# 2299 19th Ave

Block 2330, lot 006A. Page: https://www.permitgraph.org/a/2330/006A

- City's use: Commercial Office
- Built: 1948
- Stories: 1
- Units: 1
- Rooms: 3 bathrooms
- Building: 4,949 sq ft
- Lot: 7,901 sq ft
- Zoning: RH2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

9 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202312293287](https://www.permitgraph.org/p/202312293287) | Dec 29, 2023 | In progress: filed Dec 2023, not yet issued | [800 Santiago St](https://www.permitgraph.org/a/2330/006A) | [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) | (#b) abe checklist response 202301045947. power assist door adjusted to be less than 8.5 pounds. threshold less or equal then 1/2". new door push plates | $2,000 |
| [202312293289](https://www.permitgraph.org/p/202312293289) | Dec 29, 2023 | In progress: filed Dec 2023, not yet issued | [800 Santiago St](https://www.permitgraph.org/a/2330/006A) | [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) | (#a) abe checklist response 202301055989. new threshold max 1/2". sidewalk to be repaired smooth and level per da .04 power door operator installed. | $5,000 |
| [202312293294](https://www.permitgraph.org/p/202312293294) | Dec 29, 2023 | In progress: filed Dec 2023, not yet issued | [2299 19th Av](https://www.permitgraph.org/a/2330/006A) | [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) | abe checklist per response. new path from 19th ave to extg building front entry. relocate doors to provide 4 feet o between int. stair and entry door. new entry door ada accessible threshhold and har… | $7,000 |
| [202110070023](https://www.permitgraph.org/p/202110070023) | Oct 7, 2021 | Completed: final sign-off Dec 2021 | [800 Santiago St](https://www.permitgraph.org/a/2330/006A) | [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) | repair of sheet metal copping and stucco at rear of building. | $900 |
| [M1175427](https://www.permitgraph.org/p/M1175427) | Dec 13, 2019 | Never finaled: issued Dec 2019, no final | [800 Santiago St](https://www.permitgraph.org/a/2330/006A) |  | per pg&e and dbi record, add address to block 2330, lot 006a as; 800 santiago street a & b. |  |
| [201710050453](https://www.permitgraph.org/p/201710050453) | Oct 5, 2017 | Completed: final sign-off Oct 2017 | [2299 19th Av](https://www.permitgraph.org/a/2330/006A) | [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) | inkind replacement of 7 front 6'x6' posts on front facade due to dry rot | $7,600 |
| [201501155899](https://www.permitgraph.org/p/201501155899) | Jan 15, 2015 | Completed: final sign-off Mar 2015 | [2299 19th Av](https://www.permitgraph.org/a/2330/006A) | [D B I Contracting Inc](https://www.permitgraph.org/contractor/d-b-i-contracting-inc-990524) | #a - barrier removal, create accessible operatory room, upgrade entrance, install grab bars, provide signage. n/a maher ordinance | $28,000 |
| [201203146082](https://www.permitgraph.org/p/201203146082) | Mar 14, 2012 | Completed: final sign-off May 2012 | [2299 19th Av](https://www.permitgraph.org/a/2330/006A) |  | suite#3- install (replace 4-dental chairs, widen office entrance door & remodel (e) restroom for ada compliance. | $12,000 |
| [201003037470](https://www.permitgraph.org/p/201003037470) | Mar 3, 2010 | Completed: final sign-off Mar 2010 | [2299 19th Av](https://www.permitgraph.org/a/2330/006A) | [Standard Termite & Pest Control](https://www.permitgraph.org/contractor/standard-termite-pest-control-10133) | repair window frames & dry rot only, exterior stucco on south side. no moving or adding walls | $1,500 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Muldoon Construction Inc](https://www.permitgraph.org/contractor/muldoon-construction-inc-1007483) (5), [D B I Contracting Inc](https://www.permitgraph.org/contractor/d-b-i-contracting-inc-990524), [Standard Termite & Pest Control](https://www.permitgraph.org/contractor/standard-termite-pest-control-10133)
- Engineers: [Tim O'sullivan](https://www.permitgraph.org/professional/tim-o-sullivan-C35235)

---