.org/professional/donna-k-cook-C34846)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3593/001.