# 2095 California St

Block 0650, lot 024. Page: https://www.permitgraph.org/a/0650/024

- City's use: Multi-Family Residential
- Built: 1975
- Stories: 4
- Units: 47
- Rooms: 47 bathrooms
- Building: 40,595 sq ft
- Lot: 13,939 sq ft
- Zoning: RH2RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

7 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202601123675](https://www.permitgraph.org/p/202601123675) | Jan 12, 2026 | Completed: final sign-off Feb 2026 | [2095 California St](https://www.permitgraph.org/a/0650/024) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | install relay modules for elevator function. 4 relays 1 montiotor module, install 3 new smoke detectors and 1 new heat detector. | $5,880 |
| [202209122272](https://www.permitgraph.org/p/202209122272) | Sep 12, 2022 | Completed: final sign-off Apr 2023 | [2095 California St](https://www.permitgraph.org/a/0650/024) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | install new fire alarm to meet 1103.7.6.1 code install new facu, new power supplies, new pull station, new smoke detectors and install new low freq sanders in units | $57,501 |
| [201606159993](https://www.permitgraph.org/p/201606159993) | Jun 15, 2016 | Never finaled: issued Jun 2016, no final | [2095 California St](https://www.permitgraph.org/a/0650/024) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | to renew expired permit #2013-12-16-4216. all work completed. |  |
| [201312164216](https://www.permitgraph.org/p/201312164216) | Dec 16, 2013 | Completed: final sign-off Jun 2016 | [2095 California St](https://www.permitgraph.org/a/0650/024) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | replace fire alarm system on 1 for 1 basis, 1 new addressable facp 20 manual pull stations 1 new smoke detector at facp connect flow switch connect existing bells | $7,500 |
| [201106087646](https://www.permitgraph.org/p/201106087646) | Jun 8, 2011 | Never finaled: issued Jun 2011, no final | [2095 California St](https://www.permitgraph.org/a/0650/024) | [Michael Fellman Siding & Roofing](https://www.permitgraph.org/contractor/michael-fellman-siding-roofing-520620) | reroofing | $35,600 |
| [201103152099](https://www.permitgraph.org/p/201103152099) | Mar 15, 2011 | Completed: final sign-off Sep 2011 | [2095 California St](https://www.permitgraph.org/a/0650/024) | [M. Gaehwiler Construction Inc](https://www.permitgraph.org/contractor/m-gaehwiler-construction-inc-510649) | replace existing single pane windows with double pane, same color, and window type, replace existing wood shingles and stucco with hardy shingles, repair dry rot as needed, all bedrms must meet rescu… | $150,000 |
| [M35727](https://www.permitgraph.org/p/M35727) | Dec 19, 2005 | Never finaled: issued Dec 2005, no final | [2095 California St](https://www.permitgraph.org/a/0650/024) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) (4), [M. Gaehwiler Construction Inc](https://www.permitgraph.org/contractor/m-gaehwiler-construction-inc-510649), [Michael Fellman Siding & Roofing](https://www.permitgraph.org/contractor/michael-fellman-siding-roofing-520620)
- Designers: [Thomas Berrill](https://www.permitgraph.org/professional/thomas-berrill-670906)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0650/024.
