# 2015 Sacramento St

Block 0640, lot 016. Page: https://www.permitgraph.org/a/0640/016

- City's use: Multi-Family Residential
- Built: 1900
- Stories: 3
- Units: 11
- Rooms: 11 bedrooms, 11 bathrooms
- Building: 6,090 sq ft
- Lot: 3,438 sq ft
- Zoning: RM2
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

9 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609298765](https://www.permitgraph.org/p/202609298765) | Sep 29, 2026 | In progress: issued Sep 2026 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Commercial Fire Protection Llc](https://www.permitgraph.org/contractor/commercial-fire-protection-llc-1090996) | revision to pa 202404301094 replace the panel communicator and pull stations and smoke detector from ground level to 2nd level lobby. remove 1 smoke, 1 pull from 2nd floor. remove annunciator from gr… |  |
| [202503313395](https://www.permitgraph.org/p/202503313395) | Mar 31, 2025 | Completed: final sign-off May 2025 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Fog City Roofiing Llc](https://www.permitgraph.org/contractor/fog-city-roofiing-llc-1075380) | reroofing with hot works. | $28,500 |
| [202405071616](https://www.permitgraph.org/p/202405071616) | May 7, 2024 | Completed: final sign-off Oct 2024 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Aligned Technologies Llc Dba Aligned Dev](https://www.permitgraph.org/contractor/aligned-technologies-llc-dba-aligned-dev-1026570) | revision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design. |  |
| [202404301094](https://www.permitgraph.org/p/202404301094) | Apr 30, 2024 | In progress: issued May 2024 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Commercial Fire Protection Llc](https://www.permitgraph.org/contractor/commercial-fire-protection-llc-1090996) | upgrade (e) fire alarm include manual pull stations & smoke detectors. (e) bells replace w/ horn/strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monit… | $39,000 |
| [202208170711](https://www.permitgraph.org/p/202208170711) | Aug 17, 2022 | Completed: final sign-off Oct 2024 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Aligned Technologies Llc Dba Aligned Dev](https://www.permitgraph.org/contractor/aligned-technologies-llc-dba-aligned-dev-1026570) | unit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit. | $60,000 |
| [201701187392](https://www.permitgraph.org/p/201701187392) | Jan 18, 2017 | Completed: final sign-off Jan 2017 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | revision to pa 2016-0429-6170 (soft story). relocate steel moment frame from grid line 2 to grid line 1.5 |  |
| [201604296170](https://www.permitgraph.org/p/201604296170) | Apr 29, 2016 | Completed: final sign-off Jan 2017 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $90,000 |
| [M449147](https://www.permitgraph.org/p/M449147) | Dec 6, 2013 | Never finaled: issued Dec 2013, no final | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) |  | street space |  |
| [M292407](https://www.permitgraph.org/p/M292407) | Dec 12, 2011 | Never finaled: issued Dec 2011, no final | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) |  | streetspace |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Aligned Technologies Llc Dba Aligned Dev](https://www.permitgraph.org/contractor/aligned-technologies-llc-dba-aligned-dev-1026570) (2), [Commercial Fire Protection Llc](https://www.permitgraph.org/contractor/commercial-fire-protection-llc-1090996) (2), [Nabi Construction & Engineering Inc](https://www.permitgraph.org/contractor/nabi-construction-engineering-inc-792807) (2), [Fog City Roofiing Llc](https://www.permitgraph.org/contractor/fog-city-roofiing-llc-1075380)
- Architects: [Serina Calhoun](https://www.permitgraph.org/professional/serina-calhoun-C30744) (2)
- Engineers: [Javed J. Tharavi](https://www.permitgraph.org/professional/javed-j-tharavi-C57676), [Juan Aleman-Hernandez](https://www.permitgraph.org/professional/juan-aleman-hernandez-C86746), [Siavash Sorousian](https://www.permitgraph.org/professional/siavash-sorousian-C94523)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0640/016.