# 604 Fulton St

Block 0782, lot 036. Page: https://www.permitgraph.org/a/0782/036

- City's use: Multi-Family Residential
- Built: 1972
- Lot: 113,438 sq ft
- Zoning: RM2
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

47 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201604134644](https://www.permitgraph.org/p/201604134644) | Apr 13, 2016 | Completed: final sign-off Apr 2017 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) | reroofing. | $210,500 |
| [201604134645](https://www.permitgraph.org/p/201604134645) | Apr 13, 2016 | Completed: final sign-off Apr 2017 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) | reroofing. | $67,905 |
| [201604134647](https://www.permitgraph.org/p/201604134647) | Apr 13, 2016 | Completed: final sign-off Apr 2017 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) | reroofing. | $62,700 |
| [201604134646](https://www.permitgraph.org/p/201604134646) | Apr 13, 2016 | Completed: final sign-off Apr 2017 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) | reroofing. | $207,600 |
| [201509177213](https://www.permitgraph.org/p/201509177213) | Sep 17, 2015 | Completed: final sign-off Nov 2015 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) | reroofing | $175,140 |
| [201410148737](https://www.permitgraph.org/p/201410148737) | Oct 14, 2014 | Completed: final sign-off Aug 2016 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [All Seasons Roofing & Waterproofing Inc.](https://www.permitgraph.org/contractor/all-seasons-roofing-waterproofing-inc-759091) | reroofing | $226,000 |
| [201305227645](https://www.permitgraph.org/p/201305227645) | May 22, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | #950,952,954,956,958,960,962,964,966,968,970,972,974,976,978,980,982,984: replace sliding doors in kind, same location, u factor 0.40 max. | $42,300 |
| [201303041441](https://www.permitgraph.org/p/201303041441) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg #2: replace roof windows in kind unit #660,664,668,672,676, 680 same location, 6 windows 8.4 + 1 end window u.4 | $2,750 |
| [201303041445](https://www.permitgraph.org/p/201303041445) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace in kind roof windows on units #636,638,640,642,644 bldg #6, same location 5 windows .4 | $2,435 |
| [201303041443](https://www.permitgraph.org/p/201303041443) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg #5: replace roof windows in kind units 903,905,907,909,911,913,915,917,919,921,923,925,927,929 same location 14 windows .4 and 1 end window .4 | $6,805 |
| [201303041439](https://www.permitgraph.org/p/201303041439) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg #1: repl roof windows in kind units 803,805,807,809,811,813,815,817,819,821,823,825,827,829,831,833,835,837 same location 18 windows and 1 end window | $8,750 |
| [201303041444](https://www.permitgraph.org/p/201303041444) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 4: replace roof window in kind on units 950,952,954,956,958,960,962,964,966,968,970,972,974,976,978,980,982,984, same location 18 windows .4, 1 end window .4 | $8,750 |
| [201303041442](https://www.permitgraph.org/p/201303041442) | Mar 4, 2013 | Completed: final sign-off Aug 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 3: replace in kind roof windows units #916,920,924,928,932,936,940, 944 same location 8 windows u.4 | $3,853 |
| [201209280897](https://www.permitgraph.org/p/201209280897) | Sep 28, 2012 | Completed: final sign-off Apr 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replaced sliding door in kind for unit #950, 952, 954, 956, 958, 960, 962, 964, 966, 968, 970, 972, 974, 976, 978, 980, 982, 984, 959, 963, 967, 971, 975, 979, 983, 987 & 991. same location. | $43,725 |
| [201208167573](https://www.permitgraph.org/p/201208167573) | Aug 16, 2012 | Completed: final sign-off Oct 2012 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace windows north in kind in units 803, 805,809,811,813,815,817,819,823,827,829,831,833,837, 839 | $15,385 |
| [201206142636](https://www.permitgraph.org/p/201206142636) | Jun 14, 2012 | Completed: final sign-off Oct 2012 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace sliding door in kind. unit: 600/604/608/612/616/620/628/632 - 803-805-807-809-811-813/815-817-819-821-823-825-827-831-833-835-837. 1st floor. | $29,739 |
| [201203065494](https://www.permitgraph.org/p/201203065494) | Mar 6, 2012 | Completed: final sign-off Jun 2012 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | unit# 660, 664, 668, 672, 676, 680- replace lower windows, same for same, not visable from street, max u-factor 0.40. | $7,325 |
| [201112060169](https://www.permitgraph.org/p/201112060169) | Dec 6, 2011 | Completed: final sign-off Jun 2012 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace sliding door & 5 windows in kind. units 636, 638, 640, 642, 644. not visible from street. u-factor less than or equal to 0.40. | $9,550 |
| [201112060167](https://www.permitgraph.org/p/201112060167) | Dec 6, 2011 | Completed: final sign-off Jun 2012 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace sliding door in kind. units -916. 920, 928, 932, 936, 940, 944, 646, 648, 650, 652, 654, 656. u-factor less than or equal to 0.40. not visible from street. | $12,850 |
| [201112060170](https://www.permitgraph.org/p/201112060170) | Dec 6, 2011 | Never finaled: issued Dec 2011, no final | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace sliding doors in kind. unit: 660/664/668/672/676/680. not visible from street. u-factor less than or equal to 0.40. | $9,605 |
| [201109235412](https://www.permitgraph.org/p/201109235412) | Sep 23, 2011 | Completed: final sign-off Jun 2012 | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg #5- replace sliding door in kind. 25 units #903,905,907,909,911,913,915,917,919,921,923,925,927,845,849,853,857,861,865,869,873,877,881,885,889. | $23,575 |
| [201107271201](https://www.permitgraph.org/p/201107271201) | Jul 27, 2011 | Expired or cancelled: expired Apr 2013 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | work in units 950, 952, 954, 956, 960, 962, 964, 966, 968, 972, 974, 976, 978, 980, 982, 984. replace windows in kind and repair metal pan on fire escape landings. u value less 0.4 | $14,300 |
| [201104063617](https://www.permitgraph.org/p/201104063617) | Apr 6, 2011 | Completed: final sign-off May 2011 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | unit #636 & 638-replace 2 windows in kind, same size. not visible from street. max u factor | $1,500 |
| [201104063614](https://www.permitgraph.org/p/201104063614) | Apr 6, 2011 | Completed: final sign-off May 2011 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | unit #668 & 672-replace 2 windows in kind, same size. not visible from street. max u factor | $1,500 |
| [201102220702](https://www.permitgraph.org/p/201102220702) | Feb 22, 2011 | Completed: final sign-off May 2011 | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | #903,905,907,909,911,913,915,917,919,921,923,925,927,929- replace windows in kind, same size, u factor 0.40 max. | $6,750 |
| [201102099917](https://www.permitgraph.org/p/201102099917) | Feb 9, 2011 | Completed: final sign-off May 2011 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | replace roof sheet metal pan unit 970/972. | $2,900 |
| [201008068303](https://www.permitgraph.org/p/201008068303) | Aug 6, 2010 | Completed: final sign-off Feb 2011 | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | unit#913,915,917,921,923 - replace deck coating, repair dividing fence. unit #903-909 - replace 1 window, not visable from street, replace in kind. no structural changes, u-factor =0.40 | $32,500 |
| [M163405](https://www.permitgraph.org/p/M163405) | May 7, 2009 | Never finaled: issued May 2009, no final | [937 Mcallister St](https://www.permitgraph.org/a/0782/036) |  | street space & sidewalk permit only. |  |
| [200809222308](https://www.permitgraph.org/p/200809222308) | Sep 22, 2008 | Completed: final sign-off Nov 2009 | [660 Fulton St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 4: units 660, 664, 676, 680: repair platforms below fire escape; replace 2nd floor windows over fire escape. | $12,894 |
| [200809222304](https://www.permitgraph.org/p/200809222304) | Sep 22, 2008 | Completed: final sign-off Nov 2009 | [636 Fulton St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 6- units 636-644: repair platforms below fire escapes, replace deck coating, repair dividing fences and gates, replace sliding glass doors and windows, patch stucco. | $67,150 |
| [200809222300](https://www.permitgraph.org/p/200809222300) | Sep 22, 2008 | Completed: final sign-off Nov 2009 | [916 Buchanan St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 5- units 916-944: repair platforms below fire escape. units 916-936: replace deck coating, repair dividing fences& gates. units 916-944: replace sliding glass doors and windows, patch stucco | $83,217 |
| [200809222302](https://www.permitgraph.org/p/200809222302) | Sep 22, 2008 | Completed: final sign-off Feb 2010 | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 2: units 907-917 & 923-929 repair platform below fire escape. units 903-929 replace deck coating, repair dividing fences & gates. units 903-929 replace sliding doors, windows, & patch stucco. | $137,187 |
| [200809222305](https://www.permitgraph.org/p/200809222305) | Sep 22, 2008 | Completed: final sign-off Nov 2009 | [959 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 1 - unit 982 buchanan - replace 22 windows. | $32,483 |
| [200809222299](https://www.permitgraph.org/p/200809222299) | Sep 22, 2008 | Completed: final sign-off Nov 2009 | [803 Laguna St](https://www.permitgraph.org/a/0782/036) | [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) | bldg 3-units 819-837 replace deck coating, repair dividing fences & gates. units 815-837 replace sliding glass doors & windows. units 811,813,819-837 - repair platforms below fire escape. | $113,616 |
| [200805051306](https://www.permitgraph.org/p/200805051306) | May 5, 2008 | Completed: final sign-off Jun 2008 | [660 Fulton St](https://www.permitgraph.org/a/0782/036) | [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) | work @ unit# 668 & # 672 only. remove & replace 2 windows (3rd floor) above fire escape. stucco patch around windows. in kind. 0.67 u factor max. | $3,600 |
| [200805051304](https://www.permitgraph.org/p/200805051304) | May 5, 2008 | Completed: final sign-off Jun 2008 | [950 Buchanan St](https://www.permitgraph.org/a/0782/036) | [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) | work @ unit# 958 & # 972 only. remove & replace 2 windows (3rd floor) above fire escape. stucco patch around windows. in kind. 0.67 u factor max. | $3,600 |
| [200805051305](https://www.permitgraph.org/p/200805051305) | May 5, 2008 | Completed: final sign-off Jun 2008 | [916 Buchanan St](https://www.permitgraph.org/a/0782/036) | [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) | work @ unit# 940 only. remove & replace 1 window. stucco patch around windows. install gsm pan below window in kind. 0.67 u factor max. | $1,800 |
| [200803278123](https://www.permitgraph.org/p/200803278123) | Mar 27, 2008 | Completed: final sign-off Jun 2008 | [660 Fulton St](https://www.permitgraph.org/a/0782/036) | [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) | work only in units 672 and 668: remove & reset fire escape on 3rd floor for waterproofing, stucco patch around 3rd floor fire escape | $4,500 |
| [M114109](https://www.permitgraph.org/p/M114109) | Mar 27, 2008 | Never finaled: issued Mar 2008, no final | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) |  | street space permit only. |  |
| [200803247835](https://www.permitgraph.org/p/200803247835) | Mar 24, 2008 | Completed: final sign-off Jun 2008 | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) | remove and re set extg fire escape at 3rd floor for waterproofing. stucco patch around 3rd floor fire escape | $4,500 |
| [200510266616](https://www.permitgraph.org/p/200510266616) | Oct 26, 2005 | Completed: final sign-off Apr 2006 | [970 Buchanan St](https://www.permitgraph.org/a/0782/036) | [Mhr Construction (Jetson Ent)](https://www.permitgraph.org/contractor/mhr-construction-jetson-ent-686751) | window replacement 3 at 970 ,976, and 984 buchanan.1 sliding glass door replacement at 976 buchanan | $10,000 |
| [200510266612](https://www.permitgraph.org/p/200510266612) | Oct 26, 2005 | Completed: final sign-off Apr 2006 | [903 Mcallister St](https://www.permitgraph.org/a/0782/036) | [Mhr Construction (Jetson Ent)](https://www.permitgraph.org/contractor/mhr-construction-jetson-ent-686751) | windows replacement (4) at 903,905,907, and 921 mcallister | $9,000 |
| [200510266619](https://www.permitgraph.org/p/200510266619) | Oct 26, 2005 | Completed: final sign-off Apr 2006 | [819 Laguna St](https://www.permitgraph.org/a/0782/036) | [Mhr Construction (Jetson Ent)](https://www.permitgraph.org/contractor/mhr-construction-jetson-ent-686751) | windows replacement 2 at 819 and 821 laguna | $5,000 |
| [200409224827](https://www.permitgraph.org/p/200409224827) | Sep 22, 2004 | Expired or cancelled: expired Feb 2006 | [815 Laguna St](https://www.permitgraph.org/a/0782/036) |  | rev#200407027966 dryrot (e) repair of damaged beam. all revisions are indicated by 09/20/04 | $1,000 |
| [200407027966](https://www.permitgraph.org/p/200407027966) | Jul 2, 2004 | Expired or cancelled: expired Feb 2006 | [612 Fulton St](https://www.permitgraph.org/a/0782/036) |  | dryrot deck repair and waterproofing on 3 units repair in kind | $11,000 |
| [200303139655](https://www.permitgraph.org/p/200303139655) | Mar 13, 2003 | Completed: final sign-off Aug 2003 | [600 Fulton St](https://www.permitgraph.org/a/0782/036) | [Saarman Construction,Ltd.](https://www.permitgraph.org/contractor/saarman-construction-ltd-450928) | reflash sliding glass door/repair deck/sheet metal/repair & rplc stucco in kind | $24,000 |
| [200212042755](https://www.permitgraph.org/p/200212042755) | Dec 4, 2002 | Completed: final sign-off Aug 2003 | [807 Laguna St](https://www.permitgraph.org/a/0782/036) | [Saarman Construction,Ltd.](https://www.permitgraph.org/contractor/saarman-construction-ltd-450928) | reflash siiding glass door , repair deck, shoot metal flashing ortopping of the deck, one unit only, | $12,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Community Reconstruction Solutions](https://www.permitgraph.org/contractor/community-reconstruction-solutions-327550) (27), [Pioneer Contractors Inc](https://www.permitgraph.org/contractor/pioneer-contractors-inc-777064) (5), [Sykes General Contractors Inc](https://www.permitgraph.org/contractor/sykes-general-contractors-inc-871633) (5), [Mhr Construction (Jetson Ent)](https://www.permitgraph.org/contractor/mhr-construction-jetson-ent-686751) (3), [Saarman Construction,Ltd.](https://www.permitgraph.org/contractor/saarman-construction-ltd-450928) (2), [All Seasons Roofing & Waterproofing Inc.](https://www.permitgraph.org/contractor/all-seasons-roofing-waterproofing-inc-759091)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.