# 445 Hugo St

Block 1754, lot 022. Page: https://www.permitgraph.org/a/1754/022

- City's use: Multi-Family Residential
- Built: 1923
- Stories: 3
- Units: 9
- Rooms: 9 bathrooms
- Building: 8,064 sq ft
- Lot: 3,323 sq ft
- Zoning: RH2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

7 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202506058018](https://www.permitgraph.org/p/202506058018) | Jun 5, 2025 | Completed: final sign-off Dec 2025 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) | [Byington Electric Corp](https://www.permitgraph.org/contractor/byington-electric-corp-253479) | replace the (e) f/a system w/a new f/a system to the sf/ca code interpretation 1103.6.71 and add the lf horns inside of the units & wireless monitoring | $50,000 |
| [202503263036](https://www.permitgraph.org/p/202503263036) | Mar 26, 2025 | Completed: final sign-off Dec 2025 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) | [Jon K Takata Corp Dba Restoration Mgmt](https://www.permitgraph.org/contractor/jon-k-takata-corp-dba-restoration-mgmt-765595) | unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace d… | $400,000 |
| [202203149973](https://www.permitgraph.org/p/202203149973) | Mar 14, 2022 | Completed: final sign-off Aug 2022 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) | [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776) | unit 1: kitchen and bathroom remodel in kind. | $30,000 |
| [201603020958](https://www.permitgraph.org/p/201603020958) | Mar 2, 2016 | Completed: final sign-off Nov 2016 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) | [Roberto De Leon](https://www.permitgraph.org/contractor/roberto-de-leon-909601) | soft sotry retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4. soft sotry seismic retrofit per sf ordinance 66-13 sf bldg code chapter 34b & sf ab 106-107 analysis per iebc a-4 | $105,000 |
| [M64924](https://www.permitgraph.org/p/M64924) | Apr 19, 2007 | Never finaled: issued Apr 2007, no final | [445 Hugo St](https://www.permitgraph.org/a/1754/022) |  | street space and sidewalk permit |  |
| [200311261165](https://www.permitgraph.org/p/200311261165) | Nov 26, 2003 | Completed: final sign-off Jan 2004 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) |  | revision of app # 200308041159/add post connection detail and as built handrail revision |  |
| [200308041159](https://www.permitgraph.org/p/200308041159) | Aug 4, 2003 | Completed: final sign-off Jan 2004 | [445 Hugo St](https://www.permitgraph.org/a/1754/022) |  | repair or replace existing dry-rotten stair & corridor, in kind | $12,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776), [Byington Electric Corp](https://www.permitgraph.org/contractor/byington-electric-corp-253479), [Jon K Takata Corp Dba Restoration Mgmt](https://www.permitgraph.org/contractor/jon-k-takata-corp-dba-restoration-mgmt-765595), [Roberto De Leon](https://www.permitgraph.org/contractor/roberto-de-leon-909601)
- Engineers: [Jeremy Andreasen](https://www.permitgraph.org/professional/jeremy-andreasen-5123), [W.Charles Perry](https://www.permitgraph.org/professional/w-charles-perry-C38622)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/1754/022.
