# 2121 Fillmore St

Block 0635, lot 003. Page: https://www.permitgraph.org/a/0635/003

- City's use: Multi-Family Residential
- Built: 1900
- Stories: 3
- Units: 19
- Rooms: 20 bathrooms
- Building: 16,450 sq ft
- Lot: 5,627 sq ft
- Zoning: FILLMR
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

36 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202503273233](https://www.permitgraph.org/p/202503273233) | Mar 27, 2025 | Completed: final sign-off May 2025 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | to comply with nov. #202294232. inspect area where signage was removed. |  |
| [202310198992](https://www.permitgraph.org/p/202310198992) | Oct 19, 2023 | Never finaled: filed Oct 2023, never issued | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | to comply with abe# 201811292664, storefront entrance abe compliance check, barrier removal- addition of power door operators at storefront entrance. | $3,000 |
| [202310198989](https://www.permitgraph.org/p/202310198989) | Oct 19, 2023 | Never finaled: filed Oct 2023, never issued | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | to comply with abe# 201811292657, storefront entrance abe compliance check, barrier removal- modify (e) storefront entrance to provide required door clearances. | $3,000 |
| [202310199065](https://www.permitgraph.org/p/202310199065) | Oct 19, 2023 | Never finaled: filed Oct 2023, never issued | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | to comply abe# 201811292669, storefront abe compliance checklist, provide new ada compliant door hardware. | $750 |
| [202211106285](https://www.permitgraph.org/p/202211106285) | Nov 10, 2022 | Expired or cancelled: withdrawn Apr 2025 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | install a blade sign double faced non-electric "knix" | $800 |
| [201910295810](https://www.permitgraph.org/p/201910295810) | Oct 29, 2019 | Never finaled: issued Oct 2019, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Alsterlind Construction Inc.](https://www.permitgraph.org/contractor/alsterlind-construction-inc-679220) | sign, "goop", exterior, double-faced, non-illuminated | $2,000 |
| [201907186325](https://www.permitgraph.org/p/201907186325) | Jul 18, 2019 | Never finaled: issued Jul 2019, no final | [2127 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Pineda Construction Inc](https://www.permitgraph.org/contractor/pineda-construction-inc-1025258) | apt 11: remodel kitchen & 1 bathroom in-kind. | $8,000 |
| [M1028047](https://www.permitgraph.org/p/M1028047) | Jan 15, 2019 | Never finaled: issued Jan 2019, no final | [2127 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space |  |
| [M1027188](https://www.permitgraph.org/p/M1027188) | Jan 14, 2019 | Never finaled: issued Jan 2019, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space |  |
| [201901110209](https://www.permitgraph.org/p/201901110209) | Jan 11, 2019 | Completed: final sign-off Mar 2019 | [2127 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Pineda Construction Inc](https://www.permitgraph.org/contractor/pineda-construction-inc-1025258) | apt #1 and apt #15 remodel two kitchens and two baths. remove old cabinets in kitchen and install new tile floor and one bathrom tile floor and tub wall and paint. | $8,250 |
| [201805088520](https://www.permitgraph.org/p/201805088520) | May 8, 2018 | Never finaled: issued May 2018, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Alex Builder Inc](https://www.permitgraph.org/contractor/alex-builder-inc-928753) | revision to pa 2018-0319-4003 (soft story). |  |
| [201803194003](https://www.permitgraph.org/p/201803194003) | Mar 19, 2018 | Never finaled: issued Mar 2018, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Alex Builder Inc](https://www.permitgraph.org/contractor/alex-builder-inc-928753) | revision to 201609288984 s0ft story seismic retrofit; bpa # 201609288984 | $5,000 |
| [201710252183](https://www.permitgraph.org/p/201710252183) | Oct 25, 2017 | Never finaled: issued Oct 2017, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | add an ufer ground on the ground floor level. cut and patch drywall. | $500 |
| [M838507](https://www.permitgraph.org/p/M838507) | Oct 3, 2017 | Never finaled: issued Oct 2017, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space with mta |  |
| [M808248](https://www.permitgraph.org/p/M808248) | Jul 12, 2017 | Never finaled: issued Jul 2017, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space w/mta |  |
| [201703070905](https://www.permitgraph.org/p/201703070905) | Mar 7, 2017 | Completed: final sign-off Jun 2018 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Alex Builder Inc](https://www.permitgraph.org/contractor/alex-builder-inc-928753) | add ada door opener on 1st floor per plan at retail area for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $10,000 |
| [M754533](https://www.permitgraph.org/p/M754533) | Jan 17, 2017 | Never finaled: issued Jan 2017, no final | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space permit |  |
| [201609288984](https://www.permitgraph.org/p/201609288984) | Sep 28, 2016 | Completed: final sign-off Jun 2018 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Alex Builder Inc](https://www.permitgraph.org/contractor/alex-builder-inc-928753) | soft story retrofit (residential) per sfbc chapter 34b, 2012 iebc appendix a-4 (commercial pa #201609288980). | $40,000 |
| [201609288980](https://www.permitgraph.org/p/201609288980) | Sep 28, 2016 | Expired or cancelled: withdrawn Jun 2018 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Great Wall Builders Inc](https://www.permitgraph.org/contractor/great-wall-builders-inc-891627) | soft story retrofit (commercial) per sfbc chapter 34b, 2012 iebc appendix a-4 (residential pa #201609288984). | $40,000 |
| [201203065419](https://www.permitgraph.org/p/201203065419) | Mar 6, 2012 | Never finaled: issued Mar 2012, no final | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) | [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624) | minor t.i to (e) full service restaurant, build new wall betweem bar & kitchen. extend (e) bar.no increase in occupant load less than 49- b occupancy | $24,000 |
| [M237226](https://www.permitgraph.org/p/M237226) | Jan 19, 2011 | Never finaled: issued Jan 2011, no final | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space and mta parking |  |
| [M235046](https://www.permitgraph.org/p/M235046) | Jan 3, 2011 | Never finaled: issued Jan 2011, no final | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space & meter parking |  |
| [M230026](https://www.permitgraph.org/p/M230026) | Nov 19, 2010 | Never finaled: issued Nov 2010, no final | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space & mta |  |
| [201010223575](https://www.permitgraph.org/p/201010223575) | Oct 22, 2010 | Completed: final sign-off Feb 2011 | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Everbuilt Construction, Inc.](https://www.permitgraph.org/contractor/everbuilt-construction-inc-601308) | remove & replace existing casework, counters, tile flooring, add ada restroom, install tenant supplied equipment, install ventilation, replace existing lighting, replace storefront. | $80,000 |
| [201010223566](https://www.permitgraph.org/p/201010223566) | Oct 22, 2010 | Completed: final sign-off Nov 2010 | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) | [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912) | installation of ul 300 kitchen fire system into extg hood and duct. | $3,500 |
| [201010142988](https://www.permitgraph.org/p/201010142988) | Oct 14, 2010 | Completed: final sign-off Feb 2011 | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Everbuilt Construction, Inc.](https://www.permitgraph.org/contractor/everbuilt-construction-inc-601308) | removal of existing casework, counters, wall paneling & tile flooring. all work to be performed on street level space (restaurant) per ab-017. | $3,000 |
| [M222906](https://www.permitgraph.org/p/M222906) | Sep 30, 2010 | Never finaled: issued Sep 2010, no final | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space permit |  |
| [201005243105](https://www.permitgraph.org/p/201005243105) | May 24, 2010 | Never finaled: issued Jun 2010, no final | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Custom Homes Of Woodside Inc.](https://www.permitgraph.org/contractor/custom-homes-of-woodside-inc-462690), [Aegis Fire Systems Technology Inc](https://www.permitgraph.org/contractor/aegis-fire-systems-technology-inc-723350) | fire sprinklers added to (n) tenant improvement; 9-total. 6-added uprights, 2-added pendants, 1-added pendant in cooler & 3-plugged pendant. | $2,500 |
| [M202068](https://www.permitgraph.org/p/M202068) | May 13, 2010 | Never finaled: issued May 2010, no final | [2125 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space permit |  |
| [M197206](https://www.permitgraph.org/p/M197206) | Apr 12, 2010 | Never finaled: issued Apr 2010, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space and mta parking |  |
| [201003128160](https://www.permitgraph.org/p/201003128160) | Mar 12, 2010 | Never finaled: issued Mar 2010, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Custom Homes Of Woodside Inc.](https://www.permitgraph.org/contractor/custom-homes-of-woodside-inc-462690) | relocate new dish line, relocate new walkin, add 1 new handicapped remodeled bathroom (currently 2 small bathrooms), install 1 new power assist door opener at front entry (handicapped) add n 2 handsi… | $80,000 |
| [M190107](https://www.permitgraph.org/p/M190107) | Feb 5, 2010 | Never finaled: issued Feb 2010, no final | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | street space |  |
| [200802084395](https://www.permitgraph.org/p/200802084395) | Feb 8, 2008 | Completed: final sign-off Feb 2008 | [2127 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | remove portion of (e) dry rotted post at bottom at rear and construct a new concrete base connect to (e) brick building. reinforce the post base brick footing with new steel channel and add bracing a… | $5,500 |
| [200607126286](https://www.permitgraph.org/p/200607126286) | Jul 12, 2006 | Expired or cancelled: expired Dec 2007 | [2121 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Everbuilt Construction, Inc.](https://www.permitgraph.org/contractor/everbuilt-construction-inc-601308) | remove (e) interior fixtures & changing rooms. replace with new changing rooms. altering existing restroom for ada compliance, replace lighting fixtures, add new basement stairs. | $113,000 |
| [200509213530](https://www.permitgraph.org/p/200509213530) | Sep 21, 2005 | Completed: final sign-off Nov 2005 | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) | [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) | new casework flooring transition ,heat,heat pump/new owner of extg use | $32,500 |
| [200312152296](https://www.permitgraph.org/p/200312152296) | Dec 15, 2003 | Completed: final sign-off Nov 2005 | [2123 Fillmore St](https://www.permitgraph.org/a/0635/003) |  | kitchen&retail remodel modified storefront to conform to disabled access.fire alarm&sprinkler on sep | $50,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Alex Builder Inc](https://www.permitgraph.org/contractor/alex-builder-inc-928753) (4), [Everbuilt Construction, Inc.](https://www.permitgraph.org/contractor/everbuilt-construction-inc-601308) (3), [Custom Homes Of Woodside Inc.](https://www.permitgraph.org/contractor/custom-homes-of-woodside-inc-462690) (2), [Pineda Construction Inc](https://www.permitgraph.org/contractor/pineda-construction-inc-1025258) (2), [Aegis Fire Systems Technology Inc](https://www.permitgraph.org/contractor/aegis-fire-systems-technology-inc-723350), [Alsterlind Construction Inc.](https://www.permitgraph.org/contractor/alsterlind-construction-inc-679220), [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263), [Great Wall Builders Inc](https://www.permitgraph.org/contractor/great-wall-builders-inc-891627), [International Fire Equip](https://www.permitgraph.org/contractor/international-fire-equip-253912), [R 3 Builders Inc.](https://www.permitgraph.org/contractor/r-3-builders-inc-799624)
- Architects: [James Zak](https://www.permitgraph.org/professional/james-zak-C21506) (3), [Chris Williams](https://www.permitgraph.org/professional/chris-williams-C30752), [Elmo Novaresi](https://www.permitgraph.org/professional/elmo-novaresi-C2619), [Winder Lieber Architect](https://www.permitgraph.org/professional/winder-lieber-architect-C29300)
- Engineers: [Jeff Tsz Wai Chow](https://www.permitgraph.org/professional/jeff-tsz-wai-chow-C81252) (2), [Lefler Engineering](https://www.permitgraph.org/professional/lefler-engineering-22208), [Lok C. Kwan](https://www.permitgraph.org/professional/lok-c-kwan-S1836), [Pao Lin Chang](https://www.permitgraph.org/professional/pao-lin-chang-40578)
- Authorized agents: [Steven Hall](https://www.permitgraph.org/professional/steven-hall-C28168)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0635/003.