# 2851 Filbert St

Block 0948, lot 018. Page: https://www.permitgraph.org/a/0948/018

- City's use: Multi-Family Residential
- Built: 2018
- Stories: 4
- Units: 2
- Rooms: 5 bedrooms, 7 bathrooms
- Building: 6,639 sq ft
- Lot: 3,824 sq ft
- Zoning: RH1
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

11 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201803012631](https://www.permitgraph.org/p/201803012631) | Mar 1, 2018 | Expired or cancelled: cancelled Jun 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789) | add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" ab… | $50,000 |
| [M847247](https://www.permitgraph.org/p/M847247) | Oct 23, 2017 | Never finaled: issued Oct 2017, no final | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) |  | street space |  |
| [M770449](https://www.permitgraph.org/p/M770449) | Mar 22, 2017 | Never finaled: issued Mar 2017, no final | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) |  | street space |  |
| [201611142596](https://www.permitgraph.org/p/201611142596) | Nov 14, 2016 | Completed: final sign-off Feb 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503) | basement: installation of a new sprinkler monitoring system. ref pa 201205251254, ref sprinkler pa 201607122067 | $2,500 |
| [201609127372](https://www.permitgraph.org/p/201609127372) | Sep 12, 2016 | Completed: final sign-off May 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789) | remodel two bathrooms in (e) rear yard cottage. repair dry rot to access stairs to same cottage. not visible from strret - repair in-kind. | $25,000 |
| [M705187](https://www.permitgraph.org/p/M705187) | Jul 13, 2016 | Never finaled: issued Jul 2016, no final | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) |  | streetspace |  |
| [201607122067](https://www.permitgraph.org/p/201607122067) | Jul 12, 2016 | Completed: final sign-off Feb 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Serrano Fire Protection Systems](https://www.permitgraph.org/contractor/serrano-fire-protection-systems-789820) | front bldg: full installation of fire sprinkler through out the bldg including 2" underground pipe. ref app#201205251254. | $18,000 |
| [201603172307](https://www.permitgraph.org/p/201603172307) | Mar 17, 2016 | Completed: final sign-off Jul 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789) | rear building- remove & replace existing foundation @ guest house, replace 3 existing wood beams with new engineered beams. | $25,000 |
| [201509227620](https://www.permitgraph.org/p/201509227620) | Sep 22, 2015 | Completed: final sign-off Feb 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789), [Ace Drilling & Excavation](https://www.permitgraph.org/contractor/ace-drilling-excavation-889820) | temporary earth shoring system to accommodate earthwork for new constructon | $200,000 |
| [201306149559](https://www.permitgraph.org/p/201306149559) | Jun 14, 2013 | Completed: final sign-off Oct 2016 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789) | remove existing kitchen; building to become accessory structure. | $900 |
| [201205251254](https://www.permitgraph.org/p/201205251254) | May 25, 2012 | Completed: final sign-off Feb 2018 | [2851 Filbert St](https://www.permitgraph.org/a/0948/018) | [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789), [Ace Drilling & Excavation](https://www.permitgraph.org/contractor/ace-drilling-excavation-889820) | to erect 3 stories, 1 baement, single family, type v new building. | $1,025,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Amber - Tru Construction Inc.](https://www.permitgraph.org/contractor/amber-tru-construction-inc-880789) (6), [Ace Drilling & Excavation](https://www.permitgraph.org/contractor/ace-drilling-excavation-889820) (2), [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503), [Serrano Fire Protection Systems](https://www.permitgraph.org/contractor/serrano-fire-protection-systems-789820)
- Architects: [William Pashelinsky](https://www.permitgraph.org/professional/william-pashelinsky-C11020) (2)
- Engineers: [Kevin O'connor](https://www.permitgraph.org/professional/kevin-o-connor-C65297)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0948/018.
