# 156 09th Ave

Block 1368, lot 032. Page: https://www.permitgraph.org/a/1368/032

- City's use: Multi-Family Residential
- Built: 1965
- Stories: 3
- Units: 15
- Rooms: 15 bathrooms
- Building: 12,711 sq ft
- Lot: 6,000 sq ft
- Zoning: RH2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

8 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202309076050](https://www.permitgraph.org/p/202309076050) | Sep 7, 2023 | Completed: final sign-off Sep 2023 | [156 09th Av](https://www.permitgraph.org/a/1368/032) | [Poly-On Security System Inc.](https://www.permitgraph.org/contractor/poly-on-security-system-inc-1044620) | upgrade existing fire alarm system by replacing it with 1-addressible fire alarm unit 1-wireless communicator next to facu 9- addressible smoke detectors, 4-addressible manul pull station, 7-horn str… | $19,000 |
| [201808298621](https://www.permitgraph.org/p/201808298621) | Aug 29, 2018 | Completed: final sign-off Dec 2018 | [156 09th Av](https://www.permitgraph.org/a/1368/032) | [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656) | detail change to approved pa 2018-0814-7327 relocation of steel frame 1. ref pa 2018-0510-8847 (soft story) |  |
| [M969427](https://www.permitgraph.org/p/M969427) | Aug 23, 2018 | Never finaled: issued Aug 2018, no final | [156 09th Av](https://www.permitgraph.org/a/1368/032) |  | street space |  |
| [201808147327](https://www.permitgraph.org/p/201808147327) | Aug 14, 2018 | Completed: final sign-off Dec 2018 | [156 09th Av](https://www.permitgraph.org/a/1368/032) | [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656) | detail change to 201805108847. steel frame #2 changed because of (e) beam |  |
| [M947007](https://www.permitgraph.org/p/M947007) | Jul 6, 2018 | Never finaled: issued Jul 2018, no final | [156 09th Av](https://www.permitgraph.org/a/1368/032) |  | street space |  |
| [201805108847](https://www.permitgraph.org/p/201805108847) | May 10, 2018 | Completed: final sign-off Dec 2018 | [156 09th Av](https://www.permitgraph.org/a/1368/032) | [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $130,000 |
| [M501167](https://www.permitgraph.org/p/M501167) | Jul 1, 2014 | Never finaled: issued Jul 2014, no final | [156 09th Av](https://www.permitgraph.org/a/1368/032) |  | street space & sidewalk permit |  |
| [201403049844](https://www.permitgraph.org/p/201403049844) | Mar 4, 2014 | Completed: final sign-off Apr 2014 | [156 09th Av](https://www.permitgraph.org/a/1368/032) | [Cas Construction](https://www.permitgraph.org/contractor/cas-construction-708239) | unit #101: remodel kitchen and bathroom, replace cabinets and floorings, replace fixtures in kind, no structural work, no change in configuration | $21,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656) (3), [Cas Construction](https://www.permitgraph.org/contractor/cas-construction-708239), [Poly-On Security System Inc.](https://www.permitgraph.org/contractor/poly-on-security-system-inc-1044620)
- Engineers: [Behruz Vahdani-Sanavi, Ph.D.,P.E](https://www.permitgraph.org/professional/behruz-vahdani-sanavi-ph-d-p-e-C35605) (2)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.