# 22 Waller St

Block 0856, lot 003. Page: https://www.permitgraph.org/a/0856/003

- City's use: Commercial Misc
- Built: 1909
- Stories: 1
- Rooms: 23 bathrooms
- Lot: 30,417 sq ft
- Zoning: RM2
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

45 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202505025711](https://www.permitgraph.org/p/202505025711) | May 2, 2025 | Completed: final sign-off Apr 2026 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Manufacturers/Hyland Ltd](https://www.permitgraph.org/contractor/manufacturers-hyland-ltd-876836) | partial reinforcment of existing dome windows. all work is in kind, no exterior work. | $30,000 |
| [202502100017](https://www.permitgraph.org/p/202502100017) | Feb 28, 2025 | Completed: final sign-off Jun 2025 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Silicon Valley General Builder Contracto](https://www.permitgraph.org/contractor/silicon-valley-general-builder-contracto-1033491) | convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38. | $50,000 |
| [201908017662](https://www.permitgraph.org/p/201908017662) | Aug 1, 2019 | Never finaled: issued Aug 2019, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Master Roofing Systems Inc.](https://www.permitgraph.org/contractor/master-roofing-systems-inc-977575) | reroofing | $18,000 |
| [201812077746](https://www.permitgraph.org/p/201812077746) | Dec 7, 2018 | Completed: final sign-off Dec 2018 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | to obtain final inspection for work approved under pa# 201602099172, 201610170430 and 201601076607. all work is complete. |  |
| [201812057489](https://www.permitgraph.org/p/201812057489) | Dec 5, 2018 | Completed: final sign-off Dec 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | to obtain final inspection for work approved under pa#201608104658 and 201606018872. all work is complete |  |
| [201808167584](https://www.permitgraph.org/p/201808167584) | Aug 16, 2018 | Completed: final sign-off Nov 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | to obtain final inspection for work approved under pa# 201606068872. all work is complete. |  |
| [201703161600](https://www.permitgraph.org/p/201703161600) | Mar 16, 2017 | Completed: final sign-off Oct 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | revision to app#201612286042 to include expansion of men's restroom deletion of storage room, relocation of wall and revision to av wall. n/a for maher. |  |
| [201612286042](https://www.permitgraph.org/p/201612286042) | Dec 28, 2016 | Completed: final sign-off Oct 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | renovations in basement of workshop bld. work includes upgrade if bathrooms & drinking fountains to ada compliance, new moveable partition wall, new finishes, no exterior work. fire protection under… | $786,000 |
| [201611072120](https://www.permitgraph.org/p/201611072120) | Nov 7, 2016 | Never finaled: issued Nov 2016, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | addition of electrical panel and low voltage wiring for installationof audio visual equipment. addition to pa 201604265762. | $2,500 |
| [201610170430](https://www.permitgraph.org/p/201610170430) | Oct 17, 2016 | Expired or cancelled: expired Dec 2018 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [K K Electric & Alarm Company](https://www.permitgraph.org/contractor/k-k-electric-alarm-company-893093) | modify fire alrm permit issued under 2016-0606-9188 - add 1 smoke detector with relay to activate the new fire rated shutter between buildings. eliminate the addition strobe number 12 as stated in th… | $800 |
| [201608104658](https://www.permitgraph.org/p/201608104658) | Aug 10, 2016 | Expired or cancelled: expired Dec 2018 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | electrical revisions only to pa 2016-0426-5762. maher na |  |
| [201607011425](https://www.permitgraph.org/p/201607011425) | Jul 1, 2016 | Never finaled: issued Jul 2016, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | relocate 8 pendent at 1st floor. add 14 upright heads at 2nd floor roof level. ref app#201601076606. to comply to complaint #201616173. n/a for maher | $7,700 |
| [201606281098](https://www.permitgraph.org/p/201606281098) | Jun 28, 2016 | Completed: final sign-off Dec 2018 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | add 2 upgright sprinkler heads, add 1 pendent sprinkler heads, relocate 1 upright sprinkler heads ref pa# 201601076607 | $2,200 |
| [201606281100](https://www.permitgraph.org/p/201606281100) | Jun 28, 2016 | Completed: final sign-off Dec 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | add 7 upright sprinkler heads. add 4 pendent heads, relocating 30 pendent ref pa 2016 0107 6603 maher na | $14,350 |
| [201606069188](https://www.permitgraph.org/p/201606069188) | Jun 6, 2016 | Never finaled: issued Jun 2016, no final | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [K K Electric & Alarm Company](https://www.permitgraph.org/contractor/k-k-electric-alarm-company-893093) | alter existing fire alarm system. add 1 strobe, 1 strobe horn. remove 2 existing strobe horns | $1,800 |
| [201606018872](https://www.permitgraph.org/p/201606018872) | Jun 1, 2016 | Expired or cancelled: expired Nov 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | revision to ref pa 2016 0107 6603: reduction of scope of work to remove basement level work in worship building. fire protection under sep permit. maher na |  |
| [201604265762](https://www.permitgraph.org/p/201604265762) | Apr 26, 2016 | Never finaled: issued Jun 2016, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | revision to app#201601076606. scope is to delete interior non-bearing walls at 2nd floor, to create open office area. modifications noted by delta 4 |  |
| [M670587](https://www.permitgraph.org/p/M670587) | Mar 8, 2016 | Never finaled: issued Mar 2016, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) |  | street space |  |
| [201602099172](https://www.permitgraph.org/p/201602099172) | Feb 9, 2016 | Expired or cancelled: expired Dec 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | install 2(n) accessible lifts, w (n) landing to mtg bldg and (n) landing at play yard. sit work, interior alterations + addition by separate permit. n/a for maher ordinance no. 155-13. | $15,000 |
| [201601076603](https://www.permitgraph.org/p/201601076603) | Jan 7, 2016 | Completed: final sign-off Oct 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | ti include lighting, mep, parking lot and accessibility improvements | $600,000 |
| [201601076606](https://www.permitgraph.org/p/201601076606) | Jan 7, 2016 | Completed: final sign-off Jan 2019 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | ti of (e) church bldg including installation of (n) platform lift between floors. work includes reconfiguration of floors, (n) fixtures, (n) finishes, voluntary structural strengthening. n/a maher or… | $50,000 |
| [201601076607](https://www.permitgraph.org/p/201601076607) | Jan 7, 2016 | Expired or cancelled: expired Dec 2018 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | new 50 sq.ft. addition for communicating opening to adjacent (administrative building) n/a for maher. 2-hr fire wall/barrier with 2-90 min fire doors with fusible links connected to fa system (fa und… | $50,000 |
| [201601076604](https://www.permitgraph.org/p/201601076604) | Jan 7, 2016 | Completed: final sign-off Oct 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) | installation of 2 (n) accessible parking spaces, new 2% max ramp with hand rails. platform lift under separate permit | $50,000 |
| [201309126642](https://www.permitgraph.org/p/201309126642) | Sep 12, 2013 | Never finaled: issued Sep 2013, no final | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [International Fire Inc](https://www.permitgraph.org/contractor/international-fire-inc-965370) | like for like voluntary panel replacement in fully sprinkled bldg, replace (e) panel w/new ms-2 control panel of the same location on 1/f in admin bldg., replace 7 smoke & 8 pull stations w/new at th… | $4,000 |
| [M353507](https://www.permitgraph.org/p/M353507) | Oct 17, 2012 | Never finaled: issued Oct 2012, no final | [22 Waller St](https://www.permitgraph.org/a/0856/003) |  | street space permit |  |
| [201209250555](https://www.permitgraph.org/p/201209250555) | Sep 25, 2012 | Expired or cancelled: expired Oct 2018 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Waters Construction & Plumbing Co.](https://www.permitgraph.org/contractor/waters-construction-plumbing-co-660371) |  | $13,000 |
| [201209119422](https://www.permitgraph.org/p/201209119422) | Sep 11, 2012 | Completed: final sign-off Oct 2013 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Master Roof Company](https://www.permitgraph.org/contractor/master-roof-company-975769) | reroofing | $18,000 |
| [201208097000](https://www.permitgraph.org/p/201208097000) | Aug 9, 2012 | Never finaled: issued Aug 2012, no final | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Waters Construction & Plumbing Co.](https://www.permitgraph.org/contractor/waters-construction-plumbing-co-660371) | dry rot repair around basement windows exploratory work only. | $3,000 |
| [M329887](https://www.permitgraph.org/p/M329887) | Jun 25, 2012 | Never finaled: issued Jun 2012, no final | [22 Waller St](https://www.permitgraph.org/a/0856/003) |  | street space |  |
| [201007227259](https://www.permitgraph.org/p/201007227259) | Jul 22, 2010 | Completed: final sign-off Aug 2010 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | to erect non electric wall sign | $1,000 |
| [200906039696](https://www.permitgraph.org/p/200906039696) | Jun 3, 2009 | Expired or cancelled: expired Jan 2016 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | dry rot repair for exterior-total about 600 sq ft. repair & repalce in kind | $30,000 |
| [200906039676](https://www.permitgraph.org/p/200906039676) | Jun 3, 2009 | Completed: final sign-off Aug 2009 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [K K Electric & Alarm Company](https://www.permitgraph.org/contractor/k-k-electric-alarm-company-893093) | install fire alarm system | $8,000 |
| [200905188620](https://www.permitgraph.org/p/200905188620) | May 18, 2009 | Completed: final sign-off Aug 2009 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | provide new automatic fire sprinkler for existing building. | $3,100 |
| [200905188621](https://www.permitgraph.org/p/200905188621) | May 18, 2009 | Completed: final sign-off Aug 2009 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | provide new automatic fire sprinkler for existing building. | $3,400 |
| [M162166](https://www.permitgraph.org/p/M162166) | Apr 24, 2009 | Never finaled: issued Apr 2009, no final | [52 Waller St](https://www.permitgraph.org/a/0856/003) |  | street space permit only. |  |
| [200904035502](https://www.permitgraph.org/p/200904035502) | Apr 3, 2009 | Completed: final sign-off Oct 2009 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | tenant improvement: construct (n) non-structural bearing walls (n) deck & canopy @ breezeway. (n) restrooms & (n) lighting & plumbing fixtures. sprinklers permit under separate permit. | $100,000 |
| [200904035495](https://www.permitgraph.org/p/200904035495) | Apr 3, 2009 | Completed: final sign-off Oct 2009 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | tenant improvement: construct (n) non-structural bearing walls, (n) decking and (n) canopy @ breezeway. add (n) lighting fixtures, (n) restrooms fixtures (for children's use) & replace (e) gas furnac… | $100,000 |
| [200903184351](https://www.permitgraph.org/p/200903184351) | Mar 18, 2009 | Completed: final sign-off Jul 2009 | [52 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | removal of interior (non-bearing) walls as designated on plans only per ab-017. | $5,000 |
| [200903184352](https://www.permitgraph.org/p/200903184352) | Mar 18, 2009 | Completed: final sign-off Jul 2009 | [42 Waller St](https://www.permitgraph.org/a/0856/003) | [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) | removal of interior (non-bearing) walls as designated on plans only per ab-017. | $5,000 |
| [200810214745](https://www.permitgraph.org/p/200810214745) | Oct 21, 2008 | Completed: final sign-off Mar 2009 | [22 Waller St](https://www.permitgraph.org/a/0856/003) |  | replace (e) rear staircase due to damaged by fallen tree to meet accessibility requirements. add one van accessibility parking space | $100,000 |
| [200805303235](https://www.permitgraph.org/p/200805303235) | May 30, 2008 | Expired or cancelled: expired Feb 2012 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Montgomery Sansome Lp](https://www.permitgraph.org/contractor/montgomery-sansome-lp-741713) | replace 700 square feet of siding at rear due to tree damage with associated hose bibb and lighting. replace roof drain. | $15,000 |
| [200706053085](https://www.permitgraph.org/p/200706053085) | Jun 5, 2007 | Completed: final sign-off Jun 2007 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing | $49,562 |
| [200409083613](https://www.permitgraph.org/p/200409083613) | Sep 8, 2004 | Completed: final sign-off Sep 2004 | [22 Waller St](https://www.permitgraph.org/a/0856/003) | [Excelsior Roofing Company](https://www.permitgraph.org/contractor/excelsior-roofing-company-448397) | reroofing | $20,450 |
| [M25399](https://www.permitgraph.org/p/M25399) | Oct 30, 2003 | Never finaled: issued Oct 2003, no final | [54 Waller St](https://www.permitgraph.org/a/0856/003) |  | side walk repair |  |
| [M12940](https://www.permitgraph.org/p/M12940) | Jun 5, 2000 | Expired or cancelled: expired Oct 2000 | [54 Waller St](https://www.permitgraph.org/a/0856/003) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Mc Nely Construction Company](https://www.permitgraph.org/contractor/mc-nely-construction-company-461594) (14), [Mutual Seiko Construction](https://www.permitgraph.org/contractor/mutual-seiko-construction-757312) (7), [K K Electric & Alarm Company](https://www.permitgraph.org/contractor/k-k-electric-alarm-company-893093) (3), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (3), [Waters Construction & Plumbing Co.](https://www.permitgraph.org/contractor/waters-construction-plumbing-co-660371) (2), [Excelsior Roofing Company](https://www.permitgraph.org/contractor/excelsior-roofing-company-448397), [International Fire Inc](https://www.permitgraph.org/contractor/international-fire-inc-965370), [Manufacturers/Hyland Ltd](https://www.permitgraph.org/contractor/manufacturers-hyland-ltd-876836), [Master Roof Company](https://www.permitgraph.org/contractor/master-roof-company-975769), [Master Roofing Systems Inc.](https://www.permitgraph.org/contractor/master-roofing-systems-inc-977575), [Montgomery Sansome Lp](https://www.permitgraph.org/contractor/montgomery-sansome-lp-741713), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170), [Silicon Valley General Builder Contracto](https://www.permitgraph.org/contractor/silicon-valley-general-builder-contracto-1033491), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053)
- Architects: [Timothy Mattheis](https://www.permitgraph.org/professional/timothy-mattheis-C16986) (4), [Ed2 International](https://www.permitgraph.org/professional/ed2-international-C8858) (2), [Simon Kwan](https://www.permitgraph.org/professional/simon-kwan-C27228)
- Engineers: [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582) (3), [Anoush Zebarjadian](https://www.permitgraph.org/professional/anoush-zebarjadian-3313), [Kung Kay Chiu](https://www.permitgraph.org/professional/kung-kay-chiu-C24622), [Stephen Dejesse](https://www.permitgraph.org/professional/stephen-dejesse-S3527)
- Authorized agents: [Southwest Sign Co.](https://www.permitgraph.org/professional/southwest-sign-co-724924)
- Designers: [Timothy Mattheis](https://www.permitgraph.org/professional/timothy-mattheis-C16986)
- Pmt consultant/expediters: [Southwest Sign Co.](https://www.permitgraph.org/professional/southwest-sign-co-724924)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0856/003.