# 1284 Mcallister St

Block 0774, lot 010. Page: https://www.permitgraph.org/a/0774/010

- City's use: Multi-Family Residential
- Built: 1925
- Stories: 3
- Units: 8
- Rooms: 9 bedrooms, 9 bathrooms
- Building: 6,990 sq ft
- Lot: 2,970 sq ft
- Zoning: RM4
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

18 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202409261646](https://www.permitgraph.org/p/202409261646) | Sep 26, 2024 | Completed: final sign-off Oct 2024 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [S.F.A-1 Roofing & Maintenance](https://www.permitgraph.org/contractor/s-f-a-1-roofing-maintenance-742662) | reroofing, modified bitumen, about 25 squares. | $26,700 |
| [201704204411](https://www.permitgraph.org/p/201704204411) | Apr 20, 2017 | Completed: final sign-off Aug 2017 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [A & W Contractors](https://www.permitgraph.org/contractor/a-w-contractors-443478) | replace eighteen milgar wood windows in existing frame. side street; max u-factor 0.32 | $15,000 |
| [201004130145](https://www.permitgraph.org/p/201004130145) | Apr 13, 2010 | Expired or cancelled: expired Apr 2013 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883) | kitchen: remove & replace cabinets & countertops; new sink, faucet, angle stops & water lines. bathroom: replace shower valve, angle stops, toilet & tiling. kitchen: min. 50% light watt in h.e. light… | $18,700 |
| [201001114499](https://www.permitgraph.org/p/201001114499) | Jan 11, 2010 | Completed: final sign-off Apr 2010 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Pioneer Builders](https://www.permitgraph.org/contractor/pioneer-builders-555580) | repair dry rot damage to the front of the builidng at the 1st floor bauy windows and the front tight side of the building. | $10,000 |
| [M187145](https://www.permitgraph.org/p/M187145) | Dec 29, 2009 | Never finaled: issued Dec 2009, no final | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) |  | street space |  |
| [M183012](https://www.permitgraph.org/p/M183012) | Oct 28, 2009 | Never finaled: issued Oct 2009, no final | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) |  | street space only |  |
| [200908124712](https://www.permitgraph.org/p/200908124712) | Aug 12, 2009 | Completed: final sign-off Apr 2010 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Pacific Engineering & Construction Inc.](https://www.permitgraph.org/contractor/pacific-engineering-construction-inc-858547) | install new steel strucure to reinforce support to (e) bay windows from below. install new partial foundation to support the steel struc. at front of building. | $25,000 |
| [200901260760](https://www.permitgraph.org/p/200901260760) | Jan 26, 2009 | Expired or cancelled: cancelled Jan 2026 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) |  |  | $15,000 |
| [200802064168](https://www.permitgraph.org/p/200802064168) | Feb 6, 2008 | Completed: final sign-off Feb 2008 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739) | see attached termite report #08183, items #1 & 2. repair 20' long wall base at west side. | $14,000 |
| [M77564](https://www.permitgraph.org/p/M77564) | Jul 17, 2007 | Never finaled: issued Jul 2007, no final | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) |  | street space |  |
| [200706285467](https://www.permitgraph.org/p/200706285467) | Jun 28, 2007 | Completed: final sign-off Sep 2007 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739) | revision to approved appl. 2007 0612 3686: comply with correction notice issued by inspector kevin mchugh on 6/15/2007 - provide detail for repairing 40 lf of sill w/foundation cap. also, repair dry… | $7,400 |
| [200706123686](https://www.permitgraph.org/p/200706123686) | Jun 12, 2007 | Completed: final sign-off Sep 2007 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739) | see attached termite report #07557, items #2, 3, 4. foundation cap <12" 1/2 repair at 12" o/c | $12,000 |
| [200703075681](https://www.permitgraph.org/p/200703075681) | Mar 7, 2007 | Completed: final sign-off Aug 2007 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883) | laundry room repair in kind. no structural changes. building, plumbing & electrical. no window or door work. fluorescent or by motion sensor. provide ventilation per sfbc1203.3 | $7,000 |
| [M59467](https://www.permitgraph.org/p/M59467) | Mar 5, 2007 | Never finaled: issued Mar 2007, no final | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) |  | street space |  |
| [200507076996](https://www.permitgraph.org/p/200507076996) | Jul 7, 2005 | Completed: final sign-off Oct 2005 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883) | kitchen & bathroom remodels same location unit 1. | $12,500 |
| [200410197234](https://www.permitgraph.org/p/200410197234) | Oct 19, 2004 | Completed: final sign-off Apr 2005 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [Pacific Regional Group Inc](https://www.permitgraph.org/contractor/pacific-regional-group-inc-724703) | replace kchn cbnts and counter/modify plmg as needed/modify plmg/replace bthtub faucet & plmg | $8,500 |
| [200304112060](https://www.permitgraph.org/p/200304112060) | Apr 11, 2003 | Completed: final sign-off May 2003 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [S J Gogol Construction](https://www.permitgraph.org/contractor/s-j-gogol-construction-477484) | repair 1st flr landing (lightwen stairs). | $500 |
| [200202260022](https://www.permitgraph.org/p/200202260022) | Feb 26, 2002 | Completed: final sign-off May 2002 | [1284 Mcallister St](https://www.permitgraph.org/a/0774/010) | [S J Gogol Construction](https://www.permitgraph.org/contractor/s-j-gogol-construction-477484) | install new redwood siding at left side rear breezeway | $1,100 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739) (3), [On-Site Maintenance](https://www.permitgraph.org/contractor/on-site-maintenance-752883) (3), [S J Gogol Construction](https://www.permitgraph.org/contractor/s-j-gogol-construction-477484) (2), [A & W Contractors](https://www.permitgraph.org/contractor/a-w-contractors-443478), [Pacific Engineering & Construction Inc.](https://www.permitgraph.org/contractor/pacific-engineering-construction-inc-858547), [Pacific Regional Group Inc](https://www.permitgraph.org/contractor/pacific-regional-group-inc-724703), [Pioneer Builders](https://www.permitgraph.org/contractor/pioneer-builders-555580), [S.F.A-1 Roofing & Maintenance](https://www.permitgraph.org/contractor/s-f-a-1-roofing-maintenance-742662)
- Architects: [Dean Shibuya](https://www.permitgraph.org/professional/dean-shibuya-C13297)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0774/010.
