# 616 Hayes St

Block 0806, lot 040. Page: https://www.permitgraph.org/a/0806/040

- City's use: Multi-Family Residential
- Built: 1900
- Stories: 3
- Units: 6
- Rooms: 6 bathrooms
- Building: 5,100 sq ft
- Lot: 2,696 sq ft
- Zoning: RH3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

8 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202304276583](https://www.permitgraph.org/p/202304276583) | Apr 27, 2023 | Completed: final sign-off Oct 2023 | [616 Hayes St](https://www.permitgraph.org/a/0806/040) | [De Brus Construction Inc](https://www.permitgraph.org/contractor/de-brus-construction-inc-1008313) | voluntary seismic retrofit of the ground flr at the rear of the bldg, utilizing wood braces, exsiting beams, posts and post footings to be replaced. | $20,000 |
| [202008151898](https://www.permitgraph.org/p/202008151898) | Aug 15, 2020 | Completed: final sign-off Sep 2020 | [616 Hayes St](https://www.permitgraph.org/a/0806/040) | [Parksway Construction Inc](https://www.permitgraph.org/contractor/parksway-construction-inc-1022141) | re roofing- modified bitumen and laminated shingle roofing systemremoval of existing layers, install modified bitumen membrane with mb baseinstall laminated shingle with 30# asphalt basereplace all m… | $22,800 |
| [M1211527](https://www.permitgraph.org/p/M1211527) | Jun 18, 2020 | Never finaled: issued Jun 2020, no final | [616 Hayes St](https://www.permitgraph.org/a/0806/040) |  | street space |  |
| [201909161685](https://www.permitgraph.org/p/201909161685) | Sep 16, 2019 | Completed: final sign-off Nov 2020 | [616 Hayes St](https://www.permitgraph.org/a/0806/040) | [Chung's Construction Co Inc](https://www.permitgraph.org/contractor/chung-s-construction-co-inc-917976) | remodel kitchen and bathroom in all 6 units, 1,2,3,4,5,6. | $120,000 |
| [M1136967](https://www.permitgraph.org/p/M1136967) | Sep 11, 2019 | Never finaled: issued Sep 2019, no final | [616 Hayes St](https://www.permitgraph.org/a/0806/040) |  | street space |  |
| [201904107665](https://www.permitgraph.org/p/201904107665) | Apr 10, 2019 | Completed: final sign-off Nov 2020 | [616 Hayes St](https://www.permitgraph.org/a/0806/040) | [Chung's Construction Co Inc](https://www.permitgraph.org/contractor/chung-s-construction-co-inc-917976) | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $50,000 |
| [200910209376](https://www.permitgraph.org/p/200910209376) | Oct 20, 2009 | Never finaled: issued Oct 2009, no final | [616 Hayes St](https://www.permitgraph.org/a/0806/040) |  | drywall, mildew, heating, electrical, and painting. | $2,500 |
| [200810103971](https://www.permitgraph.org/p/200810103971) | Oct 10, 2008 | Completed: final sign-off Nov 2008 | [616 Hayes St](https://www.permitgraph.org/a/0806/040) |  | work @ apt#1 only. gernal clean of back of house. remove debris (hall off & dump). repair water damaged flooring & ceiling in paint repaired bathroom. no structural work. to comply w/his nov#2008+009… | $1,800 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Chung's Construction Co Inc](https://www.permitgraph.org/contractor/chung-s-construction-co-inc-917976) (2), [De Brus Construction Inc](https://www.permitgraph.org/contractor/de-brus-construction-inc-1008313), [Parksway Construction Inc](https://www.permitgraph.org/contractor/parksway-construction-inc-1022141)
- Engineers: [Ali Afrasiabi](https://www.permitgraph.org/professional/ali-afrasiabi-S5413), [Kathryn Briggs](https://www.permitgraph.org/professional/kathryn-briggs-S5732)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0806/040.
