# 601 Masonic Ave

Block 1187, lot 001. Page: https://www.permitgraph.org/a/1187/001

- City's use: Multi-Family Residential
- Built: 1916
- Stories: 2
- Units: 11
- Rooms: 11 bathrooms
- Building: 9,170 sq ft
- Lot: 5,135 sq ft
- Zoning: NC1
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

14 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202512111548](https://www.permitgraph.org/p/202512111548) | Dec 11, 2025 | Completed: final sign-off Feb 2026 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503) | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1. to meet 75db in all sleeping areas. | $27,300 |
| [202308255266](https://www.permitgraph.org/p/202308255266) | Aug 25, 2023 | Never finaled: filed Aug 2023, never issued | [1801 Fulton St](https://www.permitgraph.org/a/1187/001) |  | remove(1)(e)antenna.remove(4)(e)) rrus(2) rrus11 b13(2) rrus112 b4. install (3)(n) antennas. install (3)(n)rrus (1)4449(2)8843. install (4)(n) diplexer. install (2)(n) antenna mounts.relocate (1)(e)… | $40,000 |
| [M1128328](https://www.permitgraph.org/p/M1128328) | Aug 23, 2019 | Never finaled: issued Aug 2019, no final | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) |  | street space |  |
| [201908088238](https://www.permitgraph.org/p/201908088238) | Aug 8, 2019 | Completed: final sign-off Nov 2019 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [Synerforce Construction](https://www.permitgraph.org/contractor/synerforce-construction-1004962) | revision to soft story perm it 201709158424. replace moment frame with strong wall. shear wall and collector changes. increase 28 day concrete strength to 4000 psi |  |
| [201709158423](https://www.permitgraph.org/p/201709158423) | Sep 15, 2017 | Completed: final sign-off Nov 2019 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [Synerforce Construction](https://www.permitgraph.org/contractor/synerforce-construction-1004962) | apartments: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 |  |
| [201709158424](https://www.permitgraph.org/p/201709158424) | Sep 15, 2017 | Completed: final sign-off Nov 2019 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [Synerforce Construction](https://www.permitgraph.org/contractor/synerforce-construction-1004962) | retail/restaurant: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $78,000 |
| [201502259356](https://www.permitgraph.org/p/201502259356) | Feb 25, 2015 | Completed: final sign-off Oct 2016 | [1801 Fulton St](https://www.permitgraph.org/a/1187/001) | [Jfc Construction Inc.](https://www.permitgraph.org/contractor/jfc-construction-inc-592562) | install verizon wirleless micro telecom facility on bldg rooftop: 1-18" diameter faux vent pipe to conceal 1 antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 & 1 new charler cabinet mount… | $50,000 |
| [201408184107](https://www.permitgraph.org/p/201408184107) | Aug 18, 2014 | Completed: final sign-off Aug 2014 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [P & L Construction Co](https://www.permitgraph.org/contractor/p-l-construction-co-767255) | repairs at the entire rear stair stucture, less than 40% work done. | $3,000 |
| [201405276805](https://www.permitgraph.org/p/201405276805) | May 27, 2014 | Completed: final sign-off Jun 2014 | [601 Masonic Av](https://www.permitgraph.org/a/1187/001) | [P & L Construction Co](https://www.permitgraph.org/contractor/p-l-construction-co-767255) | repair the stair to roof with nov #201472251, item #2, less than 50% | $3,000 |
| [201308013318](https://www.permitgraph.org/p/201308013318) | Aug 1, 2013 | Completed: final sign-off May 2014 | [1813 Fulton St](https://www.permitgraph.org/a/1187/001) |  | re-painted existing projecting sign | $600 |
| [201308013337](https://www.permitgraph.org/p/201308013337) | Aug 1, 2013 | Completed: final sign-off May 2014 | [1813 Fulton St](https://www.permitgraph.org/a/1187/001) |  | re-painted (1) double faced projecting sign & (1) wall sign | $550 |
| [201105105758](https://www.permitgraph.org/p/201105105758) | May 10, 2011 | Expired or cancelled: withdrawn May 2013 | [1813 Fulton St](https://www.permitgraph.org/a/1187/001) |  | change of use from self service to full service restaurant. no new construction (planning purposes only). |  |
| [200906019418](https://www.permitgraph.org/p/200906019418) | Jun 1, 2009 | Expired or cancelled: cancelled May 2012 | [1801 Fulton St](https://www.permitgraph.org/a/1187/001) |  | install t-mobile microcell facility on roof of existing three story building per za determination letter for accessory use determination for microcell facilities dated may 15, 2006. | $50,000 |
| [200603217213](https://www.permitgraph.org/p/200603217213) | Mar 21, 2006 | Expired or cancelled: cancelled Feb 2008 | [1801 Fulton St](https://www.permitgraph.org/a/1187/001) | [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538) | installation of new microcell panel antenna enclosed within a faux vent/installation of associated equipment and neccessary cabling/cable trays. no new batteries. | $25,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Synerforce Construction](https://www.permitgraph.org/contractor/synerforce-construction-1004962) (3), [P & L Construction Co](https://www.permitgraph.org/contractor/p-l-construction-co-767255) (2), [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503), [Jfc Construction Inc.](https://www.permitgraph.org/contractor/jfc-construction-inc-592562), [Transceive Communications Inc.](https://www.permitgraph.org/contractor/transceive-communications-inc-845538)
- Architects: [James Vaccaro](https://www.permitgraph.org/professional/james-vaccaro-C29682), [Rene Sanchez](https://www.permitgraph.org/professional/rene-sanchez-C63836)
- Engineers: [Yunxiao Yang](https://www.permitgraph.org/professional/yunxiao-yang-C87746)
- Authorized agents: [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C29682)
- Designers: [Yin Kai Tong Di-Fun Tsang Tong](https://www.permitgraph.org/professional/yin-kai-tong-di-fun-tsang-tong-808503)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/1187/001.
