# 250 Laurel St

Block 0996, lot 031. Page: https://www.permitgraph.org/a/0996/031

- City's use: Single Family Residential
- Built: 1917
- Stories: 1
- Units: 1
- Rooms: 4 bedrooms, 2 bathrooms
- Building: 3,630 sq ft
- Zoning: RH1
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

15 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202412116626](https://www.permitgraph.org/p/202412116626) | Dec 11, 2024 | Completed: final sign-off Sep 2025 | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [Vonnegut Thoreau Construction](https://www.permitgraph.org/contractor/vonnegut-thoreau-construction-970787) | unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insert | $70,000 |
| [202105039706](https://www.permitgraph.org/p/202105039706) | May 3, 2021 | Expired or cancelled: cancelled Jul 2023 | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as built plans: heat detector was installed instead of smoke detector at basement floor in front of elevator; fa reference pa# 2020 1208 0563 |  |
| [202012080563](https://www.permitgraph.org/p/202012080563) | Dec 8, 2020 | Never finaled: issued Jan 2021, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | like for like, voluntary fire alarm system replacement installation in sprinkler building. replace of existing facp with a new ifp-75 fire alarm control unit. facu will be installed from 66" to 72" m… | $14,450 |
| [M1214727](https://www.permitgraph.org/p/M1214727) | Jul 1, 2020 | Never finaled: filed Jul 2020, never issued | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M965607](https://www.permitgraph.org/p/M965607) | Aug 16, 2018 | Never finaled: issued Aug 2018, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M952807](https://www.permitgraph.org/p/M952807) | Jul 20, 2018 | Never finaled: issued Jul 2018, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M926887](https://www.permitgraph.org/p/M926887) | May 15, 2018 | Never finaled: issued May 2018, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M892209](https://www.permitgraph.org/p/M892209) | Feb 22, 2018 | Never finaled: issued Feb 2018, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M721507](https://www.permitgraph.org/p/M721507) | Sep 13, 2016 | Never finaled: issued Sep 2016, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | streetspace |  |
| [201509086390](https://www.permitgraph.org/p/201509086390) | Sep 8, 2015 | Completed: final sign-off Dec 2015 | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [Bay Marin Construction](https://www.permitgraph.org/contractor/bay-marin-construction-702963) | unit 102: remodel bathroom in common area (managers unit), no walls moved, removed, added, or infilled. sink to move to foot of shower, remove tub & replace with shower, toilet location to remain unc… | $30,000 |
| [M281087](https://www.permitgraph.org/p/M281087) | Sep 23, 2011 | Never finaled: issued Sep 2011, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space |  |
| [M220306](https://www.permitgraph.org/p/M220306) | Sep 10, 2010 | Never finaled: issued Sep 2010, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space permit |  |
| [M154984](https://www.permitgraph.org/p/M154984) | Mar 10, 2009 | Never finaled: issued Mar 2009, no final | [250 Laurel St](https://www.permitgraph.org/a/0996/031) |  | street space only. |  |
| [200808058451](https://www.permitgraph.org/p/200808058451) | Aug 5, 2008 | Completed: final sign-off Sep 2008 | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [Castle Construction Inc.](https://www.permitgraph.org/contractor/castle-construction-inc-814686) | repair two existing, 5 story stair cases to have new infill rail w/ opening, less than 4", and modify existing guardrails to be 42" high, to comply w/ nov 200842391. | $25,000 |
| [200607186870](https://www.permitgraph.org/p/200607186870) | Jul 18, 2006 | Completed: final sign-off Jan 2007 | [250 Laurel St](https://www.permitgraph.org/a/0996/031) | [Bay Marin Construction](https://www.permitgraph.org/contractor/bay-marin-construction-702963) | complete remodel of master bathroom, relocate shower drain, upgrade plumbing, add gas line to rear porch. | $25,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bay Marin Construction](https://www.permitgraph.org/contractor/bay-marin-construction-702963) (2), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) (2), [Castle Construction Inc.](https://www.permitgraph.org/contractor/castle-construction-inc-814686), [Vonnegut Thoreau Construction](https://www.permitgraph.org/contractor/vonnegut-thoreau-construction-970787)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.