# 719 Fillmore St

Block 0803, lot 005. Page: https://www.permitgraph.org/a/0803/005

- City's use: Multi-Family Residential
- Built: 1923
- Stories: 3
- Units: 22
- Rooms: 2 bedrooms, 22 bathrooms
- Building: 11,286 sq ft
- Lot: 5,088 sq ft
- Zoning: RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

12 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202104299596](https://www.permitgraph.org/p/202104299596) | Apr 29, 2021 | Completed: final sign-off Jul 2021 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) | [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503) | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 and include spinkler monitoring; ref pa# 2019-0711-5624; ref sprinkler# 2020-0630-9391 | $25,000 |
| [202006309391](https://www.permitgraph.org/p/202006309391) | Jun 30, 2020 | Completed: final sign-off Jun 2021 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) | [All Star Fire Protection Llc](https://www.permitgraph.org/contractor/all-star-fire-protection-llc-1023631) | 1)installation of new fire sprinklers in a legalized 2 units in 1st floor. 2)connect extg 2nd floor fire sprinklers to new 1s floor system. 3)installation of new 2" fire dedicated underground. | $16,500 |
| [M1207507](https://www.permitgraph.org/p/M1207507) | May 29, 2020 | Never finaled: issued Jun 2020, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | street space |  |
| [M1158028](https://www.permitgraph.org/p/M1158028) | Oct 24, 2019 | Never finaled: issued Oct 2019, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) | [J Reilly Construction](https://www.permitgraph.org/contractor/j-reilly-construction-781313) | street space |  |
| [M1124187](https://www.permitgraph.org/p/M1124187) | Aug 14, 2019 | Never finaled: issued Aug 2019, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | street space |  |
| [201907115624](https://www.permitgraph.org/p/201907115624) | Jul 11, 2019 | Completed: final sign-off Jun 2021 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) | [J Reilly Construction](https://www.permitgraph.org/contractor/j-reilly-construction-781313) | add two accessory dwelling unit on ground fl per ordinance 162-16. retrofit under permit application #201609157832 | $90,000 |
| [M1064447](https://www.permitgraph.org/p/M1064447) | Apr 11, 2019 | Never finaled: issued Apr 2019, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | street space |  |
| [M1014207](https://www.permitgraph.org/p/M1014207) | Dec 7, 2018 | Never finaled: issued Dec 2018, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | street space |  |
| [201810163338](https://www.permitgraph.org/p/201810163338) | Oct 16, 2018 | Completed: final sign-off Sep 2019 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | revision to 201609157832 soft story retrofit change grade beam to l footing at line 1, 2, 3. revised foundation plan, shear walls, holddowns as shown on plans |  |
| [M724513](https://www.permitgraph.org/p/M724513) | Sep 22, 2016 | Never finaled: issued Sep 2016, no final | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | street space |  |
| [201609157832](https://www.permitgraph.org/p/201609157832) | Sep 15, 2016 | Completed: final sign-off Sep 2019 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | soft story compliance: method 2012 iebc appendix 4a, mandatory seismic retrofit per sfbc chapter 34b, building reinforcement retrofit on ground floor, add new foundation, sill anchors, shear cups to… | $80,000 |
| [200206078479](https://www.permitgraph.org/p/200206078479) | Jun 7, 2002 | Expired or cancelled: cancelled Oct 2003 | [719 Fillmore St](https://www.permitgraph.org/a/0803/005) |  | new garage at exist 1st floor. sprinklers under separate permit new construct 1 hour. | $80,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [J Reilly Construction](https://www.permitgraph.org/contractor/j-reilly-construction-781313) (2), [All Star Fire Protection Llc](https://www.permitgraph.org/contractor/all-star-fire-protection-llc-1023631), [Crime Watch Security Sys Llc](https://www.permitgraph.org/contractor/crime-watch-security-sys-llc-808503)
- Engineers: [Hawk Lee](https://www.permitgraph.org/professional/hawk-lee-CE28526) (3)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0803/005.
