# 58 Belcher St

Block 3537, lot 065. Page: https://www.permitgraph.org/a/3537/065

The city's assessor roll has no record for this parcel.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201512306203](https://www.permitgraph.org/p/201512306203) | Dec 30, 2015 | Completed: final sign-off Feb 2016 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | to comply with physical inspection report #cc-7969. | $1,000 |
| [201305136775](https://www.permitgraph.org/p/201305136775) | May 13, 2013 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | revision to pa# 2013-0116-8086-legalize new garage door installed by previous owner at request of building inspector. |  |
| [201302281145](https://www.permitgraph.org/p/201302281145) | Feb 28, 2013 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | revision to pa#2013-02-14-0203. install (n) 3 1/2 x 14 psl on top fl @ living room. strengthen roof framing w/ 4x4's @ roof above living room. (n) roof framing @ master bdrm installed by previous own… | $500 |
| [201302140203](https://www.permitgraph.org/p/201302140203) | Feb 14, 2013 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | remodel ktichen & bathrooms @ 2nd floor. | $30,000 |
| [201301168086](https://www.permitgraph.org/p/201301168086) | Jan 16, 2013 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | remodel kitchen & baths, voluntary structural upgrades, add bedroom. relocate 1/2 bath convert to full bath. at master bath add bathtub. | $20,000 |
| [201301047218](https://www.permitgraph.org/p/201301047218) | Jan 4, 2013 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | infill light well at south elevation. add rear deck. remove spiral stair. | $3,000 |
| [201212186426](https://www.permitgraph.org/p/201212186426) | Dec 18, 2012 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) | [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) | 1st floor: move existing wall to align with 2nd floor wall. infill light well at north elevation. | $10,000 |
| [201205210910](https://www.permitgraph.org/p/201205210910) | May 21, 2012 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) |  | to complete & finalize work approved under pa #201005182670. | $85,000 |
| [M205646](https://www.permitgraph.org/p/M205646) | Jun 9, 2010 | Never finaled: issued Jun 2010, no final | [58 Belcher St](https://www.permitgraph.org/a/3537/065) |  | street space permit |  |
| [201005182670](https://www.permitgraph.org/p/201005182670) | May 18, 2010 | Completed: final sign-off May 2013 | [58 Belcher St](https://www.permitgraph.org/a/3537/065) |  | 1st. flr. convert utility to living space. relocate (e) kit. & bath. add (n) 1/2 bath & laundry, move windows & 3-ext. doors @ side & rear. no visible from street. replace 2-(e) rear & side windows. | $85,000 |
| [M94069](https://www.permitgraph.org/p/M94069) | Nov 5, 2007 | Never finaled: issued Nov 2007, no final | [58 Belcher St](https://www.permitgraph.org/a/3537/065) |  | street space & sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Eastwood Development Incorporated](https://www.permitgraph.org/contractor/eastwood-development-incorporated-959948) (7)
- Engineers: [Christopher Durkin P.E.](https://www.permitgraph.org/professional/christopher-durkin-p-e-C71064) (2), [Chris Durkin](https://www.permitgraph.org/professional/chris-durkin-71064)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3537/065.