# 939 Ellis St

Block 0738, lot 019. Page: https://www.permitgraph.org/a/0738/019

- City's use: Commercial Office
- Built: 1961
- Stories: 7
- Rooms: 12 bathrooms
- Building: 116,000 sq ft
- Lot: 16,500 sq ft
- Zoning: RC4
- Construction type: S

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

55 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202501027611](https://www.permitgraph.org/p/202501027611) | Jan 2, 2025 | In progress: issued Feb 2025 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm t.i. voluntary upgrade. new celluar diater in main elec rm, new monitoring point for dialer | $1,000 |
| [202201146011](https://www.permitgraph.org/p/202201146011) | Jan 14, 2022 | Completed: final sign-off Oct 2022 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Kaiser Foundation Health Plan Inc](https://www.permitgraph.org/contractor/kaiser-foundation-health-plan-inc-370871) | project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference r… | $15,000 |
| [202105271232](https://www.permitgraph.org/p/202105271232) | May 27, 2021 | Completed: final sign-off Mar 2022 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | errcs upgrade - revision to pa #2017-0605-8424 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w… |  |
| [M1209527](https://www.permitgraph.org/p/M1209527) | Jun 11, 2020 | Never finaled: filed Jun 2020, never issued | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | street space |  |
| [202001091508](https://www.permitgraph.org/p/202001091508) | Jan 9, 2020 | Completed: final sign-off Aug 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | add 3 control modules, 2 emr smoke relays, 1 general alarm relay for securty. | $1,584 |
| [201906284647](https://www.permitgraph.org/p/201906284647) | Jun 28, 2019 | Never finaled: issued Jun 2019, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fira alarm ti buildout on 7th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 39 strobes. ref pa #201903195583 | $22,000 |
| [201906284645](https://www.permitgraph.org/p/201906284645) | Jun 28, 2019 | Never finaled: issued Jun 2019, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fira alarm ti buildout on 6th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 35 strobes. ref pa #201903114897 | $22,000 |
| [201906284644](https://www.permitgraph.org/p/201906284644) | Jun 28, 2019 | Never finaled: issued Jun 2019, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fira alarm ti buildout on 5th fl: 3 control relays, 5 smoke detectors, 3 duct detectors, 24 horn/strobes, 31 strobes. ref pa #201903195584 | $22,000 |
| [M1100627](https://www.permitgraph.org/p/M1100627) | Jun 25, 2019 | Never finaled: filed Jun 2019, never issued | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | street space |  |
| [M1100607](https://www.permitgraph.org/p/M1100607) | Jun 25, 2019 | Never finaled: issued Jul 2019, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | street space |  |
| [201906072822](https://www.permitgraph.org/p/201906072822) | Jun 7, 2019 | Never finaled: issued Jun 2019, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | floors 5/6/7: add 307 pendent sprinklers in area of ti. ref t.i. 201903195584/201903195583/201903114897. maher n/a. | $45,000 |
| [M1082427](https://www.permitgraph.org/p/M1082427) | May 20, 2019 | Never finaled: filed May 2019, never issued | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | street space |  |
| [201904269125](https://www.permitgraph.org/p/201904269125) | Apr 26, 2019 | Completed: final sign-off Feb 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Gidel & Kocal Construction Co Inc](https://www.permitgraph.org/contractor/gidel-kocal-construction-co-inc-403050) | all levels; barrier removal. | $105,000 |
| [201904269121](https://www.permitgraph.org/p/201904269121) | Apr 26, 2019 | Completed: final sign-off Nov 2019 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Aqualine Piping Inc.](https://www.permitgraph.org/contractor/aqualine-piping-inc-962056) | interior waste line upgrades, 3 floor penetrations at entry level to the roof. total of 7 levels. | $85,000 |
| [201904157973](https://www.permitgraph.org/p/201904157973) | Apr 15, 2019 | Completed: final sign-off Jul 2021 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217), [Granite Excavation & Demolition Inc](https://www.permitgraph.org/contractor/granite-excavation-demolition-inc-609169) | install temporary shoring & underpinning along property lines to allow excavation for new development at 830 eddy. tie backs from northern row of soldier beams will enchroach onto 939 ellis st.**mahe… | $100,000 |
| [201904047074](https://www.permitgraph.org/p/201904047074) | Apr 4, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 7th fl - mep for tenant improvement ref pa 2019-0319-5583 | $500,000 |
| [201904047075](https://www.permitgraph.org/p/201904047075) | Apr 4, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 5th fl - mep for tenant improvement ref pa 2019-0319-5584 | $500,000 |
| [201903195584](https://www.permitgraph.org/p/201903195584) | Mar 19, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not req | $883,000 |
| [201903195583](https://www.permitgraph.org/p/201903195583) | Mar 19, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facility | $883,000 |
| [201903135077](https://www.permitgraph.org/p/201903135077) | Mar 13, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 6th floor: mechanical, electrical and plumbing for 201903114897 | $567,000 |
| [201903114897](https://www.permitgraph.org/p/201903114897) | Mar 11, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) | 6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mep | $883,000 |
| [201812037284](https://www.permitgraph.org/p/201812037284) | Dec 3, 2018 | Completed: final sign-off Nov 2019 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | remove and replace extg boiler like for like and provide new piping connections. n/a for maher | $247,000 |
| [201707242746](https://www.permitgraph.org/p/201707242746) | Jul 24, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | administrative correction to existing pa 2015-0518-6561 to correct special inspections |  |
| [201707050999](https://www.permitgraph.org/p/201707050999) | Jul 5, 2017 | Completed: final sign-off Dec 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm as built drawing for relocated emergency generator. ref pa 2016-1121-3180. maher na |  |
| [201706139192](https://www.permitgraph.org/p/201706139192) | Jun 13, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to pa 2017-0309-1114 relocation of fuel port to exterior wall per district inspector's request addition of code required shut off |  |
| [201706058424](https://www.permitgraph.org/p/201706058424) | Jun 5, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | g/f- emergency responder radio coverage system. n/a ordinance #155-13 | $35,000 |
| [201705317995](https://www.permitgraph.org/p/201705317995) | May 31, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | modify sprinker system to accomodate relocation of an (e) non conforming generator to a new bldg. code compliant room enclosure, ref pa 201703091114, design density to 0.4 | $3,500 |
| [201703091114](https://www.permitgraph.org/p/201703091114) | Mar 9, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | relocation of an (e) non conforming generator to a new building code complaint room/enclosure with a 2 hr fire separation from (e) structure. maher na | $35,000 |
| [201701237632](https://www.permitgraph.org/p/201701237632) | Jan 23, 2017 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | 19 evaucation maps to be reviewed by sffd only (all floors) floors b, 1, 2, 3, 4, 5, 6, 7, roof. n/a maher ordinance | $4,700 |
| [201612215572](https://www.permitgraph.org/p/201612215572) | Dec 21, 2016 | Completed: final sign-off Jan 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | basement: scope is to add elevator equipment room in basement elevator #3 only. revision to 201511193144 maher na | $35,000 |
| [201611213180](https://www.permitgraph.org/p/201611213180) | Nov 21, 2016 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti for appl #2015-1119-3144 r1, #2016-0613-9802. including 1 pullstation, 14 input modules, 2 booster power supplies, 8 sync modules, 14 smoke detectors, 93 hornstrobes, 16 relays and 13 d… | $35,000 |
| [201610049496](https://www.permitgraph.org/p/201610049496) | Oct 4, 2016 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | maintain circuitry to(e)garage,stor rm&closets.safe off&demo bldg core&tenant litg/recp.minor abandon data sys-clean(e) dnbros&feeders-torque terminator.install led litg&pwr in elev lobbies&rr, t-24… | $559,000 |
| [M697887](https://www.permitgraph.org/p/M697887) | Jun 14, 2016 | Never finaled: issued Jun 2016, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | street space |  |
| [201606139802](https://www.permitgraph.org/p/201606139802) | Jun 13, 2016 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126) | demolition of extg hvac equipment. refurbish extg air handling unit and boiler. provide co monitoring of garage. install 6 package uints and new vrv system with 12 fan coils, 5 condensing units with… | $850,000 |
| [201606099586](https://www.permitgraph.org/p/201606099586) | Jun 9, 2016 | Completed: final sign-off Jan 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | administrative permit to correct official story-count from 7 to 8. previous parking stories were labeled basement. no construction.n/a for maher. |  |
| [201605258399](https://www.permitgraph.org/p/201605258399) | May 25, 2016 | Completed: final sign-off Jan 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | fully sprinkler existing building to nfpa 13 per ab-005 exit constraints. seismic upgrade existing partial wet pipe systems. after completion of installation & final insp well remove class 2 standpip… | $374,310 |
| [201511193144](https://www.permitgraph.org/p/201511193144) | Nov 19, 2015 | Completed: final sign-off Jul 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | interior core for full building including (n) ada bathrooms, (n) elevators, updated rooftop. mep, sprinklers and fire alarm separate permit. office ti separate permit. ** maher: n/a ** | $3,000,000 |
| [201505186561](https://www.permitgraph.org/p/201505186561) | May 18, 2015 | Completed: final sign-off Jan 2017 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Balfour Beatty Construction Llc](https://www.permitgraph.org/contractor/balfour-beatty-construction-llc-979126), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | facde renovate w/ new cladding on building, and the rooftop will be updated to provide private roof-top space for tenants. maher ordinance ext is not required. | $5,670,128 |
| [201108303532](https://www.permitgraph.org/p/201108303532) | Aug 30, 2011 | Completed: final sign-off Feb 2012 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | 3rd floor - reconfigure existing zone to serve office, add new (1) vav & serve single office, not going through any walls, no new ductwork. | $9,500 |
| [201105176190](https://www.permitgraph.org/p/201105176190) | May 17, 2011 | Completed: final sign-off Jul 2011 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | to obtain final inspection for work approved under pa 200906231114; all work is complete |  |
| [201102220708](https://www.permitgraph.org/p/201102220708) | Feb 22, 2011 | Completed: final sign-off Jul 2011 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Accel Air Systems Inc.](https://www.permitgraph.org/contractor/accel-air-systems-inc-827523) | replace small unit ( split system unit) ac and outdoor unit. install dehumidification unit | $50,000 |
| [201007227260](https://www.permitgraph.org/p/201007227260) | Jul 22, 2010 | Never finaled: issued Jul 2010, no final | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to pa# 2009-0623-1114-strengthening of (e) concrete joists, fire alarm, sprinkler, mechanical under seperate permits | $12,000 |
| [201005182649](https://www.permitgraph.org/p/201005182649) | May 18, 2010 | Completed: final sign-off Jul 2011 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti for 6th fl. add 1 monitor module, 1 smoke detector, 2 control relays, 1 duct detector | $12,980 |
| [201003269052](https://www.permitgraph.org/p/201003269052) | Mar 26, 2010 | Expired or cancelled: expired May 2013 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th floor-mechanical, electrical work associated with approved pa# 2010-0316-8311 including new ac untis, 2 new fsd & lighting | $58,500 |
| [201003168311](https://www.permitgraph.org/p/201003168311) | Mar 16, 2010 | Completed: final sign-off Jul 2011 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th floor-minor tenant improvement & server rm. mech. & electrical under separate permit. | $45,000 |
| [200911171358](https://www.permitgraph.org/p/200911171358) | Nov 17, 2009 | Completed: final sign-off Jan 2010 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm t.i. for 5th. flr.; relocation (e) strobes & horn/strobes. | $4,700 |
| [200911050613](https://www.permitgraph.org/p/200911050613) | Nov 5, 2009 | Completed: final sign-off Jan 2010 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 5th floor -demolition of non-load bearing partitions, install new light fixtures & switches, new gyp bd., ceiling, new drinking fountain & new finishes. minor mechanical modification, elec work under… | $24,300 |
| [200909106474](https://www.permitgraph.org/p/200909106474) | Sep 10, 2009 | Completed: final sign-off Jun 2010 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | title 24 calculations for lighting. reference application 200908195190 | $3,500 |
| [200909106477](https://www.permitgraph.org/p/200909106477) | Sep 10, 2009 | Completed: final sign-off Nov 2009 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | 7th floor-fire alarm t.i for "conference room"-add 1 horn/strobe | $3,780 |
| [200908195190](https://www.permitgraph.org/p/200908195190) | Aug 19, 2009 | Completed: final sign-off Jun 2010 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | removal and construction of non-load bearing partitions. new acoustical ceilings and new light fixtures. new office doors and finishes. new striping for accessible parking in garage. mechanical and e… | $25,000 |
| [200907233331](https://www.permitgraph.org/p/200907233331) | Jul 23, 2009 | Expired or cancelled: cancelled Jan 2026 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | demolition and construction of non-load bearing partitions, relocate light fixtures and repair gyp. bd. ceiling at affected area; new office doors and new finishes. | $25,000 |
| [200906231114](https://www.permitgraph.org/p/200906231114) | Jun 23, 2009 | Expired or cancelled: expired Jan 2011 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) |  | 6th floor-modification to (e) 6th floor. work includes demolition & construction of non-bearing partitions, new ceiling grid & tiles to align with (e). relocate light fixtures, new office doors, new… | $33,000 |
| [200806174659](https://www.permitgraph.org/p/200806174659) | Jun 17, 2008 | Expired or cancelled: expired Jan 2012 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Accel Air Systems Inc.](https://www.permitgraph.org/contractor/accel-air-systems-inc-827523) | add 2 - 2 ton split system air conditiones, for computer server room on 6th floor. | $25,070 |
| [200404141302](https://www.permitgraph.org/p/200404141302) | Apr 14, 2004 | Expired or cancelled: withdrawn Jun 2004 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [Benjamin Gilmore Bolles](https://www.permitgraph.org/contractor/benjamin-gilmore-bolles-537565) | upgrade life safety system; newfire alarm system | $250,000 |
| [200310319108](https://www.permitgraph.org/p/200310319108) | Oct 31, 2003 | Completed: final sign-off Jun 2004 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing | $353,387 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) (7), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (7), [Xl Construction, Corporation](https://www.permitgraph.org/contractor/xl-construction-corporation-647480) (6), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (4), [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) (3), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) (3), [Accel Air Systems Inc.](https://www.permitgraph.org/contractor/accel-air-systems-inc-827523) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) (2), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (2), [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) (2), [Aqualine Piping Inc.](https://www.permitgraph.org/contractor/aqualine-piping-inc-962056), [Balfour Beatty Construction Llc](https://www.permitgraph.org/contractor/balfour-beatty-construction-llc-979126), [Bay City Mechanical Inc](https://www.permitgraph.org/contractor/bay-city-mechanical-inc-645126), [Benjamin Gilmore Bolles](https://www.permitgraph.org/contractor/benjamin-gilmore-bolles-537565), [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513), [Gidel & Kocal Construction Co Inc](https://www.permitgraph.org/contractor/gidel-kocal-construction-co-inc-403050), [Granite Excavation & Demolition Inc](https://www.permitgraph.org/contractor/granite-excavation-demolition-inc-609169), [Kaiser Foundation Health Plan Inc](https://www.permitgraph.org/contractor/kaiser-foundation-health-plan-inc-370871), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053), [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217)
- Architects: [Sujendra Mishra](https://www.permitgraph.org/professional/sujendra-mishra-C32978) (5), [Daniel Roach](https://www.permitgraph.org/professional/daniel-roach-C33282) (3), [Scott B. Peterson](https://www.permitgraph.org/professional/scott-b-peterson-32452) (2), [Michael Moores](https://www.permitgraph.org/professional/michael-moores-C23999)
- Engineers: [Jason Lau](https://www.permitgraph.org/professional/jason-lau-E16806) (3), [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828) (2), [Eunice Yoon](https://www.permitgraph.org/professional/eunice-yoon-M16881) (2), [Erwin O'toole](https://www.permitgraph.org/professional/erwin-o-toole-C80734), [Eunice Yoon](https://www.permitgraph.org/professional/eunice-yoon-M36681)
- Designers: [Keith Lattin](https://www.permitgraph.org/professional/keith-lattin-PG1232371)
- Pmt consultant/expediters: [Southwest Sign Co.](https://www.permitgraph.org/professional/southwest-sign-co-724924)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.