# 3100 18th St

Block 3573, lot 027. Page: https://www.permitgraph.org/a/3573/027

- City's use: Commercial Retail
- Stories: 1
- Lot: 5,390 sq ft
- Zoning: M1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

34 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202210315536](https://www.permitgraph.org/p/202210315536) | Oct 31, 2022 | Never finaled: issued Jun 2023, no final | [3100 18th St](https://www.permitgraph.org/a/3573/027) | [Nani Heating & Air Conditioning](https://www.permitgraph.org/contractor/nani-heating-air-conditioning-1063316) | provide new type i & type ii exhaust systems. install new rooftop package unit and split system heat pump. install new outdoor air fan and makeup air system. ref arch pa# 202206297382. |  |
| [202206297382](https://www.permitgraph.org/p/202206297382) | Jun 29, 2022 | Never finaled: issued Aug 2022, no final | [3100 18th St](https://www.permitgraph.org/a/3573/027) | [Roman Hunt](https://www.permitgraph.org/contractor/roman-hunt-951586) | interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes. | $250,000 |
| [202011309840](https://www.permitgraph.org/p/202011309840) | Nov 30, 2020 | Expired or cancelled: cancelled Jan 2026 | [3100 18th St](https://www.permitgraph.org/a/3573/027) |  | ti of existing restaurant including mirror reconfiguration of existing dish wash area: new dishwasher, 3-com sink, food prep sink, mop sink 7 2 floor sinks. replacement & relocation of rooftop gas ho… | $25,000 |
| [201803294918](https://www.permitgraph.org/p/201803294918) | Mar 29, 2018 | Completed: final sign-off Apr 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Ingram Fire Protection Inc](https://www.permitgraph.org/contractor/ingram-fire-protection-inc-985475) | 1/f: relocate (3) spinkler heads and demo (1) sprinkler head. bldg pa #201801310049. maher na | $5,000 |
| [201802121031](https://www.permitgraph.org/p/201802121031) | Feb 12, 2018 | Completed: final sign-off Mar 2019 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| [201802121030](https://www.permitgraph.org/p/201802121030) | Feb 12, 2018 | Completed: final sign-off Mar 2019 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| [201801310049](https://www.permitgraph.org/p/201801310049) | Jan 31, 2018 | Completed: final sign-off Sep 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | revision to app#201709158496. t.i. to include changes to finishes at restrooms. new sink and floor drains including mep's. ref app#201709158496. n/a for maher | $65,000 |
| [201712156579](https://www.permitgraph.org/p/201712156579) | Dec 15, 2017 | Completed: final sign-off Apr 2019 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | site securtiy upgrades, replace fence, replace vehicle & personnel access gate & hardware, like-for-like. maher na | $150,000 |
| [201709158496](https://www.permitgraph.org/p/201709158496) | Sep 15, 2017 | Completed: final sign-off Oct 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | t.i.: work includes but is not limited to (n) flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mo… | $250,000 |
| [201708023644](https://www.permitgraph.org/p/201708023644) | Aug 2, 2017 | Completed: final sign-off Oct 2017 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621) | add 5 mini monitor modules to the fire alarm system to monitor the new generator. reference permit # 201604064052 for architectural dwg. n/a maher | $9,600 |
| [201604064052](https://www.permitgraph.org/p/201604064052) | Apr 6, 2016 | Completed: final sign-off Apr 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | demo e diesel generator, underslab raceways and conductors. replace with new generator with larger tank (660 gal) and free standing 400kw load bank, new raceways and conductors to new load bank e mai… | $160,000 |
| [201603162190](https://www.permitgraph.org/p/201603162190) | Mar 16, 2016 | Completed: final sign-off Mar 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | relocate 2 fire sprinklers at 2nd floor office, ref. arch. 201601288211; maher n/a | $400 |
| [201603101708](https://www.permitgraph.org/p/201603101708) | Mar 10, 2016 | Completed: final sign-off Apr 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | t.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demo (e) electrical equipment, install new ups units, new electrical equipment, new li… | $75,000 |
| [201601288211](https://www.permitgraph.org/p/201601288211) | Jan 28, 2016 | Completed: final sign-off Apr 2018 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 2nd flr: t.i. remove (e) non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling,separate permit sprinkler, life safety, mechanical & elect… | $95,000 |
| [201509156938](https://www.permitgraph.org/p/201509156938) | Sep 15, 2015 | Expired or cancelled: cancelled Jan 2026 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | remove (e) non-structural partitions new gyp board partitions. new electrical and mechnical work | $120,000 |
| [201412234414](https://www.permitgraph.org/p/201412234414) | Dec 23, 2014 | Expired or cancelled: cancelled Aug 2016 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135) | voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a. | $30,000 |
| [201409095834](https://www.permitgraph.org/p/201409095834) | Sep 9, 2014 | Never finaled: issued Sep 2014, no final | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [D'man-Burly Systems Inc.](https://www.permitgraph.org/contractor/d-man-burly-systems-inc-785263) | install relays for connection of new fsds per mechanical app pm20140822477 | $8,600 |
| [201408224495](https://www.permitgraph.org/p/201408224495) | Aug 22, 2014 | Completed: final sign-off Oct 2014 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | install one new split air conditioning system. new fire and smoke dampers at elevator machine room walls. maher n/a. | $15,000 |
| [201408214410](https://www.permitgraph.org/p/201408214410) | Aug 21, 2014 | Expired or cancelled: cancelled Sep 2023 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [D'man-Burly Systems Inc.](https://www.permitgraph.org/contractor/d-man-burly-systems-inc-785263) | install relays for connection of new fsd's to facp. program panel as shown in operational matrix. n/a for the maher ordinance #155-13 | $8,600 |
| [201310028238](https://www.permitgraph.org/p/201310028238) | Oct 2, 2013 | Completed: final sign-off Feb 2014 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [D'man-Burly Systems Inc.](https://www.permitgraph.org/contractor/d-man-burly-systems-inc-785263) | voluntery like for like fire alarm system replacement per csfm bulletin dated 9/4/08. no existing plan or ul certified system documentation exisits. fire alarm sound to be heard throughout building--… | $22,773 |
| [201308214869](https://www.permitgraph.org/p/201308214869) | Aug 21, 2013 | Completed: final sign-off Mar 2014 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | remove/replace package a/c units (2) in kind. remove/replace 2 boilers & reconfigure heating hot water piping. nothing will be visable from street. | $150,000 |
| [201306149563](https://www.permitgraph.org/p/201306149563) | Jun 14, 2013 | Completed: final sign-off Jul 2013 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135) | office t.i. involving demo only. remove 10 lf of drywall partiton. remove door and frame. non structural partiton | $1,500 |
| [201304053837](https://www.permitgraph.org/p/201304053837) | Apr 5, 2013 | Expired or cancelled: withdrawn Jun 2013 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135) | 3rd floor - t.i. remove existing non-structural partition, door & door frame as shown on plan. | $1,500 |
| [201210111875](https://www.permitgraph.org/p/201210111875) | Oct 11, 2012 | Expired or cancelled: cancelled Jan 2026 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [C B 2 Builders Incorporated](https://www.permitgraph.org/contractor/c-b-2-builders-incorporated-873875) | t.i wk includes atl. 2 office rms one (e) divided into 2 spaces with a new partition one existing office will be expanded into an (e) meeting room w/ office dr relocated. existing building system inc… | $10,000 |
| [M291628](https://www.permitgraph.org/p/M291628) | Dec 6, 2011 | Never finaled: issued Dec 2011, no final | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) |  | street space & sidewalk permit. |  |
| [200912163366](https://www.permitgraph.org/p/200912163366) | Dec 16, 2009 | Completed: final sign-off Oct 2010 | [3100 18th St](https://www.permitgraph.org/a/3573/027) | [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) | comply with fire department notice of violation provide second means of egress. partial disabled upgrade at entry. final previously completed work for appl. 9725449 which expired. otain occupant load… | $5,650 |
| [200706265181](https://www.permitgraph.org/p/200706265181) | Jun 26, 2007 | Completed: final sign-off Jul 2007 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | renew 200612200227 for final inspection. |  |
| [200701252618](https://www.permitgraph.org/p/200701252618) | Jan 25, 2007 | Expired or cancelled: withdrawn Feb 2007 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Premier Power Renewable Energy](https://www.permitgraph.org/contractor/premier-power-renewable-energy-831223) | erect solar carport structure and install its roof 216 photovoltaic modules including all elec equipement, conduit and wiring to complete this grid tied photovaltaic system. solor system will supply… | $89,860 |
| [200701222197](https://www.permitgraph.org/p/200701222197) | Jan 22, 2007 | Completed: final sign-off Aug 2007 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Premier Power Renewable Energy](https://www.permitgraph.org/contractor/premier-power-renewable-energy-831223) | isnatallation of 234 photovoltiaic (pv) modules on the roof, 80 pv mofdules on the upper facade, 72 pv modules oj the lower facade. including 911 electrical equipment, conduit & wiring | $160,580 |
| [200612200227](https://www.permitgraph.org/p/200612200227) | Dec 20, 2006 | Expired or cancelled: expired Jul 2007 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect:electric, wall, single faced replacement sign. |  |
| [200602084134](https://www.permitgraph.org/p/200602084134) | Feb 8, 2006 | Completed: final sign-off Aug 2006 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) |  | compressed natural gas fueling station, as built drawings, resubmitted with revision prior to final inspection. elimination of 11 hpa of group a dispenser. revision to appl#200310248492 |  |
| [200506235894](https://www.permitgraph.org/p/200506235894) | Jun 23, 2005 | Completed: final sign-off Aug 2006 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) |  | renew appl#200310248492 for final inspection only |  |
| [200310248492](https://www.permitgraph.org/p/200310248492) | Oct 24, 2003 | Completed: final sign-off Aug 2006 | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) |  | install (cng) compressed natural gas, slow-fill fueling,dispensers,piping,electrical wiring,signages | $300,000 |
| [200210118823](https://www.permitgraph.org/p/200210118823) | Oct 11, 2002 | Never finaled: issued Oct 2002, no final | [2180 Harrison St](https://www.permitgraph.org/a/3573/027) |  | replacement of omega sprinkler heads in ind with viking microfast model m-total 496 heads. |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) (5), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (4), [D'man-Burly Systems Inc.](https://www.permitgraph.org/contractor/d-man-burly-systems-inc-785263) (3), [Paradigm General Contractors](https://www.permitgraph.org/contractor/paradigm-general-contractors-608135) (3), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (2), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) (2), [Premier Power Renewable Energy](https://www.permitgraph.org/contractor/premier-power-renewable-energy-831223) (2), [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263), [C B 2 Builders Incorporated](https://www.permitgraph.org/contractor/c-b-2-builders-incorporated-873875), [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621), [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126), [Ingram Fire Protection Inc](https://www.permitgraph.org/contractor/ingram-fire-protection-inc-985475), [Nani Heating & Air Conditioning](https://www.permitgraph.org/contractor/nani-heating-air-conditioning-1063316), [Roman Hunt](https://www.permitgraph.org/contractor/roman-hunt-951586)
- Architects: [Michelle Jones](https://www.permitgraph.org/professional/michelle-jones-C28641) (4), [William Walters](https://www.permitgraph.org/professional/william-walters-C20271) (3), [Joseph Mendoza](https://www.permitgraph.org/professional/joseph-mendoza-C22123), [Nick Palter](https://www.permitgraph.org/professional/nick-palter-C26379), [Seth Boor](https://www.permitgraph.org/professional/seth-boor-C29019)
- Engineers: [Gurdaver Singh](https://www.permitgraph.org/professional/gurdaver-singh-M33399) (3), [Victor Steffen](https://www.permitgraph.org/professional/victor-steffen-E11872) (2), [Dorel Anghel](https://www.permitgraph.org/professional/dorel-anghel-M26561), [John S. Allen](https://www.permitgraph.org/professional/john-s-allen-M20214), [Matthew Pagendarm](https://www.permitgraph.org/professional/matthew-pagendarm-E18262), [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582), [Mike Hom](https://www.permitgraph.org/professional/mike-hom-C71450), [Pius Kao](https://www.permitgraph.org/professional/pius-kao-M23749), [Vic Yap](https://www.permitgraph.org/professional/vic-yap-E8731)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3573/027.
