# 1100 Ellis St

Block 0711, lot 031. Page: https://www.permitgraph.org/a/0711/031

- City's use: Commercial Misc
- Built: 1967
- Stories: 2
- Units: 2
- Rooms: 24 bathrooms
- Building: 99,934 sq ft
- Lot: 61,105 sq ft
- Zoning: RM4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

29 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202606022356](https://www.permitgraph.org/p/202606022356) | Jun 2, 2026 | Completed: final sign-off Oct 2026 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | deferred electrical plans for pa #202604179653 | $86,000 |
| [202605271973](https://www.permitgraph.org/p/202605271973) | May 27, 2026 | Completed: final sign-off Oct 2026 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | 1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain. | $100,000 |
| [202604179653](https://www.permitgraph.org/p/202604179653) | Apr 17, 2026 | Completed: final sign-off Oct 2026 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | 1/fl-reconfiguration of (e) admin offices and classroom. a unisex restroom will be made accessible | $340,536 |
| [202204132119](https://www.permitgraph.org/p/202204132119) | Apr 13, 2022 | Never finaled: issued Apr 2022, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | to obtain final inspection for work approved under bpa#201805118869. all work complete. |  |
| [202107063773](https://www.permitgraph.org/p/202107063773) | Jul 6, 2021 | Completed: final sign-off Sep 2021 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677) | hvac power upgrades for the floor classrooms. | $200,000 |
| [202106293448](https://www.permitgraph.org/p/202106293448) | Jun 29, 2021 | Completed: final sign-off Aug 2021 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | modifty (e) f/a system. install 20 new duct smoke sensors at new hvac unit supply ducting on the 2/f, classroom. ref t.i. pa202104208952. | $22,000 |
| [202104208952](https://www.permitgraph.org/p/202104208952) | Apr 20, 2021 | Completed: final sign-off Aug 2021 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | hvac upgrades to 2nd floor classrooms. | $700,000 |
| [202008212357](https://www.permitgraph.org/p/202008212357) | Aug 21, 2020 | Completed: final sign-off Oct 2020 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | entry lobby: modify extg fire alarm system provide and replace (2) pull stations and 4 horn strobe. | $1,500 |
| [202007079760](https://www.permitgraph.org/p/202007079760) | Jul 7, 2020 | Never finaled: issued Jul 2020, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | relocate 12 sprinklers 201912189885 | $6,000 |
| [201912189885](https://www.permitgraph.org/p/201912189885) | Dec 18, 2019 | Completed: final sign-off Oct 2020 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | soft demo of existing lobby finishes. new lighting, flooring, paint, & misc. finishes. lobby ti. no change in use or occupancy | $500,000 |
| [201811276730](https://www.permitgraph.org/p/201811276730) | Nov 27, 2018 | Never finaled: issued Dec 2018, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | revision to pa 201805118869. change of mechanical drawings to reflect change of number of condensing units. change to 3 condensing units | $8,000 |
| [201811075250](https://www.permitgraph.org/p/201811075250) | Nov 7, 2018 | Completed: final sign-off Jan 2019 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | add 2 duct det and 2 control modules in fire alarm system in the area of work as shown on dwg. ref 201808177647 | $4,225 |
| [M979367](https://www.permitgraph.org/p/M979367) | Sep 14, 2018 | Never finaled: issued Sep 2018, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) |  | street space |  |
| [201808177647](https://www.permitgraph.org/p/201808177647) | Aug 17, 2018 | Completed: final sign-off Jan 2019 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | adding 1 initating device (duct det) and 5 notification devices (horn/strobes) in (e) fire alarm system | $3,274 |
| [201805118869](https://www.permitgraph.org/p/201805118869) | May 11, 2018 | Never finaled: issued May 2018, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | interior ti to (e) chorus room 2300 sq ft with upgraded finishes. ref pa 2008-0818-9440 | $345,000 |
| [201803204162](https://www.permitgraph.org/p/201803204162) | Mar 20, 2018 | Completed: final sign-off Apr 2018 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) | soft demo of (e) choral room. includes demo of walls ceilings and finishes per ab-017 | $25,000 |
| [201007126386](https://www.permitgraph.org/p/201007126386) | Jul 12, 2010 | Expired or cancelled: expired Mar 2013 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Stripe Inc. Dba Garnett Sign Studio](https://www.permitgraph.org/contractor/stripe-inc-dba-garnett-sign-studio-743512) | new evacuation signs. maps for basement, floors 1, 1r, 2 and 2r | $750 |
| [M209047](https://www.permitgraph.org/p/M209047) | Jun 29, 2010 | Never finaled: issued Jun 2010, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) |  | street space |  |
| [201004291346](https://www.permitgraph.org/p/201004291346) | Apr 29, 2010 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | revision to application number 200910169178. remove control room in the scope of work (part of unsprinklered building) revise piping in lobby area to miss lights & beams. |  |
| [M199427](https://www.permitgraph.org/p/M199427) | Apr 27, 2010 | Never finaled: issued Apr 2010, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) |  | street space |  |
| [200912223649](https://www.permitgraph.org/p/200912223649) | Dec 22, 2009 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) | install 6" undergrond fire service from curb to building. install 6" double detector check assembly | $4,800 |
| [200912213618](https://www.permitgraph.org/p/200912213618) | Dec 21, 2009 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Simplex Grinnell](https://www.permitgraph.org/contractor/simplex-grinnell-802591) | fire alarm t.i. to mezzanine, 1st. flr., basement and theater area. includes the addition of 1-facp, 2-booster panels, 1-lcd annunciator, 12-pull stations, 23-smoke detectors 2-heat detectors, 7-duct… | $18,500 |
| [M182987](https://www.permitgraph.org/p/M182987) | Oct 28, 2009 | Never finaled: issued Oct 2009, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) |  | street space permit |  |
| [200910169178](https://www.permitgraph.org/p/200910169178) | Oct 16, 2009 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | revision to 200907283612. add sprinklers in mech room of existing building. remove sprinklers underneath open tension grid in stage area. move fie hose rac k and reroute main in auditorium to miss cu… |  |
| [200907283612](https://www.permitgraph.org/p/200907283612) | Jul 28, 2009 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | install new fire sprinkler system in new theater. work shall start from flange inside of building. new theater under application # 200808189440. | $90,000 |
| [M174125](https://www.permitgraph.org/p/M174125) | Jul 27, 2009 | Never finaled: issued Jul 2009, no final | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) |  | street space |  |
| [200907243398](https://www.permitgraph.org/p/200907243398) | Jul 24, 2009 | Completed: final sign-off Aug 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) | tower crane foundation . pa# 2008.08.18.9440 for ref. | $40,000 |
| [200907102353](https://www.permitgraph.org/p/200907102353) | Jul 10, 2009 | Completed: final sign-off Apr 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) | temporary scaffolding bridge over sidewalk, install for pedestrian walkway for work related to pa# 200808189440. for construction personnel and construction site access only. | $10,000 |
| [200808189440](https://www.permitgraph.org/p/200808189440) | Aug 18, 2008 | Completed: final sign-off Oct 2010 | [1100 Ellis St](https://www.permitgraph.org/a/0711/031) | [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) | addition of a new theater building within an (e) courtyard, in addition to new support spaces for the theater. scope of project also includes renovation of (e) school bldg. update accessible bathroom… | $12,200,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Guzman Construction Group Inc.](https://www.permitgraph.org/contractor/guzman-construction-group-inc-1010621) (8), [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) (4), [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) (4), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (3), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (2), [Paganini Electric Corp(See Signatories)](https://www.permitgraph.org/contractor/paganini-electric-corp-see-signatories-309677), [Simplex Grinnell](https://www.permitgraph.org/contractor/simplex-grinnell-802591), [Stripe Inc. Dba Garnett Sign Studio](https://www.permitgraph.org/contractor/stripe-inc-dba-garnett-sign-studio-743512)
- Architects: [Jeffrey Evans](https://www.permitgraph.org/professional/jeffrey-evans-C32430) (2), [Andrew Dunbar](https://www.permitgraph.org/professional/andrew-dunbar-C28143), [Ronald Case](https://www.permitgraph.org/professional/ronald-case-C12346)
- Engineers: [Alexander Pacheco](https://www.permitgraph.org/professional/alexander-pacheco-E19378) (2), [Brian Unekis](https://www.permitgraph.org/professional/brian-unekis-M35980), [Christopher Jordan Malabed](https://www.permitgraph.org/professional/christopher-jordan-malabed-M41544), [Elisabeth M Allen](https://www.permitgraph.org/professional/elisabeth-m-allen-E17659), [Rodolfo Bustos](https://www.permitgraph.org/professional/rodolfo-bustos-M37462)
- Authorized agents: [Zachary Tang](https://www.permitgraph.org/professional/zachary-tang-1010621) (2), [Tyrel Carrigan](https://www.permitgraph.org/professional/tyrel-carrigan-986047)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0711/031.