# 1 Dr Carlton B Goodlett Pl

Block 0787, lot 001. Page: https://www.permitgraph.org/a/0787/001

- City's use: Commercial Office
- Built: 1900
- Lot: 237,598 sq ft
- Zoning: P
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

39 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202607104847](https://www.permitgraph.org/p/202607104847) | Jul 10, 2026 | Completed: final sign-off Jul 2026 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm as builts. delta 3 includes the final inspection inspection inspectors corrections so the plans match field conditions. ref#202306089630 |  |
| [202606052651](https://www.permitgraph.org/p/202606052651) | Jun 5, 2026 | In progress: filed Jun 2026, not yet issued | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | fire alarm revision for removal of 18 duct detectors and 18 relay modules for existing hvac units that are under 2000 cf and dont reach a combined 2000 cfm in shared spaces ref 202306089630 |  |
| [202603177745](https://www.permitgraph.org/p/202603177745) | Mar 27, 2026 | Completed: final sign-off Aug 2026 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | revision to pa# 202212158453 & 202508062396, scope reduction, updated units requiring duct smoke detectors. |  |
| [202510036737](https://www.permitgraph.org/p/202510036737) | Oct 3, 2025 | In progress: filed Oct 2025, not yet issued | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | prop h:tenant improvement of(e)childcare area within city hall @ ground fl | $1,100,000 |
| [202508062396](https://www.permitgraph.org/p/202508062396) | Aug 19, 2025 | Completed: final sign-off Aug 2026 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | revision to pa# 202212158453, fire smoke dampers are being added to (8) central osa ahus | $100,000 |
| [202508143055](https://www.permitgraph.org/p/202508143055) | Aug 14, 2025 | In progress: filed Aug 2025, not yet issued | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | revision to 202108236905: construction of a steel screen dividez in elevator machine room 4,5,6 in order to separate machine room from skylight well | $5,000 |
| [202507301908](https://www.permitgraph.org/p/202507301908) | Jul 30, 2025 | In progress: issued Jun 2026 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | scope: consist of readily achievable barrier removal of wheelchair lift proposed to allow access from the east entry to the main lobby level removal of existing wheelchair lift, patch and repair of t… | $373,300 |
| [202507251615](https://www.permitgraph.org/p/202507251615) | Jul 25, 2025 | In progress: issued Jul 2025 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | adding 3 smokes, 3 relay modules to elevators | $5,000 |
| [202501037676](https://www.permitgraph.org/p/202501037676) | Jan 3, 2025 | In progress: issued Jan 2025 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [D & S Leong Associates](https://www.permitgraph.org/contractor/d-s-leong-associates-618294) | remove all existing fire sprinkler heads and piping at elevator's machine rooms #s: 4,5,6,10 & 11 per d.r.w. ref permit bldg permit #202108236905. | $2,500 |
| [202408309803](https://www.permitgraph.org/p/202408309803) | Aug 30, 2024 | In progress: issued Aug 2024 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | scope of work is deletion of 3 disable recall switch at the existing fire alarm control unit. deprogrammed 3 elevator recall buttons at the existing fire alarm control unit per elevator state inspect… | $4,235 |
| [202406265306](https://www.permitgraph.org/p/202406265306) | Jun 26, 2024 | In progress: issued Jun 2024 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | adding 1 relay module activate relay in emr smoke detecor for elevator 1,2,3. | $13,362 |
| [202401234440](https://www.permitgraph.org/p/202401234440) | Jan 23, 2024 | Expired or cancelled: withdrawn Aug 2025 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | the proposed project is limitted in scope and consists of readily achievable barrier removal. a wheel chair lift is proposed to allow access from the east entry to the main lobby level. | $597,000 |
| [202306150153](https://www.permitgraph.org/p/202306150153) | Jun 15, 2023 | Never finaled: issued Jun 2023, no final | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | electrical connections for replacement of mechanical heatpumps. | $450,000 |
| [202306089630](https://www.permitgraph.org/p/202306089630) | Jun 8, 2023 | Completed: final sign-off Jul 2026 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 100 duct detectors will be added to provide proper coverage. | $40,000 |
| [202305037014](https://www.permitgraph.org/p/202305037014) | May 3, 2023 | Completed: final sign-off Oct 2026 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [D & S Leong Associates](https://www.permitgraph.org/contractor/d-s-leong-associates-618294) | remove 4 (e) sprinkler heads at elevator machine room & piping per drw. ref to 202108236905 | $2,500 |
| [202212158453](https://www.permitgraph.org/p/202212158453) | Dec 15, 2022 | Completed: final sign-off Aug 2026 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | replace (179)existing water source heat pumps,flexible hose,necessary ductwork & thermostats with new. | $5,800,000 |
| [202208080054](https://www.permitgraph.org/p/202208080054) | Aug 8, 2022 | Completed: final sign-off Mar 2024 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215) | roof - demo (2) ct demo ocp piping removal, (2) new cooling towers, extend/add vfd to electrical | $300,000 |
| [202207057732](https://www.permitgraph.org/p/202207057732) | Jul 5, 2022 | Completed: final sign-off Aug 2022 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Western Roofing Service](https://www.permitgraph.org/contractor/western-roofing-service-180533) | install 88 horizontal lifeline anchors @ roof | $350,000 |
| [202108236905](https://www.permitgraph.org/p/202108236905) | Aug 23, 2021 | Never finaled: issued Dec 2022, no final | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Clw Builders Inc](https://www.permitgraph.org/contractor/clw-builders-inc-825027) | city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installat… | $4,000,000 |
| [202107194653](https://www.permitgraph.org/p/202107194653) | Jul 19, 2021 | Completed: final sign-off Dec 2021 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures. | $200,000 |
| [202106182807](https://www.permitgraph.org/p/202106182807) | Jun 18, 2021 | Completed: final sign-off Dec 2021 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | an addition to an existing fire alarm system, adding new duct detectors and relay to the hvac. 13 duct detectors 13 relay modules | $6,500 |
| [202103257301](https://www.permitgraph.org/p/202103257301) | Mar 25, 2021 | Completed: final sign-off Mar 2022 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | direct replacement of 27 water source heat pumps. | $400,000 |
| [201803022674](https://www.permitgraph.org/p/201803022674) | Mar 2, 2018 | Completed: final sign-off Nov 2019 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | add exterior lights at playground structure and driveway ramp maher na | $9,250 |
| [201712196891](https://www.permitgraph.org/p/201712196891) | Dec 19, 2017 | Completed: final sign-off Feb 2020 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | assesor's office tenant improvement of interior space. the scope include selective demolitio, ada barrier removal, construction of interior low wall partition, architectural finishes and fresh air ve… | $400,000 |
| [201612024014](https://www.permitgraph.org/p/201612024014) | Dec 2, 2016 | Never finaled: issued Dec 2016, no final | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | revision to 201610240972, electrical only. removing every code requirements related to electrical for exception 1 to section 100.0(a) of the calif energy code.project will return area of remodel(city… |  |
| [201610240972](https://www.permitgraph.org/p/201610240972) | Oct 24, 2016 | Completed: final sign-off Jul 2017 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | 3rd floor tenant improvements to revert a server room back to office use (previously converted to server room from office). work includes selective demolitoin, electrical, mechanical, repair/patching… | $144,000 |
| [201608054334](https://www.permitgraph.org/p/201608054334) | Aug 5, 2016 | Completed: final sign-off Mar 2017 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm system replacement. fire alarm device replacement on a like for like basis. revise of existing notification appliances to reconnect to new fire alarm system | $35,000 |
| [M589947](https://www.permitgraph.org/p/M589947) | May 22, 2015 | Never finaled: issued May 2015, no final | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | street space |  |
| [201503302156](https://www.permitgraph.org/p/201503302156) | Mar 30, 2015 | Completed: final sign-off Aug 2015 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'd | $820,000 |
| [201408274826](https://www.permitgraph.org/p/201408274826) | Aug 27, 2014 | Completed: final sign-off Sep 2017 | [1 Dr Carlton B Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Schembri Construction Co Inc](https://www.permitgraph.org/contractor/schembri-construction-co-inc-895145) | installation of generator & fuel tank in areaway at southeast quadrant of bldg & electrical distribution system to provide backup power for bldg during power outage; installation of access door and e… | $1,060,000 |
| [201308204757](https://www.permitgraph.org/p/201308204757) | Aug 20, 2013 | Expired or cancelled: expired Nov 2021 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Aaa Flag & Banner Mfg Co Inc](https://www.permitgraph.org/contractor/aaa-flag-banner-mfg-co-inc-858350) | erect a non electric single faced non illuminated temp banner | $10,000 |
| [201104154219](https://www.permitgraph.org/p/201104154219) | Apr 15, 2011 | Completed: final sign-off Nov 2011 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Nicole's Work Inc](https://www.permitgraph.org/contractor/nicole-s-work-inc-692747) | tenant improvements of sfgtv digital video control rooms no structural work or modification of (e) historical elements new acousticla partition walls (non-structural), lights carpet, minor reconfigur… | $85,000 |
| [200812239103](https://www.permitgraph.org/p/200812239103) | Dec 23, 2008 | Completed: final sign-off Mar 2010 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | provide new way finding accessibility signage along the perimeter of the building. provide door actuators to assist wheel chair persons to operate the doors for buildings entrance |  |
| [200806194902](https://www.permitgraph.org/p/200806194902) | Jun 19, 2008 | Completed: final sign-off Dec 2008 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | existing treasurer's office conference room's low wall to be full height | $45,000 |
| [200712110198](https://www.permitgraph.org/p/200712110198) | Dec 11, 2007 | Completed: final sign-off Sep 2012 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be remove… | $300,000 |
| [200706265132](https://www.permitgraph.org/p/200706265132) | Jun 26, 2007 | Expired or cancelled: expired Nov 2021 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) |  | to erect non-structural sign(banner) |  |
| [200105159248](https://www.permitgraph.org/p/200105159248) | May 15, 2001 | Expired or cancelled: expired Sep 2001 | [400 Van Ness Av](https://www.permitgraph.org/a/0787/001) | [Service West Inc](https://www.permitgraph.org/contractor/service-west-inc-570176) | one-stop:m.tjoae:install 4 herman miller modular stations with 80" high panels | $3,640 |
| [200009130381](https://www.permitgraph.org/p/200009130381) | Sep 13, 2000 | Expired or cancelled: expired Sep 2001 | [1 Dr. Carlton B. Goodlett Pl](https://www.permitgraph.org/a/0787/001) | [Pioneer Roofing Organization](https://www.permitgraph.org/contractor/pioneer-roofing-organization-716235) | reroofing | $50,000 |
| [200006223369](https://www.permitgraph.org/p/200006223369) | Jun 22, 2000 | Expired or cancelled: expired Jun 2001 | [400 Van Ness Av](https://www.permitgraph.org/a/0787/001) |  | revise to 9210669s. construct new wall on south side of city hall main floor | $99,999 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (7), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) (4), [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) (4), [D & S Leong Associates](https://www.permitgraph.org/contractor/d-s-leong-associates-618294) (2), [Aaa Flag & Banner Mfg Co Inc](https://www.permitgraph.org/contractor/aaa-flag-banner-mfg-co-inc-858350), [Clw Builders Inc](https://www.permitgraph.org/contractor/clw-builders-inc-825027), [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215), [Nicole's Work Inc](https://www.permitgraph.org/contractor/nicole-s-work-inc-692747), [Pioneer Roofing Organization](https://www.permitgraph.org/contractor/pioneer-roofing-organization-716235), [Schembri Construction Co Inc](https://www.permitgraph.org/contractor/schembri-construction-co-inc-895145), [Service West Inc](https://www.permitgraph.org/contractor/service-west-inc-570176), [Western Roofing Service](https://www.permitgraph.org/contractor/western-roofing-service-180533)
- Architects: [Carolyn Kiernat](https://www.permitgraph.org/professional/carolyn-kiernat-C28638) (2), [Paul Cooper](https://www.permitgraph.org/professional/paul-cooper-C28490) (2), [Chris Dorman](https://www.permitgraph.org/professional/chris-dorman-C28300), [Gordon Garet Hoy](https://www.permitgraph.org/professional/gordon-garet-hoy-C15879), [Jay Turnbull](https://www.permitgraph.org/professional/jay-turnbull-C7026), [Michael Garavaglia](https://www.permitgraph.org/professional/michael-garavaglia-C14833), [Stanley So](https://www.permitgraph.org/professional/stanley-so-C18185), [Vito Vanoni](https://www.permitgraph.org/professional/vito-vanoni-C27134)
- Engineers: [Antonio Jakosalem](https://www.permitgraph.org/professional/antonio-jakosalem-E15401) (2), [Meng Hsiu Chen](https://www.permitgraph.org/professional/meng-hsiu-chen-M19582) (2), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646) (2), [Todd Ravenscroft](https://www.permitgraph.org/professional/todd-ravenscroft-E17996) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Atif Ammar](https://www.permitgraph.org/professional/atif-ammar-E15324), [Brian Provencal](https://www.permitgraph.org/professional/brian-provencal-M30446), [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828), [Craig W. Ristow](https://www.permitgraph.org/professional/craig-w-ristow-120696), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-S2835), [James Ng](https://www.permitgraph.org/professional/james-ng-M33677), [Juan Arajuo](https://www.permitgraph.org/professional/juan-arajuo-16537), [Mahvash Harms](https://www.permitgraph.org/professional/mahvash-harms-2639), [Peter Yu](https://www.permitgraph.org/professional/peter-yu-S4447), [Raymond Lui](https://www.permitgraph.org/professional/raymond-lui-S4094), [Stanley Coventry](https://www.permitgraph.org/professional/stanley-coventry-83509), [Victor H.W. Tong](https://www.permitgraph.org/professional/victor-h-w-tong-10760)
- Authorized agents: [Johnny Reyes Alvarez](https://www.permitgraph.org/professional/johnny-reyes-alvarez-120696) (2), [Daniel Johnston](https://www.permitgraph.org/professional/daniel-johnston-611215), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646)
- Designers: [Michael Joseph Donahue](https://www.permitgraph.org/professional/michael-joseph-donahue-612153) (2)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0787/001.
