# 140 Duboce Ave

Block 3502, lot 024. Page: https://www.permitgraph.org/a/3502/024

- City's use: Multi-Family Residential
- Built: 1928
- Stories: 3
- Units: 19
- Rooms: 19 bathrooms
- Building: 9,240 sq ft
- Lot: 3,746 sq ft
- Zoning: RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

24 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202509024338](https://www.permitgraph.org/p/202509024338) | Sep 2, 2025 | Completed: final sign-off Nov 2025 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Hon's Construction Inc.](https://www.permitgraph.org/contractor/hon-s-construction-inc-424595) | to perform repairs per facade inspection report provided by borne consulting per sf facade maintenance program (sffmp), remove prep and recoat loose and tailing coating throughout exterior facade, re… | $317,870 |
| [202502140352](https://www.permitgraph.org/p/202502140352) | Feb 14, 2025 | Completed: final sign-off Jun 2025 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Hon's Construction Inc.](https://www.permitgraph.org/contractor/hon-s-construction-inc-424595) | patch and repair damaged front facade cementitius coating. touch up paint where repairs made | $41,676 |
| [202501178613](https://www.permitgraph.org/p/202501178613) | Jan 17, 2025 | Completed: final sign-off Feb 2025 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Hon's Construction Inc.](https://www.permitgraph.org/contractor/hon-s-construction-inc-424595) | repair decking at lower level, remove and replace cracked stair tread as needed. sand & paint wood railings as needed. less than 50%. comply sb721. not visible to the street. | $3,295 |
| [202312273139](https://www.permitgraph.org/p/202312273139) | Dec 27, 2023 | In progress: issued Dec 2023 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [All Star Fire Protection Llc](https://www.permitgraph.org/contractor/all-star-fire-protection-llc-1023631) | as built only to show the correct back flow preventer on the plans. ref# 202203099597 |  |
| [202311281450](https://www.permitgraph.org/p/202311281450) | Nov 28, 2023 | Completed: final sign-off Dec 2023 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Au Electric Corporation/Aec Alarms](https://www.permitgraph.org/contractor/au-electric-corporation-aec-alarms-381840) | fire sprinkler monitoring system, install additional fire devices on the (e) fa system for 4 adus on the gr/f ref adu pa# 202003116820, sprinkler pa# 202203099597, fa pa# 201808177639. | $7,000 |
| [202204212688](https://www.permitgraph.org/p/202204212688) | Apr 21, 2022 | Completed: final sign-off Nov 2022 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) | revision to pa# 201809140223. revise shear wall location along grid c. add grade beam along grid 3.75. revise shear wall length along grid a. | $2,000 |
| [202203291156](https://www.permitgraph.org/p/202203291156) | Mar 29, 2022 | Completed: final sign-off Aug 2022 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Quintanilla Builders Inc](https://www.permitgraph.org/contractor/quintanilla-builders-inc-1048308) | unit 102. rehab (e) kitchen, rehab (e) bathroom. convert (e) dining to nook, install washer/dryer. | $23,000 |
| [202203099597](https://www.permitgraph.org/p/202203099597) | Mar 9, 2022 | Never finaled: issued Mar 2022, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [All Star Fire Protection Llc](https://www.permitgraph.org/contractor/all-star-fire-protection-llc-1023631) | install new fire sprinklers throughout ground floor adu unit per nfpa 13 2016 including two inch dedicated system per nfpa24. ref pa#202003116820 | $14,500 |
| [202105140423](https://www.permitgraph.org/p/202105140423) | May 14, 2021 | Completed: final sign-off Oct 2021 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit #204 - 3rd flr: convert existing kitchen to study, relocate kitchen, rehabilitate existing bathroom, install washer and dryer. | $40,000 |
| [202102195032](https://www.permitgraph.org/p/202102195032) | Feb 19, 2021 | Completed: final sign-off Oct 2021 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit #101: 1) convert extg kitchen study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $38,000 |
| [202003116820](https://www.permitgraph.org/p/202003116820) | Mar 11, 2020 | Completed: final sign-off Dec 2023 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) | convert (e) 2 car garage into (4) adu's per ordiance 162-16. for a building total of 19 units. | $200,000 |
| [201811095521](https://www.permitgraph.org/p/201811095521) | Nov 9, 2018 | Never finaled: filed Nov 2018, never issued | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) |  | per adu ordinance# 162-16, 3 adu (two-1 bedroom & one studio) to be added to (e) ground floor. new 3 street trees. existing curb cut to be eliminated. | $24,100 |
| [201809140223](https://www.permitgraph.org/p/201809140223) | Sep 14, 2018 | Completed: final sign-off Nov 2022 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) | soft story retrofit using iebc a4 | $85,000 |
| [201808177639](https://www.permitgraph.org/p/201808177639) | Aug 17, 2018 | Completed: final sign-off Jan 2019 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Au Electric Corporation/Aec Alarms](https://www.permitgraph.org/contractor/au-electric-corporation-aec-alarms-381840) | upgrade existing fire alarm to comply with 1103.7.6.1 | $25,000 |
| [201803143644](https://www.permitgraph.org/p/201803143644) | Mar 14, 2018 | Never finaled: issued Mar 2018, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [J C Tan Builders](https://www.permitgraph.org/contractor/j-c-tan-builders-496957) | unit # 302: replace existing kitchen cabinets, replace (e) plumbing fixtures, new sub-panel. no walls moved, removed, added or installed. all (e) layout to remain unchanged. | $30,000 |
| [201710161329](https://www.permitgraph.org/p/201710161329) | Oct 16, 2017 | Never finaled: issued Oct 2017, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | unit #301: convert e kitchen to bedroom, relocate kitchen, rehab existing bath, install washer dryer | $32,000 |
| [201604225463](https://www.permitgraph.org/p/201604225463) | Apr 22, 2016 | Completed: final sign-off Aug 2016 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Kong's Plumbing & Construction Co.](https://www.permitgraph.org/contractor/kong-s-plumbing-construction-co-671225) | unit #203 at 3rd floor: remodel extg bathroom. remodel extg kitchen, and add washer and dryer. | $25,000 |
| [201512074331](https://www.permitgraph.org/p/201512074331) | Dec 7, 2015 | Completed: final sign-off Mar 2016 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | remodel unit 201 @ 3rd floor - add washer & dryer, remodel existing bathroom, remodel existing ktichen. | $15,000 |
| [201408063221](https://www.permitgraph.org/p/201408063221) | Aug 6, 2014 | Never finaled: issued Aug 2014, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | remodeling in unit #103: add bedroom and closet. relocating kitchen fixtures and cabinets. | $15,000 |
| [201408063220](https://www.permitgraph.org/p/201408063220) | Aug 6, 2014 | Never finaled: issued Aug 2014, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | remodeling in unit#105: add bedroom and closet. relocating kitchen fixtures and cabinets. | $15,000 |
| [201408063219](https://www.permitgraph.org/p/201408063219) | Aug 6, 2014 | Never finaled: issued Aug 2014, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | remodeling in unit#205: add bedroom and closet. relocating kitchen fixtures and cabinets. | $15,000 |
| [201408063217](https://www.permitgraph.org/p/201408063217) | Aug 6, 2014 | Never finaled: issued Aug 2014, no final | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | remodeling in unit#303: add bedroom and closet. relocating kitchen fixtures and cabinets. | $15,000 |
| [201111299656](https://www.permitgraph.org/p/201111299656) | Nov 29, 2011 | Completed: final sign-off Dec 2011 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Andonian Construction](https://www.permitgraph.org/contractor/andonian-construction-600160) | roof deck repair take out about 50 sf 1x8 lath on the roof deck with 3/4 plywood. 8 penny nails. | $1,000 |
| [201111299653](https://www.permitgraph.org/p/201111299653) | Nov 29, 2011 | Completed: final sign-off Dec 2011 | [140 Duboce Av](https://www.permitgraph.org/a/3502/024) | [Andonian Construction](https://www.permitgraph.org/contractor/andonian-construction-600160) | reroofing | $18,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) (6), [Hon's Construction Inc.](https://www.permitgraph.org/contractor/hon-s-construction-inc-424595) (3), [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) (3), [All Star Fire Protection Llc](https://www.permitgraph.org/contractor/all-star-fire-protection-llc-1023631) (2), [Andonian Construction](https://www.permitgraph.org/contractor/andonian-construction-600160) (2), [Au Electric Corporation/Aec Alarms](https://www.permitgraph.org/contractor/au-electric-corporation-aec-alarms-381840) (2), [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) (2), [J C Tan Builders](https://www.permitgraph.org/contractor/j-c-tan-builders-496957), [Kong's Plumbing & Construction Co.](https://www.permitgraph.org/contractor/kong-s-plumbing-construction-co-671225), [Quintanilla Builders Inc](https://www.permitgraph.org/contractor/quintanilla-builders-inc-1048308)
- Architects: [Wing Lee](https://www.permitgraph.org/professional/wing-lee-C28929)
- Engineers: [Joe Win Kon](https://www.permitgraph.org/professional/joe-win-kon-S5425) (3)
- Designers: [Juan Vasquez](https://www.permitgraph.org/professional/juan-vasquez-1023631)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/3502/024.