# 250 Fell St

Block 0816, lot 006. Page: https://www.permitgraph.org/a/0816/006

- City's use: Multi-Family Residential
- Built: 1926
- Stories: 5
- Units: 46
- Rooms: 46 bathrooms
- Building: 28,290 sq ft
- Lot: 6,600 sq ft
- Zoning: HAYES
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

50 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202603207987](https://www.permitgraph.org/p/202603207987) | Mar 20, 2026 | Completed: final sign-off Jun 2026 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) | as-built to 202509235943 (ref permits 201909202249, 202509235930). added smoke and heat detector in elevator room. added and relocated sounders in units 24, 27, 43, 45, 48, 49, 53, 56, 57 and 65. |  |
| [202509235930](https://www.permitgraph.org/p/202509235930) | Sep 23, 2025 | Completed: final sign-off Jun 2026 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) | to obtain final inspection for work approved under pa# 201909202249. all work complete. |  |
| [202509235943](https://www.permitgraph.org/p/202509235943) | Sep 23, 2025 | Completed: final sign-off Jun 2026 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) | as-built to permit 201909202249 (ref permit 202509235930). added unit 43 low frequenccy sounder. |  |
| [202203119861](https://www.permitgraph.org/p/202203119861) | Mar 11, 2022 | Completed: final sign-off May 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656) | unit 24: repair of (1) column | $5,000 |
| [202110130412](https://www.permitgraph.org/p/202110130412) | Oct 13, 2021 | Completed: final sign-off Aug 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | 5th flr - apt 56: convert (e) kitchen to study. relocate kitchen. rehab (e) bathroom, install washer/elec dryer. | $36,000 |
| [202108196748](https://www.permitgraph.org/p/202108196748) | Aug 19, 2021 | Completed: final sign-off Aug 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | #65: converting existing kitchen to bedroom. relocate kitchen & bathroom. install washer & dryer. | $42,000 |
| [202108176581](https://www.permitgraph.org/p/202108176581) | Aug 17, 2021 | Completed: final sign-off Aug 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | #24: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $40,000 |
| [202104219072](https://www.permitgraph.org/p/202104219072) | Apr 21, 2021 | Completed: final sign-off Jan 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #42: revision to pa# 2021-0219-5006; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $40,000 |
| [202102195030](https://www.permitgraph.org/p/202102195030) | Feb 19, 2021 | Completed: final sign-off Jan 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #27: 1) convert extg kitchen to study 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $40,000 |
| [202102195031](https://www.permitgraph.org/p/202102195031) | Feb 19, 2021 | Never finaled: issued Jul 2021, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #49: 1) convert extg kitchen to study 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $38,000 |
| [202102195006](https://www.permitgraph.org/p/202102195006) | Feb 19, 2021 | Completed: final sign-off Jan 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 42: remodel bathroom. remodel kitchen. replace washer/dryer. no structure work, no wall removed. | $25,000 |
| [202102054121](https://www.permitgraph.org/p/202102054121) | Feb 5, 2021 | Never finaled: issued Feb 2021, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 49: one kitchen and one bathroom remodel. rehabilitate bathroom and kitchen. replace wahser/dryer at same location. no structural work. no moving walls. | $25,000 |
| [202102054118](https://www.permitgraph.org/p/202102054118) | Feb 5, 2021 | Completed: final sign-off Jan 2022 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 27: one kitchen and one bathroom remodel. rehabilitate bathroom and kitchen. replace wahser/dryer at same location. no structural work. no moving walls. | $25,000 |
| [202012140925](https://www.permitgraph.org/p/202012140925) | Dec 14, 2020 | Completed: final sign-off Feb 2021 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | #31: replace washer and dryer. upgrade line. no structural and no moving walls. | $5,000 |
| [202011027971](https://www.permitgraph.org/p/202011027971) | Nov 2, 2020 | Completed: final sign-off Jan 2021 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit#39: replace washer/dryer. | $5,000 |
| [202009285244](https://www.permitgraph.org/p/202009285244) | Sep 28, 2020 | Completed: final sign-off Nov 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | apt 25: replace washer/dryer. upgrade line. | $20,000 |
| [202009144097](https://www.permitgraph.org/p/202009144097) | Sep 14, 2020 | Never finaled: issued Sep 2020, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 41 - replace washer/dryer. upgrade electrical/plumbing line. no structurak work | $5,000 |
| [202007099872](https://www.permitgraph.org/p/202007099872) | Jul 9, 2020 | Completed: final sign-off Jan 2021 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #57- convert (e) kitchen to bederoom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer | $40,000 |
| [202007089770](https://www.permitgraph.org/p/202007089770) | Jul 8, 2020 | Completed: final sign-off Oct 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | replace washer/dryer, upgrade line | $5,000 |
| [202007089774](https://www.permitgraph.org/p/202007089774) | Jul 8, 2020 | Completed: final sign-off Oct 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | upgrade waher/dryer line. replace washer/dryer | $5,000 |
| [201912230391](https://www.permitgraph.org/p/201912230391) | Dec 23, 2019 | Never finaled: issued Jan 2020, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | unit #58; convert (e) kitchen into bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer | $40,000 |
| [201910316081](https://www.permitgraph.org/p/201910316081) | Oct 31, 2019 | Never finaled: issued Nov 2019, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 48 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $40,000 |
| [201910316075](https://www.permitgraph.org/p/201910316075) | Oct 31, 2019 | Completed: final sign-off Apr 2021 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 44 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $38,000 |
| [201910033439](https://www.permitgraph.org/p/201910033439) | Oct 3, 2019 | Never finaled: issued Oct 2019, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer. #43 | $39,000 |
| [201909303057](https://www.permitgraph.org/p/201909303057) | Sep 30, 2019 | Expired or cancelled: cancelled Nov 2019 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | all work in unit # 43: rehab existing kitchen and bathroom. upgrade washer/dryer "ventless" in existing closet. replace existing kitchen hood in kind. lighting shall be h.e. provide vacancy sensor in… | $25,000 |
| [201909202249](https://www.permitgraph.org/p/201909202249) | Sep 20, 2019 | Never finaled: issued Sep 2019, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) | voluntary upgrade of (e) fire alarm system like for like w/additions of wireless low freq sounders in all sleeping areas | $102,952 |
| [201909192143](https://www.permitgraph.org/p/201909192143) | Sep 19, 2019 | Completed: final sign-off Jul 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Sandbank Construction, Inc](https://www.permitgraph.org/contractor/sandbank-construction-inc-893993) | reinforce columns in accordance with asce 41-13. | $40,000 |
| [201906143505](https://www.permitgraph.org/p/201906143505) | Jun 14, 2019 | Expired or cancelled: cancelled Jan 2026 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 41: replace (e) toilet from commercial to residential | $2,000 |
| [201902203353](https://www.permitgraph.org/p/201902203353) | Feb 20, 2019 | Never finaled: issued Feb 2019, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #68, rehabilitate kitchen and bathroom, add laundry including ventless dryer,, paint unit, reflooring. | $15,000 |
| [201902203377](https://www.permitgraph.org/p/201902203377) | Feb 20, 2019 | Completed: final sign-off Mar 2019 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unti #45: install washer and ventless dryer. | $5,000 |
| [201901140301](https://www.permitgraph.org/p/201901140301) | Jan 14, 2019 | Never finaled: issued Jan 2019, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Holland Brooks Builders Inc](https://www.permitgraph.org/contractor/holland-brooks-builders-inc-978946) | apt 68: add washer/dryer to (e) closet. remodel bathroom (new tilet & pedestal sink). open bathroom wall (patch/repair inkind) to locate water lines for w/d. provide 100si for vent and maintain sep b… | $25,500 |
| [201812138255](https://www.permitgraph.org/p/201812138255) | Dec 13, 2018 | Completed: final sign-off Apr 2019 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 53: rehabilitate (e) kitchn & bath. install w/d convert (e) kitchen to bedroom | $35,000 |
| [M1001607](https://www.permitgraph.org/p/M1001607) | Nov 1, 2018 | Never finaled: issued Nov 2018, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | street space |  |
| [201811014790](https://www.permitgraph.org/p/201811014790) | Nov 1, 2018 | Completed: final sign-off Mar 2019 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674) | unit# 69: 1)rehabilitate extg kitchen and bathroom. install washer and dryer. n/a for maher | $28,000 |
| [201810173434](https://www.permitgraph.org/p/201810173434) | Oct 17, 2018 | Never finaled: issued Oct 2018, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Holland Brooks Builders Inc](https://www.permitgraph.org/contractor/holland-brooks-builders-inc-978946) | unit #35: install new tile surround at (e) tub. install washer and dryer hookups at (e) closet, dryer vented to light well. no strutural modications necessary install new 70amp sub panel to replace e… | $11,000 |
| [201708043946](https://www.permitgraph.org/p/201708043946) | Aug 4, 2017 | Completed: final sign-off Dec 2017 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Babaloons Builders](https://www.permitgraph.org/contractor/babaloons-builders-943485) | unit 58: light kitchen remodel, include compliant lighting & (1) bathroom remodel, no walls removed/altered. maher ord 155-13 na | $35,400 |
| [201707212587](https://www.permitgraph.org/p/201707212587) | Jul 21, 2017 | Expired or cancelled: expired Apr 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Babaloons Builders](https://www.permitgraph.org/contractor/babaloons-builders-943485) | #23 - kitchen remdoel, no structural changes, in like & same location, high efficancy lighting, no moving of walls, doors or windows. | $23,500 |
| [201510220506](https://www.permitgraph.org/p/201510220506) | Oct 22, 2015 | Completed: final sign-off Feb 2016 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Babaloons Builders](https://www.permitgraph.org/contractor/babaloons-builders-943485) | unit #21: kitchen and bathroom remodel. no structural changes. | $24,000 |
| [M586148](https://www.permitgraph.org/p/M586148) | May 11, 2015 | Never finaled: issued May 2015, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | street space |  |
| [201407151291](https://www.permitgraph.org/p/201407151291) | Jul 15, 2014 | Completed: final sign-off Oct 2014 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Babaloons Builders](https://www.permitgraph.org/contractor/babaloons-builders-943485) | unit 63 - remodel kitchen and bath; to comply with cec150(k) 8 & 10. n/a maher ordinance # 155-13 | $26,000 |
| [200905067779](https://www.permitgraph.org/p/200905067779) | May 6, 2009 | Completed: final sign-off Jul 2009 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Fox Brothers Construction Inc](https://www.permitgraph.org/contractor/fox-brothers-construction-inc-706753) | unit # 25: rewire the entire apt/remodel kichen and bathroom; make minor plumbng changes in kitchen & bath. remodel kitchen: new cabinets, granite,flrng & lgtng. remodel bath: retile tub area, new si… | $25,000 |
| [200901291099](https://www.permitgraph.org/p/200901291099) | Jan 29, 2009 | Completed: final sign-off Mar 2009 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Tan's Construction Co](https://www.permitgraph.org/contractor/tan-s-construction-co-583578) | work @ unit# 55 only. kitchen & bath remodel. new cabinets, granite sink, range, floor tile & in bath, retile the tub area & walls around + replace bath vanity. all new lighting, switches, & outlets.… | $30,000 |
| [200510075097](https://www.permitgraph.org/p/200510075097) | Oct 7, 2005 | Expired or cancelled: expired Feb 2016 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [L.C. General Builders Inc.](https://www.permitgraph.org/contractor/l-c-general-builders-inc-485386) | reroofing | $50,000 |
| [200508039284](https://www.permitgraph.org/p/200508039284) | Aug 3, 2005 | Completed: final sign-off Aug 2005 | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | repair damaged concrete parapet wall (emergency repair) | $6,000 |
| [200401063415](https://www.permitgraph.org/p/200401063415) | Jan 6, 2004 | Completed: final sign-off Jan 2004 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Thompson Brooks Inc.](https://www.permitgraph.org/contractor/thompson-brooks-inc-483119) | as built - previous application 200308081572. fire alarm. | $5,000 |
| [M25172](https://www.permitgraph.org/p/M25172) | Oct 9, 2003 | Never finaled: issued Oct 2003, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | street permit |  |
| [200308081572](https://www.permitgraph.org/p/200308081572) | Aug 8, 2003 | Completed: final sign-off Jan 2004 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Thompson Brooks Inc.](https://www.permitgraph.org/contractor/thompson-brooks-inc-483119) | fire life safety - elevator recall upgrade, maintain all service able conduit | $41,000 |
| [M24242](https://www.permitgraph.org/p/M24242) | Jul 9, 2003 | Never finaled: issued Jul 2003, no final | [250 Fell St](https://www.permitgraph.org/a/0816/006) |  | street space |  |
| [200306056330](https://www.permitgraph.org/p/200306056330) | Jun 5, 2003 | Expired or cancelled: expired Apr 2020 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Geo M Robinson & Co](https://www.permitgraph.org/contractor/geo-m-robinson-co-253108) | tie into (e) 3"domestic water supply riser w/1-1/2" new riser to supply 1 sprinkler @ bottom of | $2,200 |
| [200210179252](https://www.permitgraph.org/p/200210179252) | Oct 17, 2002 | Completed: final sign-off Jan 2004 | [250 Fell St](https://www.permitgraph.org/a/0816/006) | [Thompson Brooks Inc.](https://www.permitgraph.org/contractor/thompson-brooks-inc-483119) | re-model of existing elevator | $150,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) (22), [Babaloons Builders](https://www.permitgraph.org/contractor/babaloons-builders-943485) (4), [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) (4), [Thompson Brooks Inc.](https://www.permitgraph.org/contractor/thompson-brooks-inc-483119) (3), [Holland Brooks Builders Inc](https://www.permitgraph.org/contractor/holland-brooks-builders-inc-978946) (2), [Fox Brothers Construction Inc](https://www.permitgraph.org/contractor/fox-brothers-construction-inc-706753), [Geo M Robinson & Co](https://www.permitgraph.org/contractor/geo-m-robinson-co-253108), [L.C. General Builders Inc.](https://www.permitgraph.org/contractor/l-c-general-builders-inc-485386), [Palmera Construction Co](https://www.permitgraph.org/contractor/palmera-construction-co-914674), [Sandbank Construction, Inc](https://www.permitgraph.org/contractor/sandbank-construction-inc-893993), [Tan's Construction Co](https://www.permitgraph.org/contractor/tan-s-construction-co-583578), [U S Prime Contractor Inc](https://www.permitgraph.org/contractor/u-s-prime-contractor-inc-870656)
- Architects: [Joe Kon](https://www.permitgraph.org/professional/joe-kon-S5425)
- Engineers: [Joe Win Kon](https://www.permitgraph.org/professional/joe-win-kon-S5425) (5), [Behruz Vahdani-Sanavi, Ph.D.,P.E](https://www.permitgraph.org/professional/behruz-vahdani-sanavi-ph-d-p-e-C35605), [Gary Ho](https://www.permitgraph.org/professional/gary-ho-S2534), [Joe Kon](https://www.permitgraph.org/professional/joe-kon-C65772)
- Designers: [Hue & Cry Security System](https://www.permitgraph.org/professional/hue-cry-security-system-620587) (2)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0816/006.
