# 176 Edgewood Ave

Block 2642, lot 030. Page: https://www.permitgraph.org/a/2642/030

- City's use: Single Family Residential
- Built: 1907
- Stories: 2
- Units: 1
- Rooms: 5 bedrooms, 3 bathrooms
- Building: 3,095 sq ft
- Lot: 2,378 sq ft
- Zoning: RH1D
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

25 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202105180502](https://www.permitgraph.org/p/202105180502) | May 18, 2021 | Completed: final sign-off Sep 2021 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Toschi Construction](https://www.permitgraph.org/contractor/toschi-construction-1021048) | bathroom remodel: no moving of plumbing and electrical. no reconfiguration. no change of wall and openings. | $30,000 |
| [201810011863](https://www.permitgraph.org/p/201810011863) | Oct 1, 2018 | Completed: final sign-off Apr 2019 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Mc Cutcheon Construction Co.](https://www.permitgraph.org/contractor/mc-cutcheon-construction-co-528791) | interior remodel of guest bathroom @ 2nd floor | $15,000 |
| [201806061131](https://www.permitgraph.org/p/201806061131) | Jun 6, 2018 | Completed: final sign-off Apr 2019 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Mc Cutcheon Construction Co.](https://www.permitgraph.org/contractor/mc-cutcheon-construction-co-528791) | replace e dry rot joists and decking, install code compliant guardrail same location, same materirals, less than 50% at rear yard | $20,000 |
| [201608094540](https://www.permitgraph.org/p/201608094540) | Aug 9, 2016 | Completed: final sign-off Aug 2016 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Caldwell Roland Roofing](https://www.permitgraph.org/contractor/caldwell-roland-roofing-336301) | reroofing | $10,000 |
| [M695150](https://www.permitgraph.org/p/M695150) | May 31, 2016 | Never finaled: issued May 2016, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | steep space |  |
| [201604205268](https://www.permitgraph.org/p/201604205268) | Apr 20, 2016 | Completed: final sign-off Apr 2016 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | to obtain final inspection for work approved under app#200707278047. all work is complete. |  |
| [M675227](https://www.permitgraph.org/p/M675227) | Mar 22, 2016 | Never finaled: issued Mar 2016, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space permit |  |
| [M665267](https://www.permitgraph.org/p/M665267) | Feb 19, 2016 | Never finaled: issued Feb 2016, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space permit |  |
| [201512316253](https://www.permitgraph.org/p/201512316253) | Dec 31, 2015 | Completed: final sign-off Sep 2016 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Mc Cutcheon Construction Co.](https://www.permitgraph.org/contractor/mc-cutcheon-construction-co-528791) | relocate front door, enclose portion of covered porch, minor roof repair | $60,000 |
| [M452767](https://www.permitgraph.org/p/M452767) | Dec 20, 2013 | Never finaled: issued Dec 2013, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space |  |
| [201310300665](https://www.permitgraph.org/p/201310300665) | Oct 30, 2013 | Completed: final sign-off Jul 2016 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Mc Cutcheon Construction Co.](https://www.permitgraph.org/contractor/mc-cutcheon-construction-co-528791) | partial removal of walls at ground floor level stair. partial of ground level to be lowered 15". remodel extg bath, new partial bathroom and laundry room. addition of new balcony at rear yard. new hv… | $325,000 |
| [200906150457](https://www.permitgraph.org/p/200906150457) | Jun 15, 2009 | Completed: final sign-off Feb 2010 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | replace cabinets and floor, kitchen remodel | $35,000 |
| [M118624](https://www.permitgraph.org/p/M118624) | May 5, 2008 | Never finaled: issued May 2008, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | sidewalk permit. |  |
| [M92266](https://www.permitgraph.org/p/M92266) | Oct 23, 2007 | Never finaled: issued Oct 2007, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space permit only. |  |
| [200707278047](https://www.permitgraph.org/p/200707278047) | Jul 27, 2007 | Never finaled: issued Jul 2007, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Demex Engineering, Inc](https://www.permitgraph.org/contractor/demex-engineering-inc-801240) | site retaining wall for 5' retaining height 18"x16' deep pier located along common property line with 23 belmont avenue | $50,000 |
| [200705010129](https://www.permitgraph.org/p/200705010129) | May 1, 2007 | Completed: final sign-off Sep 2008 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | replace extg stucco and brick veneer exterior finishes with new wood shiplap and brick. repair dryrot to extg framing and sheathing,replace w/ new conc. foudation as indecated on plan, voluntary stru… | $30,000 |
| [M38403](https://www.permitgraph.org/p/M38403) | Jul 6, 2006 | Never finaled: issued Jul 2006, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space permit only. |  |
| [200601122012](https://www.permitgraph.org/p/200601122012) | Jan 12, 2006 | Completed: final sign-off Nov 2006 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | master bath interior renovation/replacement of closet doors in master bdrm/replacement of skylight valence in stair #2 | $7,000 |
| [200508220763](https://www.permitgraph.org/p/200508220763) | Aug 22, 2005 | Completed: final sign-off Sep 2005 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Excelsior Roofing Company](https://www.permitgraph.org/contractor/excelsior-roofing-company-448397) | reroofing | $8,750 |
| [200505051705](https://www.permitgraph.org/p/200505051705) | May 5, 2005 | Expired or cancelled: expired May 2007 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Teevan Company](https://www.permitgraph.org/contractor/teevan-company-310859) | replace wood shingle siding at north wall not visible from the strr | $6,000 |
| [M30916](https://www.permitgraph.org/p/M30916) | Jan 24, 2005 | Never finaled: issued Jan 2005, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | streetspace |  |
| [M29230](https://www.permitgraph.org/p/M29230) | Sep 14, 2004 | Never finaled: issued Sep 2004, no final | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | street space |  |
| [200405113507](https://www.permitgraph.org/p/200405113507) | May 11, 2004 | Completed: final sign-off May 2005 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) |  | repair of rear deck due to dryrot/replacement in kind of wndws at rear facade only/nw wood shingle | $20,000 |
| [200402277371](https://www.permitgraph.org/p/200402277371) | Feb 27, 2004 | Completed: final sign-off May 2004 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [Teevan Company](https://www.permitgraph.org/contractor/teevan-company-310859) | remodel bathroom- change fixtures & replace tub.install tiles around tub @ 3 walls only | $10,000 |
| [200212032668](https://www.permitgraph.org/p/200212032668) | Dec 3, 2002 | Completed: final sign-off Dec 2002 | [176 Edgewood Av](https://www.permitgraph.org/a/2642/030) | [House To Home Remodeling](https://www.permitgraph.org/contractor/house-to-home-remodeling-573143) | replace single glassed alumium slider with marvin trim line insulate door open onto existing deck re | $6,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Mc Cutcheon Construction Co.](https://www.permitgraph.org/contractor/mc-cutcheon-construction-co-528791) (4), [Teevan Company](https://www.permitgraph.org/contractor/teevan-company-310859) (2), [Caldwell Roland Roofing](https://www.permitgraph.org/contractor/caldwell-roland-roofing-336301), [Demex Engineering, Inc](https://www.permitgraph.org/contractor/demex-engineering-inc-801240), [Excelsior Roofing Company](https://www.permitgraph.org/contractor/excelsior-roofing-company-448397), [House To Home Remodeling](https://www.permitgraph.org/contractor/house-to-home-remodeling-573143), [Toschi Construction](https://www.permitgraph.org/contractor/toschi-construction-1021048)
- Architects: [Chr Dauer Architect](https://www.permitgraph.org/professional/chr-dauer-architect-C28302)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/2642/030.
