# 1217 Sutter St

Block 0691, lot 012A. Page: https://www.permitgraph.org/a/0691/012A

- City's use: Commercial Retail
- Built: 1906
- Stories: 2
- Rooms: 2 bathrooms
- Building: 4,270 sq ft
- Lot: 3,600 sq ft
- Zoning: RC4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

17 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202410314164](https://www.permitgraph.org/p/202410314164) | Oct 31, 2024 | Completed: final sign-off Nov 2024 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | to comply with amnesty awning program to legalize awning to abate nov 202297437 for sign b |  |
| [202410314162](https://www.permitgraph.org/p/202410314162) | Oct 31, 2024 | Completed: final sign-off Nov 2024 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | name placard on sign "1217 lounge" facing front of street non illuminated double sided for sign a. | $2,000 |
| [202405142128](https://www.permitgraph.org/p/202405142128) | May 14, 2024 | In progress: filed May 2024, not yet issued | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | nov 202419423- change of use from restaurant to restaurant with night entertainment and bar. no change in layout. no change in number of occupants as prev. approved under pa#2015-0915-6982. |  |
| [201809211046](https://www.permitgraph.org/p/201809211046) | Sep 21, 2018 | Completed: final sign-off Jun 2020 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Landmark Construction Inc.](https://www.permitgraph.org/contractor/landmark-construction-inc-907832) | shoring & underpinning for new construction @ 1145 polk street. (ref pa# 2015/11/20/3273-s) | $50,000 |
| [201805179431](https://www.permitgraph.org/p/201805179431) | May 17, 2018 | Expired or cancelled: cancelled Jan 2026 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | documentation of bar equipment for fire. | $1,000 |
| [201612235861](https://www.permitgraph.org/p/201612235861) | Dec 23, 2016 | Completed: final sign-off Dec 2016 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Peninsula Fire Protection Inc](https://www.permitgraph.org/contractor/peninsula-fire-protection-inc-839602) | ungrade fire suppression system for an extg 10' hood and duct. ref app#201509156982 | $4,500 |
| [201612215524](https://www.permitgraph.org/p/201612215524) | Dec 21, 2016 | Completed: final sign-off Dec 2016 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Michael Mccarthy Elec/ Dba:Dmacs Electr](https://www.permitgraph.org/contractor/michael-mccarthy-elec-dba-dmacs-electr-740455) | install new sprinkler monitoring fire alarm with manual pull, smoke detector, outside bell & fire alarm panel with dialer with connection to waterflow switch, temper switch, ansul system and duct det… | $7,000 |
| [201609066890](https://www.permitgraph.org/p/201609066890) | Sep 6, 2016 | Completed: final sign-off Dec 2016 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Magnum Construction Group Inc](https://www.permitgraph.org/contractor/magnum-construction-group-inc-901895) | install new fire sprinkler system per nfpa 13 througout the bldg included 4" undergorund fire srevice. total 76 heads. | $38,000 |
| [201608195498](https://www.permitgraph.org/p/201608195498) | Aug 19, 2016 | Completed: final sign-off Feb 2017 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Cullinane Plastering](https://www.permitgraph.org/contractor/cullinane-plastering-572303) | t24 ligthing compliance for pa 2015-0915-6982 | $1,000 |
| [201606270958](https://www.permitgraph.org/p/201606270958) | Jun 27, 2016 | Completed: final sign-off Oct 2016 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Cullinane Plastering](https://www.permitgraph.org/contractor/cullinane-plastering-572303) | install 3 new g/e rooftop package units. install 1 ef for restroom. including main duct runs and air outlets. kitchen ventilation equip vy others ref pa 2015-0915-6982. fire alarm deferred. | $20,000 |
| [201509156982](https://www.permitgraph.org/p/201509156982) | Sep 15, 2015 | Completed: final sign-off Feb 2017 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Cullinane Plastering](https://www.permitgraph.org/contractor/cullinane-plastering-572303) | remodel (e) bar/restaurant. change door location. remove one (e) bar, remodel one (e) bar; (n) multiple restroom, (n) mezzanine. | $100,000 |
| [M557087](https://www.permitgraph.org/p/M557087) | Feb 4, 2015 | Never finaled: issued Feb 2015, no final | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | street space |  |
| [201501307077](https://www.permitgraph.org/p/201501307077) | Jan 30, 2015 | Completed: final sign-off Feb 2017 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Cullinane Plastering](https://www.permitgraph.org/contractor/cullinane-plastering-572303) | demo non-structural partition @ restrooms and staff office, demo bar @ eastern property, demo per ab-17 | $10,000 |
| [201311192300](https://www.permitgraph.org/p/201311192300) | Nov 19, 2013 | Completed: final sign-off Feb 2014 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Speedy Construction ****See Note](https://www.permitgraph.org/contractor/speedy-construction-see-note-727954) | to comply with nov# 201284173, remove walk in cooler freezer compartment at basement level, install new walk in cooler in kitchen area, new wall in freezer in trash holding area. no occupant load cha… | $7,000 |
| [201003017354](https://www.permitgraph.org/p/201003017354) | Mar 1, 2010 | Completed: final sign-off Mar 2010 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) | [Speedy Construction/See Note:](https://www.permitgraph.org/contractor/speedy-construction-see-note-783415) | to comply with nov#200928579. legalize work performed without permit, suhi bar relocation from rear to front of restaurant. | $15,000 |
| [M91186](https://www.permitgraph.org/p/M91186) | Oct 16, 2007 | Never finaled: issued Oct 2007, no final | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | street space & sidewalk repair |  |
| [200603146617](https://www.permitgraph.org/p/200603146617) | Mar 14, 2006 | Completed: final sign-off Apr 2006 | [1217 Sutter St](https://www.permitgraph.org/a/0691/012A) |  | proposed legalized existing sushi bar station at existing restaurant. establish occupant load 10s,a3 | $8,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Cullinane Plastering](https://www.permitgraph.org/contractor/cullinane-plastering-572303) (4), [Landmark Construction Inc.](https://www.permitgraph.org/contractor/landmark-construction-inc-907832), [Magnum Construction Group Inc](https://www.permitgraph.org/contractor/magnum-construction-group-inc-901895), [Michael Mccarthy Elec/ Dba:Dmacs Electr](https://www.permitgraph.org/contractor/michael-mccarthy-elec-dba-dmacs-electr-740455), [Peninsula Fire Protection Inc](https://www.permitgraph.org/contractor/peninsula-fire-protection-inc-839602), [Speedy Construction ****See Note](https://www.permitgraph.org/contractor/speedy-construction-see-note-727954), [Speedy Construction/See Note:](https://www.permitgraph.org/contractor/speedy-construction-see-note-783415)
- Engineers: [David Kane](https://www.permitgraph.org/professional/david-kane-S5278), [Derek Wavering](https://www.permitgraph.org/professional/derek-wavering-S6239), [Yindy Hei Yin Felkins](https://www.permitgraph.org/professional/yindy-hei-yin-felkins-M33896)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0691/012A.
