# 1507 California St

Block 0645, lot 001. Page: https://www.permitgraph.org/a/0645/001

- City's use: Commercial Hotel
- Built: 1907
- Stories: 4
- Units: 39
- Rooms: 42 bathrooms
- Building: 9,800 sq ft
- Lot: 2,696 sq ft
- Zoning: POLK
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

31 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202211166664](https://www.permitgraph.org/p/202211166664) | Nov 16, 2022 | Never finaled: issued Nov 2022, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) |  | revision to 202206176580. correction to permit plan delete parapet wall from plans, not built and not req. no construction under this permit |  |
| [202206176580](https://www.permitgraph.org/p/202206176580) | Jun 17, 2022 | Never finaled: issued Jun 2022, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Chiang C M Construction Inc.](https://www.permitgraph.org/contractor/chiang-c-m-construction-inc-520064) | revision to pa# 202108096080 structural plan sheeet 1 was incorrect, replacing sheet 1 with revised structural plan |  |
| [202203149895](https://www.permitgraph.org/p/202203149895) | Mar 14, 2022 | Completed: final sign-off Oct 2022 | [1501 California St](https://www.permitgraph.org/a/0645/001) | [Certified Fire And Safety](https://www.permitgraph.org/contractor/certified-fire-and-safety-1015627) | as built ul300 ansul fire system to protect kitchen hood and cooking equipment and airmaid bleed air pollution control unit. ref pa# 202106243149 & 201810011907. | $1,500 |
| [202112084031](https://www.permitgraph.org/p/202112084031) | Dec 8, 2021 | Completed: final sign-off Jan 2022 | [1501 California St](https://www.permitgraph.org/a/0645/001) | [Aura Fire Safety Inc](https://www.permitgraph.org/contractor/aura-fire-safety-inc-966824) | modify extg fire sprinkler system per t.i. relocation/replace 3 fire sprinkler and add 1 sprinkler. ref #201810011907 | $5,800 |
| [202108096080](https://www.permitgraph.org/p/202108096080) | Aug 9, 2021 | Completed: final sign-off Oct 2022 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Chiang C M Construction Inc.](https://www.permitgraph.org/contractor/chiang-c-m-construction-inc-520064) | revision to 201504234504. install remedial measures per vrap(dph). install new in-line fan & air filter system @ roof top. connecting (e) vertical pipe termination @ roof. to comply w/ dph letter. in… | $5,000 |
| [202106243149](https://www.permitgraph.org/p/202106243149) | Jun 24, 2021 | Completed: final sign-off Sep 2022 | [1501 California St](https://www.permitgraph.org/a/0645/001) | [Certified Fire And Safety](https://www.permitgraph.org/contractor/certified-fire-and-safety-1015627) | install ul300 ansul fire system to protect kitchen hood and cooking equipment. reference permit # 2018-1001-1907 | $3,500 |
| [M1210047](https://www.permitgraph.org/p/M1210047) | Jun 11, 2020 | Never finaled: issued Jun 2020, no final | [1501 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [M1171227](https://www.permitgraph.org/p/M1171227) | Nov 27, 2019 | Never finaled: issued Nov 2019, no final | [1501 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [201810011907](https://www.permitgraph.org/p/201810011907) | Oct 1, 2018 | Completed: final sign-off Oct 2022 | [1501 California St](https://www.permitgraph.org/a/0645/001) | [Phase 2 Builders](https://www.permitgraph.org/contractor/phase-2-builders-927887) | ground floor t.i. for restaurant (b-0c.) incl. mech, elect, plbg, and finishes, exhaust hood under sep permit. extg storefront and ext hc. restroom to remain. | $132,000 |
| [M845487](https://www.permitgraph.org/p/M845487) | Oct 17, 2017 | Never finaled: issued Oct 2017, no final | [1515 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [201706088755](https://www.permitgraph.org/p/201706088755) | Jun 8, 2017 | Completed: final sign-off Jul 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | revision to 201605096871 change detail of transmission of signals from facu to central station |  |
| [201705035626](https://www.permitgraph.org/p/201705035626) | May 3, 2017 | Completed: final sign-off Dec 2017 | [1515 California St](https://www.permitgraph.org/a/0645/001) | [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616) | 1/f: tenant improvement for new commercial shop fitout optometery office. | $30,000 |
| [201612215568](https://www.permitgraph.org/p/201612215568) | Dec 21, 2016 | Completed: final sign-off Aug 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | add gas meter room in basement per pg&e requirements (construction phase change to work underway per pa 2014-0710-0977) | $5,000 |
| [M735229](https://www.permitgraph.org/p/M735229) | Nov 1, 2016 | Never finaled: issued Nov 2016, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [M716330](https://www.permitgraph.org/p/M716330) | Aug 24, 2016 | Never finaled: issued Aug 2016, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | street space |  |
| [201605096871](https://www.permitgraph.org/p/201605096871) | May 9, 2016 | Never finaled: issued Aug 2016, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | new fire alarm system with fire sprinkler monitoring and notification through out. ref app#201407100977. also ref pa#201601046315 | $29,000 |
| [M685247](https://www.permitgraph.org/p/M685247) | Apr 28, 2016 | Never finaled: issued Apr 2016, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [M652647](https://www.permitgraph.org/p/M652647) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) |  | street space permit , renewal of permti #201407070554 |  |
| [201601046315](https://www.permitgraph.org/p/201601046315) | Jan 4, 2016 | Completed: final sign-off Aug 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construction phase changes to work approved under 201308164598 and 201407100977. replace all (e) windows with wood double hung windows, install new platform and new roof hatch at roof 4. remove porti… | $20,000 |
| [201511062030](https://www.permitgraph.org/p/201511062030) | Nov 6, 2015 | Completed: final sign-off Jun 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | install 179 sprinkler heads throughout entire building per nfpa 13. ref pa 2014-0710-0977 | $25,000 |
| [M623327](https://www.permitgraph.org/p/M623327) | Sep 18, 2015 | Never finaled: issued Sep 2015, no final | [1501 California St](https://www.permitgraph.org/a/0645/001) |  | street space permit - renewal of permit # m594087 |  |
| [M594087](https://www.permitgraph.org/p/M594087) | Jun 9, 2015 | Never finaled: issued Jun 2015, no final | [1501 California St](https://www.permitgraph.org/a/0645/001) |  | street space |  |
| [201504234504](https://www.permitgraph.org/p/201504234504) | Apr 23, 2015 | Never finaled: issued Jul 2015, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | revision to pa 2014 0710 0977: install remedial measures per vrap program (public health) | $15,000 |
| [201410158940](https://www.permitgraph.org/p/201410158940) | Oct 15, 2014 | Completed: final sign-off Aug 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construction phase changes to work underway per pa 201407070554, revise footing detail for soft story reinforcement. ref complaint #201487344; replace floor joists bet grids 2&4 @ 1st flr plan, (n) w… | $4,000 |
| [201410158937](https://www.permitgraph.org/p/201410158937) | Oct 15, 2014 | Completed: final sign-off Sep 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construction phase change to work underway per pa 201407100977, revise footing detail | $1,500 |
| [201407100977](https://www.permitgraph.org/p/201407100977) | Jul 10, 2014 | Completed: final sign-off Sep 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construction phase changes under app#201308164598. convert part of ground flr commercial space b to lounge for exclusive use of sro residents. upgrade disabled access to all ground flr. commercial sp… | $400,000 |
| [201407070554](https://www.permitgraph.org/p/201407070554) | Jul 7, 2014 | Completed: final sign-off Aug 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | soft story reinforcement, correct out of level condition, interior work @ lower level. comply with sfbc chapter 34b, 2012 iebc appendix a-4. | $85,000 |
| [201405024827](https://www.permitgraph.org/p/201405024827) | May 2, 2014 | Never finaled: issued May 2014, no final | [1507 California St](https://www.permitgraph.org/a/0645/001) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | construct phase changes to pa#201308164598, non-structural demolition to prepare ground floor and basement spaces for future tenants. | $1,000 |
| [201308164598](https://www.permitgraph.org/p/201308164598) | Aug 16, 2013 | Completed: final sign-off Sep 2017 | [1507 California St](https://www.permitgraph.org/a/0645/001) |  | add bathrooms in rooms (32 rooms, all floors), fixtures to be non-combustible sprinklers not reqd-nfpa 138.15.8.1.3. | $120,000 |
| [200907202983](https://www.permitgraph.org/p/200907202983) | Jul 20, 2009 | Never finaled: issued Jul 2009, no final | [1501 California St](https://www.permitgraph.org/a/0645/001) | [H F Curley Construction](https://www.permitgraph.org/contractor/h-f-curley-construction-833818) | replace rotted 2x12 floor joists on 1st floor 8pcs. new 3/4" plywood subfloor. nov 200882398. | $6,000 |
| [200003033444](https://www.permitgraph.org/p/200003033444) | Mar 3, 2000 | Expired or cancelled: expired Sep 2000 | [1501 California St](https://www.permitgraph.org/a/0645/001) | [Liberty Roofing Co](https://www.permitgraph.org/contractor/liberty-roofing-co-554896) | reroofing |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) (9), [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) (2), [Certified Fire And Safety](https://www.permitgraph.org/contractor/certified-fire-and-safety-1015627) (2), [Chiang C M Construction Inc.](https://www.permitgraph.org/contractor/chiang-c-m-construction-inc-520064) (2), [Aura Fire Safety Inc](https://www.permitgraph.org/contractor/aura-fire-safety-inc-966824), [Cal C A D E Construction Inc](https://www.permitgraph.org/contractor/cal-c-a-d-e-construction-inc-937616), [H F Curley Construction](https://www.permitgraph.org/contractor/h-f-curley-construction-833818), [Liberty Roofing Co](https://www.permitgraph.org/contractor/liberty-roofing-co-554896), [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866), [Phase 2 Builders](https://www.permitgraph.org/contractor/phase-2-builders-927887)
- Architects: [Harvey J Hacker](https://www.permitgraph.org/professional/harvey-j-hacker-C8520) (7), [Claudio Martonffy](https://www.permitgraph.org/professional/claudio-martonffy-34835), [Curtis Chong](https://www.permitgraph.org/professional/curtis-chong-C20140), [Tai Peter Lam](https://www.permitgraph.org/professional/tai-peter-lam-C8122)
- Engineers: [Albert Urrutia](https://www.permitgraph.org/professional/albert-urrutia-S2994) (2), [Glenn Tofani](https://www.permitgraph.org/professional/glenn-tofani-GE2496), [Santos & Urrutia](https://www.permitgraph.org/professional/santos-urrutia-S2984)
- Designers: [Peter M. Utzig](https://www.permitgraph.org/professional/peter-m-utzig-1015627)

---