# 8 Sharon St

Block 3558, lot 043. Page: https://www.permitgraph.org/a/3558/043

- City's use: Single Family Residential
- Built: 1905
- Stories: 2
- Units: 1
- Rooms: 3 bathrooms
- Building: 2,884 sq ft
- Lot: 3,125 sq ft
- Zoning: RH3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

9 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202306089590](https://www.permitgraph.org/p/202306089590) | Jun 8, 2023 | Completed: final sign-off Apr 2024 | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [A & E Installations Inc Dba Cruz Glazing](https://www.permitgraph.org/contractor/a-e-installations-inc-dba-cruz-glazing-1092896) | windows replacement in kind 9 windows agee lugs included, double pane glass: glass uv 0.25 shgc 0.40 the windows will ave agee lugs like that of (e) windows, there will be no change in size or locati… | $22,174 |
| [202303143665](https://www.permitgraph.org/p/202303143665) | Mar 14, 2023 | Never finaled: issued Mar 2023, no final | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Ace Roofing East Bay](https://www.permitgraph.org/contractor/ace-roofing-east-bay-1054840) | reroofing | $15,000 |
| [202303093370](https://www.permitgraph.org/p/202303093370) | Mar 9, 2023 | Completed: final sign-off Sep 2023 | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Maap Corp Dba Save Energy Co](https://www.permitgraph.org/contractor/maap-corp-dba-save-energy-co-440356) | window replacement (10) total (e) wood. (8): (n) marvin woodclad wood (wood interior adn alum exterior) and (2) with marvin essential (bathroom) in kind retrofit install, u factor < or = 0.30 | $26,087 |
| [202105200705](https://www.permitgraph.org/p/202105200705) | May 20, 2021 | Completed: final sign-off Sep 2021 | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Ams Construction](https://www.permitgraph.org/contractor/ams-construction-1034015) | bathroom remodel in-kind. new exhaust fan. rewiring. upgrade plumbing. install new plumbing fixtures: tub, sink, toilet. re-tile shower walls, floor, water closet. no change of layout. | $27,800 |
| [201711204352](https://www.permitgraph.org/p/201711204352) | Nov 20, 2017 | Completed: final sign-off Jan 2018 | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Maap Corp Dba Save Energy Co](https://www.permitgraph.org/contractor/maap-corp-dba-save-energy-co-440356) | replace 6 windows not visible from street. no strucvtural changes. max u-factor 0l32, marvin ornate clad. maher n/a. | $13,104 |
| [201106087680](https://www.permitgraph.org/p/201106087680) | Jun 8, 2011 | Never finaled: issued Oct 2011, no final | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Elkington Building Company](https://www.permitgraph.org/contractor/elkington-building-company-450443) | replace (e) legally built solarium (permit# 8305376 - 1983) with new windows & comp. shingle roof. remove (e) wood patio on grade & replace with smaller flagstone patio. all work will be within (e) b… | $15,000 |
| [200603287663](https://www.permitgraph.org/p/200603287663) | Mar 28, 2006 | Completed: final sign-off Apr 2006 | [8 Sharon St](https://www.permitgraph.org/a/3558/043) | [Ches Coleman Gen. Contr.](https://www.permitgraph.org/contractor/ches-coleman-gen-contr-480444) | to renew expired permit # 2004-10-14-6818 #1038 for final inspection. |  |
| [200509122546](https://www.permitgraph.org/p/200509122546) | Sep 12, 2005 | Never finaled: issued Sep 2005, no final | [8 Sharon St](https://www.permitgraph.org/a/3558/043) |  | reface kitchen cabinets and new countertop. kitchen remodel at lower unit | $10,000 |
| [200410146818](https://www.permitgraph.org/p/200410146818) | Oct 14, 2004 | Never finaled: issued Oct 2004, no final | [8 Sharon St](https://www.permitgraph.org/a/3558/043) |  | remodel master bath, relocate washer & dryer, move walk in closet | $50,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Maap Corp Dba Save Energy Co](https://www.permitgraph.org/contractor/maap-corp-dba-save-energy-co-440356) (2), [A & E Installations Inc Dba Cruz Glazing](https://www.permitgraph.org/contractor/a-e-installations-inc-dba-cruz-glazing-1092896), [Ace Roofing East Bay](https://www.permitgraph.org/contractor/ace-roofing-east-bay-1054840), [Ams Construction](https://www.permitgraph.org/contractor/ams-construction-1034015), [Ches Coleman Gen. Contr.](https://www.permitgraph.org/contractor/ches-coleman-gen-contr-480444), [Elkington Building Company](https://www.permitgraph.org/contractor/elkington-building-company-450443)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/a/3558/043.
