# 1800 Mission St

Block 3547, lot 001. Page: https://www.permitgraph.org/a/3547/001

- City's use: Commercial Retail
- Built: 1914
- Stories: 4
- Building: 210,935 sq ft
- Lot: 68,772 sq ft
- Zoning: UMU
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

80 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202210114143](https://www.permitgraph.org/p/202210114143) | Oct 11, 2022 | Completed: final sign-off Oct 2022 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | as-built: fire alarm record st: drawning set feflects removal of f/a devices isntall temporaitly under f/a 202205275132. |  |
| [202205275132](https://www.permitgraph.org/p/202205275132) | May 27, 2022 | Never finaled: issued May 2022, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm only. tenant improvement where new equipment and devices will be added. 1 backup amplifier, 2 power supply, 1 control module, 1 isolation relay, 39 speaker strobes. these devices are being… | $6,500 |
| [202205164336](https://www.permitgraph.org/p/202205164336) | May 16, 2022 | Expired or cancelled: cancelled Jan 2026 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | temp installation for event at sf armory drill court. temp wall and rigging to be installed and removed after 10/1/22. temp extension of life safety system ( at sffd request. | $100,000 |
| [202102094327](https://www.permitgraph.org/p/202102094327) | Feb 9, 2021 | Completed: final sign-off Mar 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | installation of evacuation maps and |  |
| [202011098541](https://www.permitgraph.org/p/202011098541) | Nov 9, 2020 | Completed: final sign-off Mar 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | as-built for pa #201909111304. install new 6" fire service, back flow & fire pump. install new fdc standpipe system & automatic sprinkler system throughout. (total 1672 heads) $514.62 | $860,444 |
| [202009174382](https://www.permitgraph.org/p/202009174382) | Sep 17, 2020 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm only, as build drawings. added heat detector & speaker to roof elevator landing and misc changes to system. ref bldg c | $1,000 |
| [202008071360](https://www.permitgraph.org/p/202008071360) | Aug 7, 2020 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | deferred submittal for stairs and railings. new stairs #4 and #5. revision to app#201809190782 |  |
| [202008071362](https://www.permitgraph.org/p/202008071362) | Aug 7, 2020 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | deferred submittal for stairs and railings. new stairs #3 within the building. revision to app#201809190782 |  |
| [M1216498](https://www.permitgraph.org/p/M1216498) | Jul 16, 2020 | Never finaled: issued Jul 2020, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [202006098288](https://www.permitgraph.org/p/202006098288) | Jun 9, 2020 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to permit # 201809190782. this package revises approved basement elevator machine room, level 1; gender neutral restroom removal, level 1 men's and women's restrooms reconfiguration, and the… |  |
| [202005147533](https://www.permitgraph.org/p/202005147533) | May 14, 2020 | Completed: final sign-off Mar 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm (e) notifier nfs2-640 will remain, add to cellular communicator, annunciator, amplifier & strobe power supplies, 19 smoke, 2 heat detectors, 1 manual pull, 2 pull mods, 10 dual input mods,… | $85,000 |
| [201910285759](https://www.permitgraph.org/p/201910285759) | Oct 28, 2019 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to app#201809190782. revision to stair #3 only. n/a for maher |  |
| [M1149787](https://www.permitgraph.org/p/M1149787) | Oct 8, 2019 | Never finaled: issued Oct 2019, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space only |  |
| [201909111304](https://www.permitgraph.org/p/201909111304) | Sep 11, 2019 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | reference appln #201809190782. install (n) 6" fire service, backflor & fire pump. install (n) fdc, standpipe system & automatic sprinkler system throughout (total 1672 heads) | $860,444 |
| [201905130470](https://www.permitgraph.org/p/201905130470) | May 13, 2019 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revisio to 201809190778. revision to previously approved seismic retrofit to accomodate additional roof loads of future occupancy at roof. roof occupancy under future permit |  |
| [M1060847](https://www.permitgraph.org/p/M1060847) | Apr 4, 2019 | Never finaled: issued Apr 2019, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M1044607](https://www.permitgraph.org/p/M1044607) | Feb 28, 2019 | Never finaled: issued Feb 2019, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space only |  |
| [201809190778](https://www.permitgraph.org/p/201809190778) | Sep 19, 2018 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a ** | $9,000,000 |
| [M981507](https://www.permitgraph.org/p/M981507) | Sep 19, 2018 | Never finaled: issued Sep 2018, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [201809190817](https://www.permitgraph.org/p/201809190817) | Sep 19, 2018 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | voluntary stabilization of the existing masonry parapet at the west facade, gable end walls. work to occur above ground floor. | $1,000,000 |
| [201809190782](https://www.permitgraph.org/p/201809190782) | Sep 19, 2018 | Completed: final sign-off May 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher… | $5,000,000 |
| [M976927](https://www.permitgraph.org/p/M976927) | Sep 11, 2018 | Never finaled: issued Sep 2018, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M974229](https://www.permitgraph.org/p/M974229) | Sep 5, 2018 | Never finaled: issued Sep 2018, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M960407](https://www.permitgraph.org/p/M960407) | Aug 6, 2018 | Never finaled: issued Aug 2018, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [201805310613](https://www.permitgraph.org/p/201805310613) | May 31, 2018 | Completed: final sign-off Feb 2021 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Eco Bay Services Inc.](https://www.permitgraph.org/contractor/eco-bay-services-inc-912328) | selective demo work of basement, level 2 & level 3. no changes to demo of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher | $35,000 |
| [M909748](https://www.permitgraph.org/p/M909748) | Apr 9, 2018 | Never finaled: issued Apr 2018, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M883687](https://www.permitgraph.org/p/M883687) | Feb 1, 2018 | Never finaled: issued Feb 2018, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M845567](https://www.permitgraph.org/p/M845567) | Oct 18, 2017 | Never finaled: issued Oct 2017, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space permit |  |
| [M815707](https://www.permitgraph.org/p/M815707) | Aug 2, 2017 | Never finaled: issued Aug 2017, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M809947](https://www.permitgraph.org/p/M809947) | Jul 18, 2017 | Never finaled: issued Jul 2017, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | streets space |  |
| [201705126448](https://www.permitgraph.org/p/201705126448) | May 12, 2017 | Completed: final sign-off Jun 2018 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | g/f- fire alarm, (3) new speaker/strobes. t.i. pa#201607142293. n/a ordinance #155-13 | $5,000 |
| [M783307](https://www.permitgraph.org/p/M783307) | May 5, 2017 | Never finaled: issued May 2017, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space. |  |
| [201704053227](https://www.permitgraph.org/p/201704053227) | Apr 5, 2017 | Completed: final sign-off Jul 2018 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Yerba Buena Builders Inc](https://www.permitgraph.org/contractor/yerba-buena-builders-inc-724551) | 1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13 |  |
| [201703151551](https://www.permitgraph.org/p/201703151551) | Mar 15, 2017 | Never finaled: filed Mar 2017, never issued | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | replacement of existing non-historic loading dock coiling door on julian street with new perforated coiling door, new air intake & exhaust vents on roof. | $12,000 |
| [M758448](https://www.permitgraph.org/p/M758448) | Feb 3, 2017 | Never finaled: issued Feb 2017, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | street space permit |  |
| [201701106804](https://www.permitgraph.org/p/201701106804) | Jan 10, 2017 | Completed: final sign-off Sep 2017 | [333 14th St](https://www.permitgraph.org/a/3547/001) | [D C Taylor Co](https://www.permitgraph.org/contractor/d-c-taylor-co-451656) | reroofing | $624,357 |
| [201610281439](https://www.permitgraph.org/p/201610281439) | Oct 28, 2016 | Completed: final sign-off Nov 2017 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Yerba Buena Builders Inc](https://www.permitgraph.org/contractor/yerba-buena-builders-inc-724551) | administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to ai… | $84,000 |
| [201610140336](https://www.permitgraph.org/p/201610140336) | Oct 14, 2016 | Completed: final sign-off Mar 2017 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Dylan Arrants Construction](https://www.permitgraph.org/contractor/dylan-arrants-construction-825385) | revision to pa 2015-0320-1505 - submittal of electrical, mechanical title 24. also floor plan change (number and arrangement of fixtures) |  |
| [201610120089](https://www.permitgraph.org/p/201610120089) | Oct 12, 2016 | Never finaled: issued Oct 2016, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st fl: t.i. 1 new speaker strobe added, 5 extg speaker strobes, and 6 extg manual pull station relocated, 1 extg speaker replaced with new speaker strobe, 1 high cd speaker strobe replaced with stan… | $5,500 |
| [201608034112](https://www.permitgraph.org/p/201608034112) | Aug 3, 2016 | Completed: final sign-off Dec 2016 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | tenant improvement including addition of (3) new vestibules within a-4/drill court space to improve acoustical performance, no chane in exiting width as proposed; maher n/a | $18,000 |
| [201607142293](https://www.permitgraph.org/p/201607142293) | Jul 14, 2016 | Completed: final sign-off Jul 2018 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground fl… | $285,000 |
| [201604074231](https://www.permitgraph.org/p/201604074231) | Apr 7, 2016 | Completed: final sign-off Dec 2016 | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | construct 3 vestibules on north end of drill court to improve sound attenuation vestibules will include egress doors. no impact on extg use occupancy. all work wil be interior. n/a for maher | $20,000 |
| [201602260581](https://www.permitgraph.org/p/201602260581) | Feb 26, 2016 | Never finaled: issued Feb 2016, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm: add one speaker/strobe & two stroves to existing fire alarm system as part of restroom renovation project on the 1st floor. ref pa 2015-0320-1505. maher na | $1,700 |
| [201601066450](https://www.permitgraph.org/p/201601066450) | Jan 6, 2016 | Completed: final sign-off Apr 2016 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | administrative permit for planning request to establish change of use of drill court area from arts activity (planning code sec. 843.55) to principally permitted entertaiment use per (planning code s… |  |
| [201504163834](https://www.permitgraph.org/p/201504163834) | Apr 16, 2015 | Never finaled: issued Apr 2015, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | documentation purposes only. no work done. to establish use of existing non conforming a-4 public assembly. see attached pre application documentation. located at the drill court area. also to establ… |  |
| [201503201505](https://www.permitgraph.org/p/201503201505) | Mar 20, 2015 | Completed: final sign-off May 2017 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Dylan Arrants Construction](https://www.permitgraph.org/contractor/dylan-arrants-construction-825385) | enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a. | $89,000 |
| [M506608](https://www.permitgraph.org/p/M506608) | Jul 24, 2014 | Never finaled: issued Jul 2014, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [201302250887](https://www.permitgraph.org/p/201302250887) | Feb 25, 2013 | Completed: final sign-off Apr 2013 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | remove four non load bearing walls of claytile and plaster between column-plasters as shown and below beams to create larger spaces. patch sealand paint openings as required after demolition is compl… | $8,000 |
| [201301158019](https://www.permitgraph.org/p/201301158019) | Jan 15, 2013 | Never finaled: issued Feb 2013, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Tom Ehline](https://www.permitgraph.org/contractor/tom-ehline-858774) | replace e broken glass, paint e truss and metal work. install insulation panels on walls and ceilings, install maple floor to replace in kind | $200,000 |
| [M294008](https://www.permitgraph.org/p/M294008) | Dec 28, 2011 | Never finaled: issued Dec 2011, no final | [333 14th St](https://www.permitgraph.org/a/3547/001) |  | additional address at building on 14th street as main entrance. |  |
| [201112060136](https://www.permitgraph.org/p/201112060136) | Dec 6, 2011 | Never finaled: issued Dec 2011, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | install 2" fiberglass sound blanket material to the entire surface of interior drill court ceiling, no other work. product name: theater-shield accoustical system. | $40,000 |
| [201110317966](https://www.permitgraph.org/p/201110317966) | Oct 31, 2011 | Completed: final sign-off Nov 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | remove note from sheet a4.0 all doors to be connected to bldg life-saftey system & to fail safe for fire fighter access to all evels as per app#201104063576. |  |
| [201107210703](https://www.permitgraph.org/p/201107210703) | Jul 21, 2011 | Completed: final sign-off Mar 2015 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st floor-installation of new fire alarm system for the drill court & building core | $23,000 |
| [M265546](https://www.permitgraph.org/p/M265546) | Jun 1, 2011 | Never finaled: issued Jun 2011, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [201105105727](https://www.permitgraph.org/p/201105105727) | May 10, 2011 | Completed: final sign-off Aug 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | reference to app#201007076118.change extg office kitchen to a catering kitchen. no sale of food. provide food prep sink with floor sink,3 compartment sink with grease trap. hand wash sink. | $3,500 |
| [201104284971](https://www.permitgraph.org/p/201104284971) | Apr 28, 2011 | Completed: final sign-off May 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | provide 2-hr. separation between wood & metal shop in basement, including rated doors & frames and fire seal all penetrations. | $4,200 |
| [201104063576](https://www.permitgraph.org/p/201104063576) | Apr 6, 2011 | Completed: final sign-off Nov 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | refer to sfdbi dept pre-application review minutes attached-new rated partitions & doors to enclose the central stairs @ bsmt level. new tempered glass security wall, tempered glass doors @ 2nd/3rd/4… | $75,000 |
| [M251626](https://www.permitgraph.org/p/M251626) | Apr 4, 2011 | Never finaled: issued Apr 2011, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space permit |  |
| [201010082564](https://www.permitgraph.org/p/201010082564) | Oct 8, 2010 | Completed: final sign-off Jan 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | as built for fire suppression system ref app 201008209216 | $800 |
| [201008239388](https://www.permitgraph.org/p/201008239388) | Aug 23, 2010 | Expired or cancelled: withdrawn Jul 2012 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | install kitchen exhaust hood with grease flue; install make-up air system, and exhaust fan on roof; (for employee kitchen, only) | $23,515 |
| [201008209216](https://www.permitgraph.org/p/201008209216) | Aug 20, 2010 | Completed: final sign-off Jan 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | installation of ul-300 kitchen fire system | $800 |
| [201008199163](https://www.permitgraph.org/p/201008199163) | Aug 19, 2010 | Completed: final sign-off May 2012 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | provide accessible railings at entry, close off upper mezzanine, provide required exit doors, repair pipe casings per sffd. fire alarm and emergency lighting, and mech & electrical all under separate… | $100,000 |
| [201007076118](https://www.permitgraph.org/p/201007076118) | Jul 7, 2010 | Completed: final sign-off Mar 2011 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | relocate (e) kitchen from the basement floor to the 4th floor room for new kitchen employees | $50,000 |
| [M208587](https://www.permitgraph.org/p/M208587) | Jun 25, 2010 | Never finaled: issued Jun 2010, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space and mta |  |
| [200910239699](https://www.permitgraph.org/p/200910239699) | Oct 23, 2009 | Completed: final sign-off Nov 2009 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Platinum Roofing Inc](https://www.permitgraph.org/contractor/platinum-roofing-inc-790139) | reroofing | $82,308 |
| [M176046](https://www.permitgraph.org/p/M176046) | Aug 10, 2009 | Never finaled: issued Aug 2009, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space & sidewalk permit. |  |
| [200906049791](https://www.permitgraph.org/p/200906049791) | Jun 4, 2009 | Never finaled: issued Oct 2009, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | reinforce (e) brick parapet with (n) steel and (n) shotcrete. not visible from exterior. | $15,000 |
| [M157364](https://www.permitgraph.org/p/M157364) | Mar 25, 2009 | Never finaled: issued Mar 2009, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space permit only. |  |
| [M147589](https://www.permitgraph.org/p/M147589) | Jan 15, 2009 | Never finaled: issued Jan 2009, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space only. |  |
| [M120225](https://www.permitgraph.org/p/M120225) | May 22, 2008 | Never finaled: issued May 2008, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space permit only. |  |
| [M114004](https://www.permitgraph.org/p/M114004) | Mar 26, 2008 | Never finaled: issued Mar 2008, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space permit. |  |
| [M107284](https://www.permitgraph.org/p/M107284) | Feb 12, 2008 | Never finaled: issued Feb 2008, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space |  |
| [M106284](https://www.permitgraph.org/p/M106284) | Feb 6, 2008 | Never finaled: issued Feb 2008, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | street space permit only. |  |
| [200802054090](https://www.permitgraph.org/p/200802054090) | Feb 5, 2008 | Completed: final sign-off Aug 2008 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | replace (3) sets of double doors on julian street side of building in kind | $20,000 |
| [200708099266](https://www.permitgraph.org/p/200708099266) | Aug 9, 2007 | Completed: final sign-off Aug 2008 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | window replacment in kind, repair e windows per plans, repair and restore e wood windows and replacment of selected deteriorated windows in accordance w/approved cert of appropriateness | $80,000 |
| [200510195954](https://www.permitgraph.org/p/200510195954) | Oct 19, 2005 | Never finaled: issued Oct 2005, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) | [Golden Gatetank Removal,Inc](https://www.permitgraph.org/contractor/golden-gatetank-removal-inc-616521) | the scope of work includes a new curb cut for an (e) roll up door. the new curb cut will improve an (e) non dpw compliant driveway entrance. this entrance & driveway has been the building's primary v… | $800 |
| [M30232](https://www.permitgraph.org/p/M30232) | Nov 17, 2004 | Never finaled: issued Nov 2004, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | streetspace |  |
| [200102142115](https://www.permitgraph.org/p/200102142115) | Feb 14, 2001 | Expired or cancelled: expired May 2003 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | asbestos abatement soft ddmo remove existing asbestos and lead containing material fr site prep site | $150,000 |
| [200009059659](https://www.permitgraph.org/p/200009059659) | Sep 5, 2000 | Never finaled: issued Nov 2000, no final | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | seismic demo parking ada include new elevators | $2,000,000 |
| [200003295698](https://www.permitgraph.org/p/200003295698) | Mar 29, 2000 | Expired or cancelled: expired Oct 2000 | [1800 Mission St](https://www.permitgraph.org/a/3547/001) |  | remove wall finishing to expose structural for seismic upgrade 3rd floor | $15,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (9), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (8), [Dylan Arrants Construction](https://www.permitgraph.org/contractor/dylan-arrants-construction-825385) (2), [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) (2), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (2), [Yerba Buena Builders Inc](https://www.permitgraph.org/contractor/yerba-buena-builders-inc-724551) (2), [D C Taylor Co](https://www.permitgraph.org/contractor/d-c-taylor-co-451656), [Eco Bay Services Inc.](https://www.permitgraph.org/contractor/eco-bay-services-inc-912328), [Golden Gatetank Removal,Inc](https://www.permitgraph.org/contractor/golden-gatetank-removal-inc-616521), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [Platinum Roofing Inc](https://www.permitgraph.org/contractor/platinum-roofing-inc-790139), [Tom Ehline](https://www.permitgraph.org/contractor/tom-ehline-858774)
- Architects: [Andrew Wolfram](https://www.permitgraph.org/professional/andrew-wolfram-C27838) (5), [Andrew Wokfram](https://www.permitgraph.org/professional/andrew-wokfram-27838) (2), [Douglas G. Tom](https://www.permitgraph.org/professional/douglas-g-tom-C12405) (2), [John Fisher](https://www.permitgraph.org/professional/john-fisher-C4487) (2)
- Engineers: [Alexander Sivyer](https://www.permitgraph.org/professional/alexander-sivyer-S4952) (2), [Julian White](https://www.permitgraph.org/professional/julian-white-E18350) (2), [Antonio Jakosalem](https://www.permitgraph.org/professional/antonio-jakosalem-E15401), [Justin Schultz](https://www.permitgraph.org/professional/justin-schultz-M35462), [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582), [William E. Tremayne](https://www.permitgraph.org/professional/william-e-tremayne-S5866)
- Designers: [Andrew Wolfram](https://www.permitgraph.org/professional/andrew-wolfram-C27838), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/professional/pacific-auxiliary-fire-alarm-229167)
- Pmt consultant/expediters: [David Fraser](https://www.permitgraph.org/professional/david-fraser-229167)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3547/001.