# 1100 Van Ness Av

Block 0694, lot 010. Page: https://www.permitgraph.org/a/0694/010

The city's assessor roll has no record for this parcel.

## Permits filed here

84 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202106182805](https://www.permitgraph.org/p/202106182805) | Jun 18, 2021 | Never finaled: issued Sep 2021, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler head locations to accomodate new ceiling & partition layout for new office space on 2nd, 8th, 10 floor & roof. total sprinklers this project = 135 building pa ref#2020-0825-2611 | $36,390 |
| [202105261131](https://www.permitgraph.org/p/202105261131) | May 26, 2021 | Completed: final sign-off Jan 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919) | red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged. | $10,000 |
| [202105261138](https://www.permitgraph.org/p/202105261138) | May 26, 2021 | Never finaled: issued Jun 2021, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | record set-sffd: only for review of previously approved drawings which were incorrectly n/a'd by sffd. this is a record set to document sffd review & approval of the t.i. submittal drawings. ref. t.i… |  |
| [202105049788](https://www.permitgraph.org/p/202105049788) | May 4, 2021 | Completed: final sign-off Jul 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761) | g/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes.… | $182,700 |
| [202101263327](https://www.permitgraph.org/p/202101263327) | Jan 26, 2021 | Completed: final sign-off Jan 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [The Boldt Company](https://www.permitgraph.org/contractor/the-boldt-company-624683) | this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2 | $13,400 |
| [202008252611](https://www.permitgraph.org/p/202008252611) | Aug 25, 2020 | Completed: final sign-off Jan 2023 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 2nd fl: lobby add new vestibule. 8th fl: new clinical lab & office ti. 9th fl: new 2 hr fire rated duct shafts. 10th fl: new 2 hr duct shafts & new 877 usf freezer storage room. rooftop: new air hand… | $3,100,000 |
| [202008242523](https://www.permitgraph.org/p/202008242523) | Aug 24, 2020 | Completed: final sign-off Dec 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | modification of existing hardware on levels 4, 5 and 6 | $160,000 |
| [202008222373](https://www.permitgraph.org/p/202008222373) | Aug 22, 2020 | Completed: final sign-off Dec 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | modification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher | $160,000 |
| [202003036058](https://www.permitgraph.org/p/202003036058) | Mar 3, 2020 | Completed: final sign-off Aug 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical r… | $620,000 |
| [201912300931](https://www.permitgraph.org/p/201912300931) | Dec 30, 2019 | Expired or cancelled: cancelled Jan 2026 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | install (5) dual-port charging station for electrical vehicles by 'chargepoint' at garage level g3. install (2) steel bollards at each station and add electrical eqiupment at (e) electrical room. | $60,000 |
| [201911157375](https://www.permitgraph.org/p/201911157375) | Nov 15, 2019 | Completed: final sign-off Nov 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | suite 1040: 9 speakers/strobes, 4 strobes added to fire alarm. ref tenant improvement 201909101126. maher n/a. | $7,825 |
| [201910215010](https://www.permitgraph.org/p/201910215010) | Oct 21, 2019 | Completed: final sign-off Mar 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | fire sprinkler ti - add 31 pendent off existing shell system ref pa 2019-0910-1126 | $8,150 |
| [201909101126](https://www.permitgraph.org/p/201909101126) | Sep 10, 2019 | Completed: final sign-off Feb 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | 10th fl, ste 1000 - tenant improvement for office space - 3000 sf new non rated partitions, acoustical ceiling, mechanical & electrical | $300,000 |
| [201908017590](https://www.permitgraph.org/p/201908017590) | Aug 1, 2019 | Completed: final sign-off Oct 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 2/f: water leak repairs-drywall removal/reinstallation in-kind, 1 flush valve replacement, ceiling tile replacement, electrical repairs, flooring removal/reinstall, medical equipment installation, mo… | $2,500,000 |
| [201902062176](https://www.permitgraph.org/p/201902062176) | Feb 6, 2019 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details |  |
| [201902062178](https://www.permitgraph.org/p/201902062178) | Feb 6, 2019 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details |  |
| [201901039607](https://www.permitgraph.org/p/201901039607) | Jan 3, 2019 | Expired or cancelled: cancelled Oct 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | storm water reuse/retention. pid plan review. per #pw20160719130 issued 7/19/16. per #pp20181012693 issued 10/12/18. maher n/a. |  |
| [201812148356](https://www.permitgraph.org/p/201812148356) | Dec 14, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 10/f: ref pa# 201806262985; fati st# 1040 - 9 speaker/strobe, 9 strobes, 1 control relay, 5 speaker, 1 booster panel | $12,000 |
| [201812148355](https://www.permitgraph.org/p/201812148355) | Dec 14, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | ref pa# 201810264261; fire alarm t.i. on 2nd fl. 5 speaker/strobes, 1 strobe (2nd fl.) | $6,700 |
| [201812148352](https://www.permitgraph.org/p/201812148352) | Dec 14, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 9/f: ref pa# 201806262990; 3 speaker/strobes, 1 control relay, 2 speakrs | $5,500 |
| [201812148354](https://www.permitgraph.org/p/201812148354) | Dec 14, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 10/f: ref pa# 201806262993; fire alarm t.i. # 1005 - 6 speaker/strobes, 6 strobes, 4 speakrs (10th fl) | $10,000 |
| [201811296950](https://www.permitgraph.org/p/201811296950) | Nov 29, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | 2nd floor - fire sprinkler 18 relocated heads on 2nd level ref 201708255962 | $3,540 |
| [201811155965](https://www.permitgraph.org/p/201811155965) | Nov 15, 2018 | Completed: final sign-off May 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf |  |
| [201811135711](https://www.permitgraph.org/p/201811135711) | Nov 13, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | 10th flo0r, suite 1005 - fire sprinklers 24 reloate 2 added suite 1005 ref 201806262993 | $6,993 |
| [201811135712](https://www.permitgraph.org/p/201811135712) | Nov 13, 2018 | Completed: final sign-off Jan 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | 10 floor - fire sprinklers: relocate 31, dded 5 suite 1040 ref 201806262985 | $10,394 |
| [201811135710](https://www.permitgraph.org/p/201811135710) | Nov 13, 2018 | Completed: final sign-off Jan 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | 9th floor - fire sprinklers: relocate 6, add 1 suite 901 ref 201806262990 | $2,158 |
| [201811095530](https://www.permitgraph.org/p/201811095530) | Nov 9, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 6th fl. fire sprinkler t.i. ref pa# 201804166404 n/a maher | $45,000 |
| [201811095533](https://www.permitgraph.org/p/201811095533) | Nov 9, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 7th fl. fire sprinkler t.i. ref pa# 201804166404 n/a maher | $45,000 |
| [201811014734](https://www.permitgraph.org/p/201811014734) | Nov 1, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 7th fl ref 201710131168 2 smoke detectors, 77 speakers/strobes, 2 speakers, 37 strobes, 2 power supplies | $25,000 |
| [201811014738](https://www.permitgraph.org/p/201811014738) | Nov 1, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on 2nd fl 201710201778, 4 smoke det, 112 speakers/strobes, 30 speakers, 48 strobes, 42 power supplies | $50,000 |
| [201811014737](https://www.permitgraph.org/p/201811014737) | Nov 1, 2018 | Completed: final sign-off May 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti, 1st fl ref 201710131164 1 smoke detector, 1 speaker strobe | $5,000 |
| [201810304533](https://www.permitgraph.org/p/201810304533) | Oct 30, 2018 | Completed: final sign-off Jan 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | revision to bpa # 2018-0424-7151. revised mounting. 2 "p" sign. | $500 |
| [201810264220](https://www.permitgraph.org/p/201810264220) | Oct 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't r… |  |
| [201810264261](https://www.permitgraph.org/p/201810264261) | Oct 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | revision to bpa 201708255962. for fire review only. |  |
| [201810243977](https://www.permitgraph.org/p/201810243977) | Oct 24, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details |  |
| [201810243985](https://www.permitgraph.org/p/201810243985) | Oct 24, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details |  |
| [201809180556](https://www.permitgraph.org/p/201809180556) | Sep 18, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 5th floor - fire alarm ti. 1 amplifier, 2 smoke det, 3 power supplies, 21 speakers, 65 speaker strobes, 37 strobes | $25,000 |
| [201809180557](https://www.permitgraph.org/p/201809180557) | Sep 18, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 6th floor - fire alarm ti ref 201709279722, 1 amplifier, 2 smoke detectors , 3 power supplies, 20 speakers, 65 speaker strobes, 32 strobes | $25,000 |
| [201809048980](https://www.permitgraph.org/p/201809048980) | Sep 4, 2018 | Completed: final sign-off Dec 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 2nd floor - fire sprinkler ti 169 heads ref 201808311897 | $45,000 |
| [201809048979](https://www.permitgraph.org/p/201809048979) | Sep 4, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 3rd floor - fire sprinkler ti 281 heads ref 201808311897 | $45,000 |
| [201808318917](https://www.permitgraph.org/p/201808318917) | Aug 31, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 2nd/3rd fl: a/mep revision & adding work to #201710201778. revision are minor, new mri adding sq ft to the whole scope (project is oshpd 3), cryovent for liquid helium, inert | $35,000 |
| [201808217937](https://www.permitgraph.org/p/201808217937) | Aug 21, 2018 | Completed: final sign-off Dec 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | revision to 2011-1209-0400s6 for fire alarm & 2-way ecs in medical office building. maher n/a. |  |
| [201808217835](https://www.permitgraph.org/p/201808217835) | Aug 21, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 4th flr - fire alarm ti - 2 smk det, 98 speaker/strobes, 3 power supplies, 50 strobes, 1 speaker. ref 201708175144 maher na | $25,000 |
| [M965827](https://www.permitgraph.org/p/M965827) | Aug 16, 2018 | Never finaled: issued Sep 2018, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space |  |
| [201808096958](https://www.permitgraph.org/p/201808096958) | Aug 9, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | fire sprinkler revision per site permit #2011/1209/0400 s and addendum revison #2018/0510/8813. |  |
| [201807245297](https://www.permitgraph.org/p/201807245297) | Jul 24, 2018 | Completed: final sign-off Jan 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 4th flr - fire sprinkler ti ref 201804166398 maher na | $45,000 |
| [201807245298](https://www.permitgraph.org/p/201807245298) | Jul 24, 2018 | Completed: final sign-off Dec 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 5th flr - fire sprinkler ti ref 201804166404 maher na | $45,000 |
| [201806262985](https://www.permitgraph.org/p/201806262985) | Jun 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | 10th flr ti - partital floor suite, medical bld maher na | $466,000 |
| [201806262993](https://www.permitgraph.org/p/201806262993) | Jun 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | 10h flr ti - partital floor suite, medical bld maher na suite 1005 | $295,000 |
| [201806262990](https://www.permitgraph.org/p/201806262990) | Jun 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | 9h flr ti - partital floor suite, medical bld maher na sprinklers and f/a under sep permit | $100,000 |
| [201806131742](https://www.permitgraph.org/p/201806131742) | Jun 13, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | evac maps, installaion of evacuation maps for all floors. 58 maps total. maher na | $18,400 |
| [201805179347](https://www.permitgraph.org/p/201805179347) | May 17, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages |  |
| [201805108813](https://www.permitgraph.org/p/201805108813) | May 10, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | revision to 201112090400 s3 work includes removal of warm core toilets, addition of fsae vestibule (lobby) revise fsae narrative. all floors. maher not req |  |
| [201804247151](https://www.permitgraph.org/p/201804247151) | Apr 24, 2018 | Completed: final sign-off Dec 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install (2) illuminated double-faced projecting signs. maher na | $9,590 |
| [201804176546](https://www.permitgraph.org/p/201804176546) | Apr 17, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 6th fl - meps and structural for project pa 2017-0927-9722 | $4,000,000 |
| [201804166404](https://www.permitgraph.org/p/201804166404) | Apr 16, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 5th floor, meps and structural for project pa# 201709279716. maher na | $4,000,000 |
| [201804166398](https://www.permitgraph.org/p/201804166398) | Apr 16, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 4th floor mep's and structural for project pa# 201708175144. n/a for maher | $4,000,000 |
| [M911327](https://www.permitgraph.org/p/M911327) | Apr 11, 2018 | Never finaled: issued Apr 2018, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space permit |  |
| [201804105909](https://www.permitgraph.org/p/201804105909) | Apr 10, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 1st floor: meps and structural for ti 20171013164. | $254,744 |
| [201803123379](https://www.permitgraph.org/p/201803123379) | Mar 12, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 7th fl - mechanical, electrical & plumbing & structural for pa 2017-1013-1168. maher na | $3,000,000 |
| [201802272277](https://www.permitgraph.org/p/201802272277) | Feb 27, 2018 | Completed: final sign-off Feb 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm for tunnel btwn 110 van ness to 1101 van ness including: 4 speaker/strobes, 4 smk det, 2 input/output modules ref 201712212059 maher na | $6,000 |
| [201801128513](https://www.permitgraph.org/p/201801128513) | Jan 12, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | install new (1) branch line & 11 speaker heads. new pipe to be supplied from medical office bldg (e) 3" main located 1'-0" inside the tunnel entry. n/a for maher. | $7,000 |
| [201712217059](https://www.permitgraph.org/p/201712217059) | Dec 21, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Herreroboldt Partners](https://www.permitgraph.org/contractor/herreroboldt-partners-911730) | tenant improvement of tunnel between 1100 vaness to 1101 van ness; n/a maher | $600,000 |
| [201710201778](https://www.permitgraph.org/p/201710201778) | Oct 20, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | (2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit) | $7,285,102 |
| [201710131164](https://www.permitgraph.org/p/201710131164) | Oct 13, 2017 | Never finaled: issued Feb 2018, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 1st floor: t.i medical office building (clinic outpatient)first time build out. meps, life safety and sprinkler submitted separately | $237,337 |
| [201710131168](https://www.permitgraph.org/p/201710131168) | Oct 13, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 7th floor: full floor medical office building (clinical outpatient) t.i. 1st time build out, single floor. mep, lifesafety and sprinklers under separate permits. | $4,954,864 |
| [201709279722](https://www.permitgraph.org/p/201709279722) | Sep 27, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | (6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a. | $4,393,775 |
| [201709279716](https://www.permitgraph.org/p/201709279716) | Sep 27, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | (5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit) | $4,641,551 |
| [201708255962](https://www.permitgraph.org/p/201708255962) | Aug 25, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | interior ti for e space, new work consist of interior partitons, millwork, elec work, emch, plumbing, flooring modifications | $117,000 |
| [201708175144](https://www.permitgraph.org/p/201708175144) | Aug 17, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) | 4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13 | $4,854,717 |
| [M811147](https://www.permitgraph.org/p/M811147) | Jul 19, 2017 | Never finaled: issued Jul 2017, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space/mta meters |  |
| [M808127](https://www.permitgraph.org/p/M808127) | Jul 12, 2017 | Never finaled: filed Jul 2017, never issued | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space |  |
| [201704285197](https://www.permitgraph.org/p/201704285197) | Apr 28, 2017 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | revision to 201112090400 se for elevator access hatch, fire service access elevator narrative fire fighter smoke control panel and two-way ecs call boxes locations. n/a maher |  |
| [M744869](https://www.permitgraph.org/p/M744869) | Dec 8, 2016 | Never finaled: issued Jan 2017, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space |  |
| [201608024011](https://www.permitgraph.org/p/201608024011) | Aug 2, 2016 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | tower crane foundation and erection for servicing project site permit #2011-1209-0400. n/a ordinance #155-13 |  |
| [M688088](https://www.permitgraph.org/p/M688088) | May 5, 2016 | Never finaled: issued May 2016, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space w/mta |  |
| [201509288258](https://www.permitgraph.org/p/201509288258) | Sep 28, 2015 | Completed: final sign-off Nov 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | installation of temp trestle for a crane. shoring and excavation under 201507101184 and site permit for mod under 201112090400s | $20,000 |
| [M615387](https://www.permitgraph.org/p/M615387) | Aug 18, 2015 | Never finaled: issued Aug 2015, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | street space and mta permits (bldg permit ap # 201112090400) |  |
| [201507101184](https://www.permitgraph.org/p/201507101184) | Jul 10, 2015 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | excavation and shoring | $3,337,090 |
| [201204208810](https://www.permitgraph.org/p/201204208810) | Apr 20, 2012 | Completed: final sign-off Jul 2016 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | to demolish 2 story retail building. | $15,000 |
| [201112090400](https://www.permitgraph.org/p/201112090400) | Dec 9, 2011 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | to erect new 10 stories, 5.5 basement, medical office, retail & parking building per 2010 building code. see construction plan for addendum schedule- | $126,500,000 |
| [200811257318](https://www.permitgraph.org/p/200811257318) | Nov 25, 2008 | Never finaled: issued Nov 2008, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | [Universal Fire Equipment Co](https://www.permitgraph.org/contractor/universal-fire-equipment-co-963648) | install fire suppression system to protect, hood, duct, plenum, and cooking equipments under the hood. | $2,500 |
| [M32007](https://www.permitgraph.org/p/M32007) | Apr 12, 2005 | Never finaled: issued Apr 2005, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | streetspace |  |
| [200101180143](https://www.permitgraph.org/p/200101180143) | Jan 18, 2001 | Expired or cancelled: expired Jun 2001 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) |  | comply with nov 9901924 for dad install handrails and signage (isa) & directional | $400 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Rudolph And Sletten Inc](https://www.permitgraph.org/contractor/rudolph-and-sletten-inc-198069) (23), [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) (15), [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) (12), [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) (6), [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) (3), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (2), [Herreroboldt Partners](https://www.permitgraph.org/contractor/herreroboldt-partners-911730), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241), [T C B Builders Inc](https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761), [The Boldt Company](https://www.permitgraph.org/contractor/the-boldt-company-624683), [Universal Fire Equipment Co](https://www.permitgraph.org/contractor/universal-fire-equipment-co-963648), [Weckworth Electric Group Inc](https://www.permitgraph.org/contractor/weckworth-electric-group-inc-975919)
- Architects: [Melissa Pesci](https://www.permitgraph.org/professional/melissa-pesci-C32725) (13), [Curtis Chong](https://www.permitgraph.org/professional/curtis-chong-C20140) (2), [Madelyn Mcclellan](https://www.permitgraph.org/professional/madelyn-mcclellan-C37097) (2), [Amir Kazemirejad](https://www.permitgraph.org/professional/amir-kazemirejad-C48085), [Jessica Peitz](https://www.permitgraph.org/professional/jessica-peitz-C35586), [Jon Alan Inman](https://www.permitgraph.org/professional/jon-alan-inman-31122), [Niccolo Valerio](https://www.permitgraph.org/professional/niccolo-valerio-C24228), [Randall Dowler](https://www.permitgraph.org/professional/randall-dowler-C23107)
- Engineers: [Jon Alan Inman](https://www.permitgraph.org/professional/jon-alan-inman-31122) (4), [Jesse Avery](https://www.permitgraph.org/professional/jesse-avery-E18956) (2), [Marcus Oden](https://www.permitgraph.org/professional/marcus-oden-C60586) (2), [Alan Robinson](https://www.permitgraph.org/professional/alan-robinson-S3971), [Allan Giesbrecht](https://www.permitgraph.org/professional/allan-giesbrecht-M21307), [Curtis Chong](https://www.permitgraph.org/professional/curtis-chong-C20140), [Jay D Rohkohl](https://www.permitgraph.org/professional/jay-d-rohkohl-19292), [Jeffrey Alan Crosier](https://www.permitgraph.org/professional/jeffrey-alan-crosier-S3525), [Jeffrey Sacks](https://www.permitgraph.org/professional/jeffrey-sacks-M27537), [Maryann T. Phipps](https://www.permitgraph.org/professional/maryann-t-phipps-2995), [Mohammad Dehghan](https://www.permitgraph.org/professional/mohammad-dehghan-E12752), [Sarah Kushera](https://www.permitgraph.org/professional/sarah-kushera-17599), [Srdjan Rebraca](https://www.permitgraph.org/professional/srdjan-rebraca-M28498), [Tomislav Gajic](https://www.permitgraph.org/professional/tomislav-gajic-E15130), [Warren R. Pottebaum](https://www.permitgraph.org/professional/warren-r-pottebaum-4791)
- Designers: [Jon Alan Inman](https://www.permitgraph.org/professional/jon-alan-inman-31122)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0694/010.