# 44 Mcallister St

Block 0349, lot 004. Page: https://www.permitgraph.org/a/0349/004

- City's use: Commercial Hotel
- Built: 1923
- Stories: 8
- Units: 217
- Rooms: 14 bathrooms
- Building: 59,684 sq ft
- Lot: 9,474 sq ft
- Zoning: RC4
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

25 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202106102084](https://www.permitgraph.org/p/202106102084) | Jun 10, 2021 | Completed: final sign-off Jul 2021 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [Faragon Restoration Ltd](https://www.permitgraph.org/contractor/faragon-restoration-ltd-1017218) | #217: remove and replace existing sheetrock & replace insulation. non-structural work. no new walls. (insulation, sheetrock, framing "like for like") | $31,895 |
| [201912058757](https://www.permitgraph.org/p/201912058757) | Dec 5, 2019 | Completed: final sign-off Jul 2020 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install new power supply panel and new door hodler on lower level & groudn floor for new doors, new devices will be tie-in to (e) control panel on ground fl. ref pa 2009-0702-1899 | $2,000 |
| [M1086188](https://www.permitgraph.org/p/M1086188) | May 28, 2019 | Never finaled: issued May 2019, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | street space |  |
| [201809140228](https://www.permitgraph.org/p/201809140228) | Sep 14, 2018 | Never finaled: issued Oct 2018, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [Evolution Energy Solutions Llc](https://www.permitgraph.org/contractor/evolution-energy-solutions-llc-995016) | installation of new solar system. | $20,000 |
| [201711204327](https://www.permitgraph.org/p/201711204327) | Nov 20, 2017 | Never finaled: issued Nov 2017, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [International Waterproofing](https://www.permitgraph.org/contractor/international-waterproofing-739431) | re-roofing | $26,000 |
| [201103152097](https://www.permitgraph.org/p/201103152097) | Mar 15, 2011 | Completed: final sign-off Mar 2011 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to pa# 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10,220,320,520,620,720,820. to units 212,312,412,512,612,712,812. revisions to plan lay out… | $5,000 |
| [201011305799](https://www.permitgraph.org/p/201011305799) | Nov 30, 2010 | Never finaled: issued Nov 2010, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | to obtain final inspection for work approved under pa #200607196961, all work is complet. |  |
| [201011235544](https://www.permitgraph.org/p/201011235544) | Nov 23, 2010 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | install 2 security gates at existing exterior exit paths, within existing property line. | $10,000 |
| [201009030256](https://www.permitgraph.org/p/201009030256) | Sep 3, 2010 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to pa #2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid. | $125,000 |
| [M218488](https://www.permitgraph.org/p/M218488) | Aug 30, 2010 | Never finaled: issued Aug 2010, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | street space |  |
| [201006104281](https://www.permitgraph.org/p/201006104281) | Jun 10, 2010 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | install ten (60) evacuation signs for sffd review of new construction ( not completed yet) | $3,000 |
| [M201507](https://www.permitgraph.org/p/M201507) | May 11, 2010 | Never finaled: issued May 2010, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | street space permit |  |
| [201003097869](https://www.permitgraph.org/p/201003097869) | Mar 9, 2010 | Completed: final sign-off Sep 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to permit 2007/0124/2425-s3. revise ducted air supply to plenum air supply at grid 4-e, floor 3-8.. |  |
| [201001194885](https://www.permitgraph.org/p/201001194885) | Jan 19, 2010 | Completed: final sign-off Jan 2011 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | provide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2. | $500 |
| [201001194882](https://www.permitgraph.org/p/201001194882) | Jan 19, 2010 | Completed: final sign-off Oct 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | add partitin wall/mech. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2. | $500 |
| [M184081](https://www.permitgraph.org/p/M184081) | Nov 12, 2009 | Never finaled: issued Nov 2009, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | street space |  |
| [200907213130](https://www.permitgraph.org/p/200907213130) | Jul 21, 2009 | Completed: final sign-off Oct 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to pa# 2007.01.24.2425 showing (e) step to remain at (e) fire escape to remain |  |
| [200907021899](https://www.permitgraph.org/p/200907021899) | Jul 2, 2009 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369) | provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. cor… | $195,000 |
| [M163766](https://www.permitgraph.org/p/M163766) | May 12, 2009 | Never finaled: issued May 2009, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | street space |  |
| [200903204550](https://www.permitgraph.org/p/200903204550) | Mar 20, 2009 | Completed: final sign-off Sep 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to 200701242425 addenda 2: only revision to 20 gauge partition wall studs to 25 gauge partition wall studs at 16" oc, 25 gauge to be 250d525, max 12'1 height. no structural |  |
| [200812047793](https://www.permitgraph.org/p/200812047793) | Dec 4, 2008 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | revision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing. | $80,000 |
| [200811136456](https://www.permitgraph.org/p/200811136456) | Nov 13, 2008 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [Tony Ng Plumbing Co](https://www.permitgraph.org/contractor/tony-ng-plumbing-co-329705) | revise existing fire sprinkler system and replace all sprinkler heads with fast response in public areas and residential heads inside units. total 956 heads | $215,000 |
| [200701242425](https://www.permitgraph.org/p/200701242425) | Jan 24, 2007 | Completed: final sign-off Dec 2010 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) | [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) | renovation of (e) building, maintain the same number of units; relocate some (e) partition walls; installation of (n) horizontal addition elevator tower; renovation of common bathrooms, shoklers & to… |  |
| [200607196961](https://www.permitgraph.org/p/200607196961) | Jul 19, 2006 | Expired or cancelled: expired Mar 2007 | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | permit is to correct city records to show (e) 211 group housing rooms plus 1 manager apt.no construction work with this permit. |  |
| [M27699](https://www.permitgraph.org/p/M27699) | Jun 1, 2004 | Never finaled: issued Jun 2004, no final | [44 Mcallister St](https://www.permitgraph.org/a/0349/004) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [D.F.P.F Corp Dba Fine Line Construction](https://www.permitgraph.org/contractor/d-f-p-f-corp-dba-fine-line-construction-451707) (11), [Evolution Energy Solutions Llc](https://www.permitgraph.org/contractor/evolution-energy-solutions-llc-995016), [Faragon Restoration Ltd](https://www.permitgraph.org/contractor/faragon-restoration-ltd-1017218), [International Waterproofing](https://www.permitgraph.org/contractor/international-waterproofing-739431), [Intrepid Electronic Systems Inc](https://www.permitgraph.org/contractor/intrepid-electronic-systems-inc-739369), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216), [Tony Ng Plumbing Co](https://www.permitgraph.org/contractor/tony-ng-plumbing-co-329705)
- Architects: [James D. Fagler](https://www.permitgraph.org/professional/james-d-fagler-C19403) (7), [Lisa Gelfand](https://www.permitgraph.org/professional/lisa-gelfand-C17265)
- Authorized agents: [Jim Fagler](https://www.permitgraph.org/professional/jim-fagler-C19403)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0349/004.
