# 95 Midcrest Way

Block 2822A, lot 033. Page: https://www.permitgraph.org/a/2822A/033

- City's use: Single Family Residential
- Built: 1961
- Stories: 2
- Units: 1
- Rooms: 2 bedrooms, 2 bathrooms
- Building: 1,378 sq ft
- Lot: 2,652 sq ft
- Zoning: RH1
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202604159441](https://www.permitgraph.org/p/202604159441) | Apr 15, 2026 | Completed: final sign-off Jul 2026 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) |  | replace garage door. in kind same opening. street facing. | $3,000 |
| [202107224913](https://www.permitgraph.org/p/202107224913) | Jul 22, 2021 | Expired or cancelled: cancelled Jan 2026 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Tesla Energy Operations](https://www.permitgraph.org/contractor/tesla-energy-operations-888104) | install mount battery energy storage system 27 kwh powerwall 2 | $15,000 |
| [201908199183](https://www.permitgraph.org/p/201908199183) | Aug 19, 2019 | Expired or cancelled: cancelled Nov 2022 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Tesla Energy Operations](https://www.permitgraph.org/contractor/tesla-energy-operations-888104) | install solar panels 4.095 kw (13 panels) energy storage system 27 kwh (2 powerwall) +125a load center |  |
| [201801057932](https://www.permitgraph.org/p/201801057932) | Jan 5, 2018 | Completed: final sign-off Aug 2018 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Hammerhouse Construction](https://www.permitgraph.org/contractor/hammerhouse-construction-804459) | installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comp… | $70,000 |
| [201507060654](https://www.permitgraph.org/p/201507060654) | Jul 6, 2015 | Completed: final sign-off Oct 2015 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Terence Mcmahon Construction](https://www.permitgraph.org/contractor/terence-mcmahon-construction-797580) | remodel bathroom on ground floor. | $10,000 |
| [201501307067](https://www.permitgraph.org/p/201501307067) | Jan 30, 2015 | Completed: final sign-off Oct 2015 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Terence Mcmahon Construction](https://www.permitgraph.org/contractor/terence-mcmahon-construction-797580) | replace side door at ground level in kind, demo ^ replace stucco at side for water proofing, approx. 400 sq.ft. | $8,000 |
| [200911020281](https://www.permitgraph.org/p/200911020281) | Nov 2, 2009 | Completed: final sign-off Mar 2010 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Grand Roofing Inc.](https://www.permitgraph.org/contractor/grand-roofing-inc-533105) | reroofing. | $6,380 |
| [200403088031](https://www.permitgraph.org/p/200403088031) | Mar 8, 2004 | Completed: final sign-off Jun 2004 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) |  | rev. to pa#2003/12/09/1910 - steel posts and structure substituted by wood, in proposed deck |  |
| [200312091910](https://www.permitgraph.org/p/200312091910) | Dec 9, 2003 | Completed: final sign-off Jun 2004 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) |  | construction of deck at side/rear yard | $4,300 |
| [200304102002](https://www.permitgraph.org/p/200304102002) | Apr 10, 2003 | Completed: final sign-off Jun 2003 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) |  | constuction of computer rm ibasement, building of full bathrm in basement :renew:9822767 | $6,000 |
| [200211151542](https://www.permitgraph.org/p/200211151542) | Nov 15, 2002 | Completed: final sign-off Dec 2002 | [95 Midcrest Wy](https://www.permitgraph.org/a/2822A/033) | [Alexander Company](https://www.permitgraph.org/contractor/alexander-company-642553) | 7 windows to be replaced size for size. visible from the street. | $4,050 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Terence Mcmahon Construction](https://www.permitgraph.org/contractor/terence-mcmahon-construction-797580) (2), [Tesla Energy Operations](https://www.permitgraph.org/contractor/tesla-energy-operations-888104) (2), [Alexander Company](https://www.permitgraph.org/contractor/alexander-company-642553), [Grand Roofing Inc.](https://www.permitgraph.org/contractor/grand-roofing-inc-533105), [Hammerhouse Construction](https://www.permitgraph.org/contractor/hammerhouse-construction-804459)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/2822A/033.
