# 1683 Hayes St

Block 1207, lot 038. Page: https://www.permitgraph.org/a/1207/038

- City's use: Single Family Residential
- Built: 1900
- Stories: 1
- Units: 1
- Rooms: 3 bedrooms, 2 bathrooms
- Building: 1,588 sq ft
- Zoning: RH3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

12 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202012090645](https://www.permitgraph.org/p/202012090645) | Dec 9, 2020 | Completed: final sign-off Sep 2021 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Darc Ventures Inc Dba Spl Construction S](https://www.permitgraph.org/contractor/darc-ventures-inc-dba-spl-construction-s-938513) | revision to app#201908279966. convert extg dining room to kitchen. convert extg kitchen to dining room. remove partition walls around washer/dryer mudroom. | $25,000 |
| [201911126951](https://www.permitgraph.org/p/201911126951) | Nov 12, 2019 | Completed: final sign-off Jan 2020 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Olexo Construction Company](https://www.permitgraph.org/contractor/olexo-construction-company-451049) | revision to pa 201908209277 per filed inspectors request. plans to reflect new bathroom at 4th flr - attic | $12,500 |
| [201909131582](https://www.permitgraph.org/p/201909131582) | Sep 13, 2019 | Completed: final sign-off Sep 2021 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Olexo Construction Company](https://www.permitgraph.org/contractor/olexo-construction-company-451049) | install closet cabintry and bathroomwith toilet, shower,sinks and cabinetry. flor and shower walls to be tile.move 1/2 bathroom door from one side to the other.nonbearing sheetrock and framing to fil… | $17,000 |
| [201908279966](https://www.permitgraph.org/p/201908279966) | Aug 27, 2019 | Completed: final sign-off Sep 2021 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Olexo Construction Company](https://www.permitgraph.org/contractor/olexo-construction-company-451049) | replace existing in kind kitchen, full bath located on the third floor | $36,000 |
| [201908209277](https://www.permitgraph.org/p/201908209277) | Aug 20, 2019 | Completed: final sign-off Jan 2020 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Olexo Construction Company](https://www.permitgraph.org/contractor/olexo-construction-company-451049) | remodel bathroom new toilet, sink, and shower to be replace no change to walls. | $12,500 |
| [201511193069](https://www.permitgraph.org/p/201511193069) | Nov 19, 2015 | Completed: final sign-off Feb 2016 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [Tom Lee Roofing Inc.](https://www.permitgraph.org/contractor/tom-lee-roofing-inc-731731) | reroofing. | $36,000 |
| [M111146](https://www.permitgraph.org/p/M111146) | Mar 6, 2008 | Never finaled: issued Mar 2008, no final | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) |  | street space |  |
| [M103865](https://www.permitgraph.org/p/M103865) | Jan 22, 2008 | Never finaled: issued Jan 2008, no final | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) |  | street space |  |
| [M103129](https://www.permitgraph.org/p/M103129) | Jan 16, 2008 | Never finaled: issued Jan 2008, no final | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) |  | sidewalk |  |
| [200801142453](https://www.permitgraph.org/p/200801142453) | Jan 14, 2008 | Completed: final sign-off May 2009 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) | [The Lunt Marymor Co. Inc.](https://www.permitgraph.org/contractor/the-lunt-marymor-co-inc-764839) | fire sprinkler installation for coverage of 3rd floor rec. room only. includes upgraded utility meter, underground main service, control riser and 11 sprinkler heads | $14,000 |
| [M84664](https://www.permitgraph.org/p/M84664) | Sep 4, 2007 | Never finaled: issued Sep 2007, no final | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) |  | street space |  |
| [200705020209](https://www.permitgraph.org/p/200705020209) | May 2, 2007 | Completed: final sign-off May 2009 | [1683 Hayes St](https://www.permitgraph.org/a/1207/038) |  | convert existing attic into habitable space. demolish rear portion of roof to accomodate a new roof deck over existing kitchen sunroom. | $45,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Olexo Construction Company](https://www.permitgraph.org/contractor/olexo-construction-company-451049) (4), [Darc Ventures Inc Dba Spl Construction S](https://www.permitgraph.org/contractor/darc-ventures-inc-dba-spl-construction-s-938513), [The Lunt Marymor Co. Inc.](https://www.permitgraph.org/contractor/the-lunt-marymor-co-inc-764839), [Tom Lee Roofing Inc.](https://www.permitgraph.org/contractor/tom-lee-roofing-inc-731731)
- Architects: [Robert Michael Olexo](https://www.permitgraph.org/professional/robert-michael-olexo-C14091), [Vahid Khalili](https://www.permitgraph.org/professional/vahid-khalili-C31165)
- Engineers: [Don David](https://www.permitgraph.org/professional/don-david-S3928)
- Authorized agents: [Casper Mork-Ulnes](https://www.permitgraph.org/professional/casper-mork-ulnes-C33031)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/1207/038.
