# 50 Cutler Ave

Block 2449, lot 037. Page: https://www.permitgraph.org/a/2449/037

- City's use: Multi-Family Residential
- Built: 1927
- Stories: 2
- Units: 12
- Rooms: 12 bathrooms
- Building: 8,306 sq ft
- Lot: 8,925 sq ft
- Zoning: RH2
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202110069922](https://www.permitgraph.org/p/202110069922) | Oct 6, 2021 | Completed: final sign-off Jun 2022 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Commercial Fire Protection Inc](https://www.permitgraph.org/contractor/commercial-fire-protection-inc-925234) | install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $36,000 |
| [M1067827](https://www.permitgraph.org/p/M1067827) | Apr 17, 2019 | Never finaled: issued Apr 2019, no final | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) |  | street space |  |
| [201602290802](https://www.permitgraph.org/p/201602290802) | Feb 29, 2016 | Completed: final sign-off May 2016 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778) | to comply with nov 201578471: repair areas of falling concrete and loose masonary on west and south facade. waterproof and paint bldg after repair | $78,000 |
| [201502178523](https://www.permitgraph.org/p/201502178523) | Feb 17, 2015 | Expired or cancelled: expired Feb 2017 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Standardconstr/Standardroof](https://www.permitgraph.org/contractor/standardconstr-standardroof-348544) | r e r o o f i n g --layer #30 asphalt saturated felt underlayment. install shingles as per manufactures specifications. this roofing has a class a fire rating. all roofs new or replacment with slope… | $32,000 |
| [201408214373](https://www.permitgraph.org/p/201408214373) | Aug 21, 2014 | Expired or cancelled: expired Feb 2017 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [The Window Specialist](https://www.permitgraph.org/contractor/the-window-specialist-494843) | retrofit 1 double hung vinyl window in kitchen, u factor < .32 at the same opening & style. not visible from street & meets title 24 | $500 |
| [201404022246](https://www.permitgraph.org/p/201404022246) | Apr 2, 2014 | Completed: final sign-off May 2014 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [American Technologies Inc](https://www.permitgraph.org/contractor/american-technologies-inc-571784) | #105. install drywall in living room, hall, bathroom, refinish wood floors, reset light fixtures, paint to match existing. due to water damage total area of drywall is 200 sf. #201. remove kitchen ca… | $6,500 |
| [201109225254](https://www.permitgraph.org/p/201109225254) | Sep 22, 2011 | Never finaled: issued Sep 2011, no final | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | #103 - remodel kitchen to remove & replace cabinets. no structural work & no walls relcoation. no new lighting. | $13,000 |
| [201101108135](https://www.permitgraph.org/p/201101108135) | Jan 10, 2011 | Completed: final sign-off Apr 2011 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | unit #202 -install g.f.c.i./subpanel, remove & replace kitchen cabinets, no structural work, no new lighting. | $18,000 |
| [201012015923](https://www.permitgraph.org/p/201012015923) | Dec 1, 2010 | Completed: final sign-off Jan 2011 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | install gfci & sub-panel, remoce & replace kitchen cabinets, no structural work, no new lighting in unit #203 | $18,000 |
| [200910280034](https://www.permitgraph.org/p/200910280034) | Oct 28, 2009 | Completed: final sign-off Jan 2010 | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883) | kitchen remodel, cabinets, counter top, replace angle strip, sink, faucet, p-trap,supply lines, new gas loop. bathroom remodel, replace sink, faucet, faucet, p-trap, supply lines, new low flow toilet… | $15,500 |
| [200509304364](https://www.permitgraph.org/p/200509304364) | Sep 30, 2005 | Never finaled: issued Sep 2005, no final | [50 Cutler Av](https://www.permitgraph.org/a/2449/037) | [S'top Home Service Roofing Co. Inc.](https://www.permitgraph.org/contractor/s-top-home-service-roofing-co-inc-688301) | reroofing | $6,780 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) (3), [American Technologies Inc](https://www.permitgraph.org/contractor/american-technologies-inc-571784), [Commercial Fire Protection Inc](https://www.permitgraph.org/contractor/commercial-fire-protection-inc-925234), [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778), [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883), [S'top Home Service Roofing Co. Inc.](https://www.permitgraph.org/contractor/s-top-home-service-roofing-co-inc-688301), [Standardconstr/Standardroof](https://www.permitgraph.org/contractor/standardconstr-standardroof-348544), [The Window Specialist](https://www.permitgraph.org/contractor/the-window-specialist-494843)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/a/2449/037.
