# 462 Duboce Ave

Block 0875, lot 023. Page: https://www.permitgraph.org/a/0875/023

- City's use: Multi-Family Residential
- Built: 1971
- Stories: 6
- Units: 42
- Rooms: 42 bathrooms
- Building: 29,633 sq ft
- Lot: 9,180 sq ft
- Zoning: RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

21 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202007150230](https://www.permitgraph.org/p/202007150230) | Jul 15, 2020 | Never finaled: issued Aug 2020, no final | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) | red cloud to replace bda w/ combo and program sf frequencies. red cloud to upgrade donor antenna and point towards twin peaks. all other errc's will remain unchanged. as built for pa #201809129884 | $10,000 |
| [201910174858](https://www.permitgraph.org/p/201910174858) | Oct 17, 2019 | Completed: final sign-off Feb 2020 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | install (1) new annunciator for errcs, 5 monitor module for monitoring errcs | $4,000 |
| [201809129884](https://www.permitgraph.org/p/201809129884) | Sep 12, 2018 | Completed: final sign-off Nov 2026 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | instalation of emergency responder radio coverage system. ref 201504012572. | $49,999 |
| [201709056887](https://www.permitgraph.org/p/201709056887) | Sep 5, 2017 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | revise pa# 201706230244. remove elevator smoke doors. add hvi units 302, 303, 410. change monitoring from internet to aes radio. |  |
| [201708245853](https://www.permitgraph.org/p/201708245853) | Aug 24, 2017 | Completed: final sign-off Oct 2017 | [345 Hermann St](https://www.permitgraph.org/a/0875/023) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to pa #201504012572. revised items include change to accessible patio doors, add communication features to units. add handrails, change in exit only gate. eliminate automatic door push pad,… | $5,000 |
| [201707242681](https://www.permitgraph.org/p/201707242681) | Jul 24, 2017 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | sffd review only: evacuation maps (13 total) floors: 1,2,3,4,5,6,r. | $5,200 |
| [201706230244](https://www.permitgraph.org/p/201706230244) | Jun 23, 2017 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | replace an existing fire system, 1 pfc 6200 facu, 2 annuciator, 2 power supply, 55 smoke det, 42 low freq sounders, 8 horn strobes, 8 sounds strobes , 6 strobes, 2 door holders | $45,000 |
| [201705186975](https://www.permitgraph.org/p/201705186975) | May 18, 2017 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | landscape plan revision. revision to pa 2017-0130-8218, revised courtyard |  |
| [M786867](https://www.permitgraph.org/p/M786867) | May 17, 2017 | Never finaled: issued May 2017, no final | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) |  | street space |  |
| [M761087](https://www.permitgraph.org/p/M761087) | Feb 14, 2017 | Never finaled: issued Feb 2017, no final | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) |  | street space |  |
| [201701308218](https://www.permitgraph.org/p/201701308218) | Jan 30, 2017 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | landscape and irrigation including renovation or replacement of irrigation system, site pavement, site furnishing and planting. | $50,000 |
| [M711447](https://www.permitgraph.org/p/M711447) | Aug 5, 2016 | Never finaled: issued Aug 2016, no final | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) |  | street space |  |
| [201602290813](https://www.permitgraph.org/p/201602290813) | Feb 29, 2016 | Completed: final sign-off Sep 2017 | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) | [Tony Ng Plumbing Co](https://www.permitgraph.org/contractor/tony-ng-plumbing-co-329705) | add fire sprinklers in the non sprinklered areas of the (e) 4th & 6th floor residential building. these building have an (e) sprinkler system & is fully sprinklered in some areas. all pipes are conce… | $150,000 |
| [M658867](https://www.permitgraph.org/p/M658867) | Jan 28, 2016 | Never finaled: issued Jan 2016, no final | [462 Duboce Av](https://www.permitgraph.org/a/0875/023) |  | street space permit |  |
| [201504012572](https://www.permitgraph.org/p/201504012572) | Apr 1, 2015 | Completed: final sign-off Oct 2017 | [345 Hermann St](https://www.permitgraph.org/a/0875/023) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan &… | $6,701,351 |
| [201209190077](https://www.permitgraph.org/p/201209190077) | Sep 19, 2012 | Completed: final sign-off Oct 2012 | [345 Hermann St](https://www.permitgraph.org/a/0875/023) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | replace fire alarm system. panel vandalized. replace panel with new addressable. replace smoke detectors and pull stations with new addressable devices. replace annunciator with similar to existing a… | $18,000 |
| [M218888](https://www.permitgraph.org/p/M218888) | Sep 1, 2010 | Never finaled: issued Sep 2010, no final | [345 Hermann St](https://www.permitgraph.org/a/0875/023) |  | street space permit |  |
| [201007307816](https://www.permitgraph.org/p/201007307816) | Jul 30, 2010 | Completed: final sign-off Sep 2010 | [345 Hermann St](https://www.permitgraph.org/a/0875/023) |  | replace dry-rot in-kind at south facade of bldg. & @ a wing wall in west courtyard. | $12,000 |
| [M208908](https://www.permitgraph.org/p/M208908) | Jun 28, 2010 | Never finaled: issued Jun 2010, no final | [345 Hermann St](https://www.permitgraph.org/a/0875/023) |  | street space |  |
| [200310076856](https://www.permitgraph.org/p/200310076856) | Oct 7, 2003 | Never finaled: filed Oct 2003, never issued | [345 Hermann St](https://www.permitgraph.org/a/0875/023) |  | installation of emergency generator | $142,000 |
| [200003214949](https://www.permitgraph.org/p/200003214949) | Mar 21, 2000 | Completed: final sign-off Apr 2001 | [349 Hermann St](https://www.permitgraph.org/a/0875/023) | [Mitchell Engineering/Obayashi Corp](https://www.permitgraph.org/contractor/mitchell-engineering-obayashi-corp-802193) | remove/replace: sidewall siding panels, concrete walkway, 1x trim, roof patch repair, exterior paint | $350,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) (5), [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) (4), [Mitchell Engineering/Obayashi Corp](https://www.permitgraph.org/contractor/mitchell-engineering-obayashi-corp-802193), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170), [Tony Ng Plumbing Co](https://www.permitgraph.org/contractor/tony-ng-plumbing-co-329705), [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919)
- Architects: [L Wayne Barcelon](https://www.permitgraph.org/professional/l-wayne-barcelon-C8444) (2), [Robert Tanaka](https://www.permitgraph.org/professional/robert-tanaka-3199)
- Engineers: [Antonio Jacksalem](https://www.permitgraph.org/professional/antonio-jacksalem-E15401), [Tipping Structural Engineers](https://www.permitgraph.org/professional/tipping-structural-engineers-S6158)
- Designers: [Keith Lattin](https://www.permitgraph.org/professional/keith-lattin-PG1232371)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0875/023.
