# 6221 Geary Blvd

Block 1518, lot 033. Page: https://www.permitgraph.org/a/1518/033

- City's use: Commercial Office
- Built: 1969
- Stories: 3
- Building: 17,760 sq ft
- Lot: 7,600 sq ft
- Zoning: NC3
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

33 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202605121120](https://www.permitgraph.org/p/202605121120) | May 12, 2026 | In progress: issued Oct 2026 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Kevin J Barry Ironworks](https://www.permitgraph.org/contractor/kevin-j-barry-ironworks-742590) | removal of existing roof gaurdrail (150 l.f.0) & replace with in kind steel guardrail to code compliance height of 42" | $20,000 |
| [202604169549](https://www.permitgraph.org/p/202604169549) | Apr 16, 2026 | In progress: issued Apr 2026 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Invertice Inc](https://www.permitgraph.org/contractor/invertice-inc-1064172) | to obtain final inspection for work approved under pa 202209263093. all work is complete. |  |
| [202401174074](https://www.permitgraph.org/p/202401174074) | Jan 17, 2024 | Completed: final sign-off Jan 2024 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | reroofing | $15,000 |
| [202311271372](https://www.permitgraph.org/p/202311271372) | Nov 27, 2023 | Completed: final sign-off Apr 2024 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Rod Muscio Electrical](https://www.permitgraph.org/contractor/rod-muscio-electrical-309056) | voluntary fire alarm system replacement like for like | $10,000 |
| [202306230722](https://www.permitgraph.org/p/202306230722) | Jun 23, 2023 | Completed: final sign-off Jan 2024 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776) | alteration to replace (e) sliding door with pair narrow stile aluminum doors with new door frame. | $40,000 |
| [202305157794](https://www.permitgraph.org/p/202305157794) | May 15, 2023 | Completed: final sign-off Oct 2024 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776) | repair in kind drywall in office to comply with nov 202306948 & nov#202307446. | $2,000 |
| [202209263093](https://www.permitgraph.org/p/202209263093) | Sep 26, 2022 | Never finaled: issued Oct 2022, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Invertice Inc](https://www.permitgraph.org/contractor/invertice-inc-1064172) | at&t modification of an unmanned telecom facility consisting of remove & replace (6) antennas, relocate (3) antennas, install(4) (n) frp boxes (a&c) install (n) rf safety signs barricades & stripping… | $65,000 |
| [202203301203](https://www.permitgraph.org/p/202203301203) | Mar 30, 2022 | Expired or cancelled: cancelled Jan 2026 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776) | remove drywall class room, install new drywall in classroom #fd2 only | $7,500 |
| [202203150004](https://www.permitgraph.org/p/202203150004) | Mar 15, 2022 | Completed: final sign-off Mar 2022 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Electric Tech Construction Inc](https://www.permitgraph.org/contractor/electric-tech-construction-inc-897792) | to obtain final inspection for work approved under pa 201608044212. all work is complete |  |
| [202108055829](https://www.permitgraph.org/p/202108055829) | Aug 5, 2021 | Completed: final sign-off Apr 2024 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Yupana Inc](https://www.permitgraph.org/contractor/yupana-inc-1028016) | modify existing wireless telecom facility. replace 3 antennas, replace 3 rrus, add 3 rrus, add 2 ovps, add 2 hybrid cables. at base station: remove 3 rrus, add 3 combiners. | $80,500 |
| [201906113058](https://www.permitgraph.org/p/201906113058) | Jun 11, 2019 | Completed: final sign-off Aug 2019 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Hoi's Construction](https://www.permitgraph.org/contractor/hoi-s-construction-745380) | to combine (e) breakrooms & office into new code compliant breakroom.new cabinets,appliances, sinks/fauce6ts.remodel 2 (e) childrens toilets for code compliance.new sinks,toilets & privacy screen bet… | $66,235 |
| [201903205794](https://www.permitgraph.org/p/201903205794) | Mar 20, 2019 | Completed: final sign-off Aug 2022 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Qualtek Wireless Llc.](https://www.permitgraph.org/contractor/qualtek-wireless-llc-1042849), [Broken Arrow Communications Inc](https://www.permitgraph.org/contractor/broken-arrow-communications-inc-853651) | remove/replace 9 extg antennas. install 24 radio units (at equipment). new telco fiber equipment. | $43,500 |
| [201812037286](https://www.permitgraph.org/p/201812037286) | Dec 3, 2018 | Expired or cancelled: cancelled Aug 2023 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | ref pa# 200608048633; assemble occupancy of 3rd fl. to the rest of the building, |  |
| [201809190751](https://www.permitgraph.org/p/201809190751) | Sep 19, 2018 | Expired or cancelled: cancelled Aug 2023 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | 3/f: as-built fire sprinklers to present current layout, specificying the number and location of f/s and set and calculate the max. occupancy for an assembly permit. |  |
| [201608044212](https://www.permitgraph.org/p/201608044212) | Aug 4, 2016 | Expired or cancelled: expired Mar 2022 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Electric Tech Construction Inc](https://www.permitgraph.org/contractor/electric-tech-construction-inc-897792) | modification to an extg at&t facility including: removing/replacing 6 extg antennas(like for like swapp). installing 6 new rrus. other minor upgrades at antennas and equipment room(surge suppressors,… | $58,000 |
| [201601076542](https://www.permitgraph.org/p/201601076542) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Community Playgrounds Inc.](https://www.permitgraph.org/contractor/community-playgrounds-inc-362950) | install (1) 14x14 shade structure outside of the building on the playground. | $15,000 |
| [201509288201](https://www.permitgraph.org/p/201509288201) | Sep 28, 2015 | Never finaled: issued Sep 2015, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Community Playgrounds Inc.](https://www.permitgraph.org/contractor/community-playgrounds-inc-362950) | 1)remove extg artificial turf. 2)install pour in place rubber surfacing. 3)install per manufacturer instructions. | $13,000 |
| [201508053413](https://www.permitgraph.org/p/201508053413) | Aug 5, 2015 | Completed: final sign-off Apr 2016 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Triton Tower Inc](https://www.permitgraph.org/contractor/triton-tower-inc-794622) | modification to (e) at&t facility including: r&r 3 (e) antennas with 3 new antennas (behind (e) screening); installing 3 new rru's on roof; installing 3 new surge suppressors on roof and 1 new surge… | $22,000 |
| [M606987](https://www.permitgraph.org/p/M606987) | Jul 23, 2015 | Never finaled: issued Jul 2015, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | street space |  |
| [201405297025](https://www.permitgraph.org/p/201405297025) | May 29, 2014 | Completed: final sign-off Feb 2015 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Electric Tech Construction Inc](https://www.permitgraph.org/contractor/electric-tech-construction-inc-897792) | modification to an (e) at&t facility consisting of: remove/replacing 9 (e) antennas with 9 (n) antennas, installing 3 (n) rrus with a-2 modules, install 1 (n) dus-41 unit in an (e) cabinet. | $22,000 |
| [201309197263](https://www.permitgraph.org/p/201309197263) | Sep 19, 2013 | Never finaled: issued Jul 2015, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117) | remove & replace three (3) existing antenna & re-use existing six (6). installation of three (3) remote radio unit, two (2) surge protection , one (1) hybrid cable and one (1) ret cable. verizon wire… | $10,000 |
| [201208137224](https://www.permitgraph.org/p/201208137224) | Aug 13, 2012 | Expired or cancelled: cancelled Jun 2015 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Electric Tech Construction Inc](https://www.permitgraph.org/contractor/electric-tech-construction-inc-897792) | remove & replace 6 (e) antennas behind existing screening. add 6 (n) rru's near the antennas. install one (n) 6601 unit in an (e) rack in equipment room. | $15,000 |
| [201202274907](https://www.permitgraph.org/p/201202274907) | Feb 27, 2012 | Completed: final sign-off Mar 2012 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872) | new layout for installation of lte cabinet per pa#201004089881 | $3,000 |
| [201012307652](https://www.permitgraph.org/p/201012307652) | Dec 30, 2010 | Completed: final sign-off Mar 2012 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Cba Site Services Inc.](https://www.permitgraph.org/contractor/cba-site-services-inc-455726) | remove and replace (3) antennas. remove (3) radomes and install new frp screen wall. add (6) rru's, (3) surge suppresors, new innerducts, add (n) 6601 rbs equipment cabinet into an (e) 19" rack. | $65,000 |
| [M219366](https://www.permitgraph.org/p/M219366) | Sep 3, 2010 | Never finaled: issued Sep 2010, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | street space permit |  |
| [M212246](https://www.permitgraph.org/p/M212246) | Jul 22, 2010 | Never finaled: issued Jul 2010, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | street space |  |
| [201007217141](https://www.permitgraph.org/p/201007217141) | Jul 21, 2010 | Completed: final sign-off Mar 2012 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [Cba Site Services Inc.](https://www.permitgraph.org/contractor/cba-site-services-inc-455726) | modification to e unmanned telecomm facility consisting of removing e toma equip and adding 6 n tmae 6 n coax cables,3 n radomes, 6 n frp boxes, add 4 n rets remote elec tilt, to antennas. ret powere… | $65,000 |
| [201004089881](https://www.permitgraph.org/p/201004089881) | Apr 8, 2010 | Completed: final sign-off Nov 2010 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117) | verizon. installation of a wireless communications facility with 6 new panel antennas on parapet wall enclaved in radones and 3 panel antennas mounted on the face of the building w/ stealth enclosure… | $250,000 |
| [200906180754](https://www.permitgraph.org/p/200906180754) | Jun 18, 2009 | Expired or cancelled: cancelled Sep 2016 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | modification of (e) telecom facility consisting of adding 2 new remote radio units (rru's), 1 new 3518 radio cabinet, new screening walls in front of (e) antennas. new runs of coax inside, new cable… | $5,000 |
| [200901160346](https://www.permitgraph.org/p/200901160346) | Jan 16, 2009 | Expired or cancelled: cancelled Dec 2011 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) |  | install new coax cables, install new rets, install new tma's. no visual impact from street level. | $5,000 |
| [200802154914](https://www.permitgraph.org/p/200802154914) | Feb 15, 2008 | Never finaled: issued Feb 2008, no final | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [J M A Construction](https://www.permitgraph.org/contractor/j-m-a-construction-743286) | application is for minor revision to building pa# 200608048633, revision clarifies intent to install 1 new smoke guard and 1 local smoke detector at (e) 3rd floor elevator |  |
| [200801162639](https://www.permitgraph.org/p/200801162639) | Jan 16, 2008 | Completed: final sign-off Jun 2008 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [J M A Construction](https://www.permitgraph.org/contractor/j-m-a-construction-743286) | revision to pa# 2006.08.04.8633. site condidtions necessitated lay out revisions to first floor toilet rooms and drinking fountain. there is no change to original project scope or cost. |  |
| [200608048633](https://www.permitgraph.org/p/200608048633) | Aug 4, 2006 | Completed: final sign-off Jun 2008 | [6221 Geary Bl](https://www.permitgraph.org/a/1518/033) | [J M A Construction](https://www.permitgraph.org/contractor/j-m-a-construction-743286) | capital improvements to exist 3-story office bldg w/ childcare. include 1st floor toilet room upgrades, new guardrails/handrails @ entry, new drinking fountain @ 1st floor, new exit signage @ 1st flo… | $183,430 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Electric Tech Construction Inc](https://www.permitgraph.org/contractor/electric-tech-construction-inc-897792) (4), [Acme Builders](https://www.permitgraph.org/contractor/acme-builders-869776) (3), [J M A Construction](https://www.permitgraph.org/contractor/j-m-a-construction-743286) (3), [Cba Site Services Inc.](https://www.permitgraph.org/contractor/cba-site-services-inc-455726) (2), [Community Playgrounds Inc.](https://www.permitgraph.org/contractor/community-playgrounds-inc-362950) (2), [Invertice Inc](https://www.permitgraph.org/contractor/invertice-inc-1064172) (2), [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117) (2), [Broken Arrow Communications Inc](https://www.permitgraph.org/contractor/broken-arrow-communications-inc-853651), [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872), [Hoi's Construction](https://www.permitgraph.org/contractor/hoi-s-construction-745380), [Kevin J Barry Ironworks](https://www.permitgraph.org/contractor/kevin-j-barry-ironworks-742590), [Qualtek Wireless Llc.](https://www.permitgraph.org/contractor/qualtek-wireless-llc-1042849), [Rod Muscio Electrical](https://www.permitgraph.org/contractor/rod-muscio-electrical-309056), [Triton Tower Inc](https://www.permitgraph.org/contractor/triton-tower-inc-794622), [Yupana Inc](https://www.permitgraph.org/contractor/yupana-inc-1028016)
- Architects: [Paulett Taggart](https://www.permitgraph.org/professional/paulett-taggart-C10957) (2), [Alberto Lopez](https://www.permitgraph.org/professional/alberto-lopez-C34189), [Js Infrastructure](https://www.permitgraph.org/professional/js-infrastructure-C84365), [Manuel Tsihlas](https://www.permitgraph.org/professional/manuel-tsihlas-C28021), [Nestor C. Regino](https://www.permitgraph.org/professional/nestor-c-regino-C11809), [Paulett Taggart Architects](https://www.permitgraph.org/professional/paulett-taggart-architects-C957), [Samuel Mathau](https://www.permitgraph.org/professional/samuel-mathau-C21576), [Steven Terry](https://www.permitgraph.org/professional/steven-terry-C66211)
- Engineers: [Albert Teng](https://www.permitgraph.org/professional/albert-teng-C41170), [Bret Mccomb](https://www.permitgraph.org/professional/bret-mccomb-69891), [Daniel Joita](https://www.permitgraph.org/professional/daniel-joita-79897), [Glen Hunt](https://www.permitgraph.org/professional/glen-hunt-C67146), [Jacob Proctor](https://www.permitgraph.org/professional/jacob-proctor-C70567), [John Anderson Jr.](https://www.permitgraph.org/professional/john-anderson-jr-69368)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/1518/033.