# 179 Julian Ave

Block 3554, lot 040. Page: https://www.permitgraph.org/a/3554/040

- City's use: Commercial Hotel
- Built: 1915
- Stories: 3
- Rooms: 3 bathrooms
- Building: 6,960 sq ft
- Lot: 2,520 sq ft
- Zoning: RM3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

16 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201801027689](https://www.permitgraph.org/p/201801027689) | Jan 2, 2018 | Never finaled: filed Jan 2018, never issued | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | to comply with nov #201387781 for memorializing occupancy as an r-2 residential hotel with 35 guest rooms & one guest room with cooking. all guest rooms to be residential. | $25,000 |
| [201702088988](https://www.permitgraph.org/p/201702088988) | Feb 8, 2017 | Completed: final sign-off Dec 2017 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. | $58,000 |
| [201611152812](https://www.permitgraph.org/p/201611152812) | Nov 15, 2016 | Never finaled: issued Nov 2016, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) | discovery of existing bolting & foundation in preparation for engineering drawings. no demo. | $250 |
| [201508315680](https://www.permitgraph.org/p/201508315680) | Aug 31, 2015 | Completed: final sign-off Feb 2016 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | check leaking toilet and tubs. all work at 6 toilet rooms and 6 bathing rooms. check dry rot inspect for termites. fix leakage sink, new paint, tile paint door & locks, elect led 3 corridors. check f… | $1,500 |
| [201401146240](https://www.permitgraph.org/p/201401146240) | Jan 14, 2014 | Completed: final sign-off Mar 2014 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [M F Sanchez Construction & Painting](https://www.permitgraph.org/contractor/m-f-sanchez-construction-painting-819382) | g/f common area 1 bathroom - replace shower and toilet on (e) area ; replace lightings and switches. to comply with cec150(k) 10to comply with 201147286 items 7,8 and 9, install grab bars in shower a… | $790 |
| [201308214906](https://www.permitgraph.org/p/201308214906) | Aug 21, 2013 | Completed: final sign-off May 2014 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | to comply with ordinance 029-13 only , installation of grab bars in hallway shared baths, in compliance with sro grab bar ordinance, 3 on each 1st, 2nd & 3rd floors. | $500 |
| [201307313208](https://www.permitgraph.org/p/201307313208) | Jul 31, 2013 | Never finaled: filed Jul 2013, never issued | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | resolve nov 201387781 dated 2/14/13. submit permit research doc to correct bldg records and use permit to reflect actual room count from 10 housekeeping rooms with cooking and 17 guests rooms to 35 g… |  |
| [201306280742](https://www.permitgraph.org/p/201306280742) | Jun 28, 2013 | Completed: final sign-off Dec 2013 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | put in shower kit in existing toilet rm facility with existing floor drain, replace tiles or other water proofing, material on wall after shower kit is installed, this will comply with nov 201147286 | $700 |
| [M365527](https://www.permitgraph.org/p/M365527) | Jan 9, 2013 | Never finaled: issued Jan 2013, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | street space and sidewalk repair |  |
| [201108192873](https://www.permitgraph.org/p/201108192873) | Aug 19, 2011 | Never finaled: issued Aug 2011, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | remodel one hallway bathroom, flooring tile only, hallway and room flooring and to comply his complaint #201147286, provide high efficacy lights or "manual on" occupancy sensor in bathroom. | $850 |
| [201007277592](https://www.permitgraph.org/p/201007277592) | Jul 27, 2010 | Never finaled: issued Jul 2010, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) |  | put new sheet rock in ceiling of common bathrooms on 2nd and 3rd floors. field verify sprinkler system coverage. | $500 |
| [200506235946](https://www.permitgraph.org/p/200506235946) | Jun 23, 2005 | Completed: final sign-off Aug 2005 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | renew expired permit no. 200403057894-200312112143-200308283256-200210310460 |  |
| [200403057894](https://www.permitgraph.org/p/200403057894) | Mar 5, 2004 | Never finaled: issued Mar 2004, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | renewal of app #200308283256 for final inspection |  |
| [200312112143](https://www.permitgraph.org/p/200312112143) | Dec 11, 2003 | Never finaled: issued Jun 2004, no final | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | revision to pa 200210310460 |  |
| [200308283256](https://www.permitgraph.org/p/200308283256) | Aug 28, 2003 | Expired or cancelled: expired Jun 2005 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of digital alarm communicator to provide monitoring of the sprinkler system,scope of | $2,000 |
| [200210310460](https://www.permitgraph.org/p/200210310460) | Oct 31, 2002 | Expired or cancelled: expired Jun 2005 | [179 Julian Av](https://www.permitgraph.org/a/3554/040) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | install fire sprinkler system per sro ordinance | $30,555 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) (3), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (2), [Theodore Design & Constr](https://www.permitgraph.org/contractor/theodore-design-constr-725137) (2), [M F Sanchez Construction & Painting](https://www.permitgraph.org/contractor/m-f-sanchez-construction-painting-819382)
- Engineers: [Kevin O'connor](https://www.permitgraph.org/professional/kevin-o-connor-C65297), [Rodrigo Santos](https://www.permitgraph.org/professional/rodrigo-santos-S2984)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3554/040.
