# 944 Market St

Block 0341, lot 006. Page: https://www.permitgraph.org/a/0341/006

- City's use: Commercial Office
- Built: 1907
- Stories: 8
- Rooms: 9 bathrooms
- Building: 42,822 sq ft
- Lot: 5,771 sq ft
- Zoning: C3G
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

66 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202511260498](https://www.permitgraph.org/p/202511260498) | Nov 26, 2025 | In progress: filed Nov 2025, not yet issued | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | 4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal. | $60,000 |
| [202507100523](https://www.permitgraph.org/p/202507100523) | Jul 10, 2025 | Completed: final sign-off Oct 2025 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as-built: removed 3 monitor modules and 3 duct detectors. was incorrectly placed on the basement floor where it should not have existed. duct detectors and corresponding monitor module (m248, m249 &… |  |
| [202309066010](https://www.permitgraph.org/p/202309066010) | Sep 6, 2023 | Completed: final sign-off Oct 2025 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as built to pa# 202109087471. replace existing annuciator w/new led graphic at the same location at the main entrance. tie in to existing control panel. no change in matrix and device location or cou… | $2,000 |
| [202303093397](https://www.permitgraph.org/p/202303093397) | Mar 9, 2023 | Never finaled: issued Jun 2023, no final | [948 Market St](https://www.permitgraph.org/a/0341/006) | [Esquivel Grading & Paving, Inc.](https://www.permitgraph.org/contractor/esquivel-grading-paving-inc-463185) | replace sub sidewalk basement roof slab affected by gtraffic signal poles and curb ramps | $300,000 |
| [202109087971](https://www.permitgraph.org/p/202109087971) | Sep 8, 2021 | Completed: final sign-off Oct 2025 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | (like for like) fire system replacement due to elevator modernization with new panel. smoke detectors and pull station same location. install relay modules and smoke detector for elev recall. tie in… | $24,000 |
| [202010297792](https://www.permitgraph.org/p/202010297792) | Oct 29, 2020 | Completed: final sign-off Jan 2021 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Aura Fire Safety Inc](https://www.permitgraph.org/contractor/aura-fire-safety-inc-966824) | provide adequate coverage and add (2) sprinkler side wall heads for bellow new soffit. refer to building plans # 2020-0122-2505 | $4,500 |
| [202007160332](https://www.permitgraph.org/p/202007160332) | Jul 16, 2020 | Expired or cancelled: cancelled Jan 2026 | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | change of use of (e) basement space from storage to retail | $567,000 |
| [202005077348](https://www.permitgraph.org/p/202005077348) | May 7, 2020 | Never finaled: issued Sep 2020, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | 5/f: install new branchlines off (e) fire sprinkler main & add install (37) fire sprinkler heads to acommodate new t.i. | $2,500 |
| [202005077350](https://www.permitgraph.org/p/202005077350) | May 7, 2020 | Never finaled: issued Nov 2021, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) | lobby: relocate (3) fire sprinkler heads to accommodate new t.i. basement elevatory lobby | $1,500 |
| [202001222505](https://www.permitgraph.org/p/202001222505) | Jan 22, 2020 | Never finaled: issued Jan 2020, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Block 12 Construction](https://www.permitgraph.org/contractor/block-12-construction-1033146) | interior t.i. for condo sales office extg handicapp restroom to remain. extg mezzanine to remain. no change to store front. | $175,000 |
| [M1172811](https://www.permitgraph.org/p/M1172811) | Dec 5, 2019 | Never finaled: issued Dec 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | street space with parking meters. |  |
| [201911258145](https://www.permitgraph.org/p/201911258145) | Nov 25, 2019 | Completed: final sign-off Apr 2020 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 3rd floor: exisitng fire sprinkler system. ti 1 added & 8 relocated sprinklers | $4,500 |
| [201910316094](https://www.permitgraph.org/p/201910316094) | Oct 31, 2019 | Completed: final sign-off Feb 2020 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) | 3/f: rev to pa# 201907125736; converting 1 radious wall from metal stud/sheetrock to intumescent covered plywood as detailed in the variance. maher n/a. |  |
| [201908290217](https://www.permitgraph.org/p/201908290217) | Aug 29, 2019 | Never finaled: issued Nov 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | alteration of hoistway of (2) passenger elevators, elevator #1 (e) basement winding drm equip. to be removed and replaced w/basement geared traction equipment, elevator #2 (e) bsement geared traction… | $140,000 |
| [M1127867](https://www.permitgraph.org/p/M1127867) | Aug 22, 2019 | Never finaled: issued Aug 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | street space |  |
| [M1123087](https://www.permitgraph.org/p/M1123087) | Aug 13, 2019 | Never finaled: issued Aug 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | street space |  |
| [201907236612](https://www.permitgraph.org/p/201907236612) | Jul 23, 2019 | Completed: final sign-off Aug 2019 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 3/f: fire alarm - install 4 wall strobes, 3 wall horn strobes, 1 ceiling strobe. relocate 1 wall hirn strobe, remove and reinstall 1 pull station. ref 201907125736 | $6,600 |
| [201907125736](https://www.permitgraph.org/p/201907125736) | Jul 12, 2019 | Completed: final sign-off Feb 2020 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) | 3rd flr - ti - int only. new finishes & furnishings throughout, new non structural partitions. demo men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work… | $149,000 |
| [201907024997](https://www.permitgraph.org/p/201907024997) | Jul 2, 2019 | Never finaled: issued Aug 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) | demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit. | $120,509 |
| [201901100022](https://www.permitgraph.org/p/201901100022) | Jan 10, 2019 | Expired or cancelled: cancelled Jan 2026 | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | temant improvement of (e) lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door. | $58,296 |
| [201705156613](https://www.permitgraph.org/p/201705156613) | May 15, 2017 | Completed: final sign-off May 2025 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Faith N Jason Construction Llc](https://www.permitgraph.org/contractor/faith-n-jason-construction-llc-992216) | install 13"x20.5" evacuation plan on ground floor. n/a for maher. | $100 |
| [201412053161](https://www.permitgraph.org/p/201412053161) | Dec 5, 2014 | Never finaled: issued Dec 2014, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 3/f: mep for modification and redistribution of existing air distribution system, ref 201407282305. compliance with maher ordinance 155-13 not required. | $7,500 |
| [201410219442](https://www.permitgraph.org/p/201410219442) | Oct 21, 2014 | Completed: final sign-off Aug 2016 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 3rd floor provide a modification of the existing fire alarm system: add (1) heat detector, (4) duct smoke detectors, (4) control relays, (1) power supply, (5) horn/strobes, (2) strobes. ref t.i. #201… | $10,664 |
| [201409105987](https://www.permitgraph.org/p/201409105987) | Sep 10, 2014 | Completed: final sign-off Sep 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) | remove 5 extg sprinklers and relocate 2 sprinklers on 3rd floor only. ti app#201407282305. n/a for the maher ordinance #155-13 | $1,000 |
| [201409055550](https://www.permitgraph.org/p/201409055550) | Sep 5, 2014 | Completed: final sign-off Feb 2015 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | remove and replace elevator lobby doors with new 1.5 hour rated doors at floors 3, 6, 7. | $30,000 |
| [201407292463](https://www.permitgraph.org/p/201407292463) | Jul 29, 2014 | Expired or cancelled: cancelled Jan 2026 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 3rd floor - demo of non-structural interior walls per ab-017. t.i . under separate permit. n/a maher orinance | $7,500 |
| [201407282305](https://www.permitgraph.org/p/201407282305) | Jul 28, 2014 | Completed: final sign-off May 2015 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 3/f - ti- full floor remodel incl. new partitions, m/w bathrroms, kitchenette, (3) offices & open desk space. mep, ls, and sprinklers on separate permits. entry door from stair/elevator lobby on sepa… | $200,000 |
| [201405286825](https://www.permitgraph.org/p/201405286825) | May 28, 2014 | Completed: final sign-off Jun 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | as built for pa#201405085238. n/a ordinance #155-13. added 3 duct smoke detectors and 3 control mods to shutdown 3 heat pumps. |  |
| [201405085238](https://www.permitgraph.org/p/201405085238) | May 8, 2014 | Completed: final sign-off Jun 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | add new fire alarm devices to existing fire alarm system in a new ti space on the 6th and 7th fl. 11 horn strobes, 4 strobes, 1 duct detector, 1 smoke detector, 1 booster panel, 4 control modules. ma… | $6,900 |
| [201405064979](https://www.permitgraph.org/p/201405064979) | May 6, 2014 | Never finaled: issued May 2014, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not required |  |
| [201404254187](https://www.permitgraph.org/p/201404254187) | Apr 25, 2014 | Completed: final sign-off May 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | modification & redistribution of existing air distribution system on the 7f. reference ti 2013.0920.7404 n/a ordinance #155-13 | $7,500 |
| [201404042448](https://www.permitgraph.org/p/201404042448) | Apr 4, 2014 | Completed: final sign-off Apr 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) | sprinkler ti. relocate (14) sprinkler on 6 floor only, ordinance #155-13 not required. | $5,000 |
| [201402289597](https://www.permitgraph.org/p/201402289597) | Feb 28, 2014 | Completed: final sign-off Mar 2025 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) | 7th floor:relocate 26 extg sprinkler heads on 7th floor only. t.i. app#201309207404. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13 | $7,000 |
| [201402198801](https://www.permitgraph.org/p/201402198801) | Feb 19, 2014 | Completed: final sign-off Jun 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | maher ord - extended not required. as builts 201310189692 |  |
| [201402188719](https://www.permitgraph.org/p/201402188719) | Feb 18, 2014 | Completed: final sign-off Feb 2016 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | remodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mech, plumbing, elec separate permit | $200,000 |
| [201312184505](https://www.permitgraph.org/p/201312184505) | Dec 18, 2013 | Completed: final sign-off Jan 2014 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | add 6 horn strobe and 2 strobe to an existing fa system in a new 4th floor t.i. space. t.i. pa#201306109059 | $6,200 |
| [201312184485](https://www.permitgraph.org/p/201312184485) | Dec 18, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 4th fl. mechanical work associated with pa#2013-0610-9059. | $25,000 |
| [201312184482](https://www.permitgraph.org/p/201312184482) | Dec 18, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 4th fl. revision to app#2013-0610-9059. revise (1) hour interior partitions to regular assembly not (1) hour assembly at offices# 1, 2 and 3. |  |
| [201310280364](https://www.permitgraph.org/p/201310280364) | Oct 28, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | revision to pa# 201209048834. revise 1 hr interior partitons to regular assembly. not 1 hour assembly |  |
| [201310189692](https://www.permitgraph.org/p/201310189692) | Oct 18, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | replace existing fire alarm panel with new panel due to notice of violation for panel in 'trouble' condition. all devices are 100% compatible. as-built drawings to be provided under a separate permit… | $8,700 |
| [201310169386](https://www.permitgraph.org/p/201310169386) | Oct 16, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | 8th floor-mechanical work associated with pa# 2012-0904-8834 | $25,000 |
| [201309207404](https://www.permitgraph.org/p/201309207404) | Sep 20, 2013 | Completed: final sign-off Feb 2016 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | demolition of interior non load bearing walls, new offices and support facilities. elec, life safety, plumbing, and sperinkler work sep permit | $279,000 |
| [201308265231](https://www.permitgraph.org/p/201308265231) | Aug 26, 2013 | Never finaled: issued Aug 2013, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) | relocate 15 e sprinkler heads and add 6 new heads on 4th fl only | $10,000 |
| [201306109059](https://www.permitgraph.org/p/201306109059) | Jun 10, 2013 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | interior remodel of the 4th floor office space. plumbing, electrical, and fire sprinkler under seperate application. | $100,000 |
| [201303202657](https://www.permitgraph.org/p/201303202657) | Mar 20, 2013 | Never finaled: issued Mar 2013, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | relocate 5 horn strobes on 8th floor only. | $2,750 |
| [201210192484](https://www.permitgraph.org/p/201210192484) | Oct 19, 2012 | Completed: final sign-off Mar 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) | 8th floor-relocate 11 (e) sprinkler heads & remove 24 drop sprinklers from (e) pendent heads. ti pa# 2012-1011-1889 | $5,000 |
| [201210111889](https://www.permitgraph.org/p/201210111889) | Oct 11, 2012 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | demo (e) wall paneling. replace w/ sheetrock where needed. demo (e) floor tile, install new floor tile, paint throughout lobby. all electrical, mechanical, plumbing & fire under separate application. | $25,000 |
| [201209048834](https://www.permitgraph.org/p/201209048834) | Sep 4, 2012 | Completed: final sign-off Dec 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | interior remodel of 8th fl office space, plumbing and electric under separate application | $100,000 |
| [201109134473](https://www.permitgraph.org/p/201109134473) | Sep 13, 2011 | Completed: final sign-off Dec 2011 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) | remove e partition at suite 400 office space. provide new kitchenette cabinetry and sink. minor work at toilet room grab bar. elevator door jamb marking | $5,000 |
| [201108233037](https://www.permitgraph.org/p/201108233037) | Aug 23, 2011 | Completed: final sign-off Nov 2011 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Western Awnings And Canvas](https://www.permitgraph.org/contractor/western-awnings-and-canvas-821977) | install one canvas banner on left side of building entrance | $1,310 |
| [201103081583](https://www.permitgraph.org/p/201103081583) | Mar 8, 2011 | Never finaled: issued Mar 2011, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Carroll Commercial Inc](https://www.permitgraph.org/contractor/carroll-commercial-inc-906535) | unit #944:install concrete vault room.revision to app#201101279149 |  |
| [201101279149](https://www.permitgraph.org/p/201101279149) | Jan 27, 2011 | Expired or cancelled: expired Apr 2013 | [948 Market St](https://www.permitgraph.org/a/0341/006) | [Carroll Commercial Inc](https://www.permitgraph.org/contractor/carroll-commercial-inc-906535) | install security safe. provide steel shoring structure with footings for safe. | $10,000 |
| [201101258954](https://www.permitgraph.org/p/201101258954) | Jan 25, 2011 | Expired or cancelled: expired Apr 2013 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Carroll Commercial Inc](https://www.permitgraph.org/contractor/carroll-commercial-inc-906535) | ti to convert (e) retail space to new retail space. add new unisex restroom and office at retail soace at ground floor. no change to (e) exterior of building. | $50,000 |
| [201012287463](https://www.permitgraph.org/p/201012287463) | Dec 28, 2010 | Completed: final sign-off Feb 2011 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Carroll Commercial Inc](https://www.permitgraph.org/contractor/carroll-commercial-inc-906535) | partial wall demolition. non structural. | $1,800 |
| [201002096210](https://www.permitgraph.org/p/201002096210) | Feb 9, 2010 | Completed: final sign-off Mar 2010 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Western Awnings And Canvas](https://www.permitgraph.org/contractor/western-awnings-and-canvas-821977) | install one double-faced fabric banner. | $780 |
| [200912153234](https://www.permitgraph.org/p/200912153234) | Dec 15, 2009 | Completed: final sign-off Feb 2010 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | install new fire alarm devices in new ti space. device will be added to an existing fa system. includes 16 strobes, 5 horn strobes, 1 booster power supply, and 1 smoke detector | $6,200 |
| [200909156865](https://www.permitgraph.org/p/200909156865) | Sep 15, 2009 | Completed: final sign-off Feb 2010 | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | 2nd floor t.i. upgrade o fthe existing fire sprinkelr sytem. relocate 44 heads & delete 7 heads. | $12,000 |
| [200908275661](https://www.permitgraph.org/p/200908275661) | Aug 27, 2009 | Completed: final sign-off Jan 2010 | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd fl office ti. (demo under 2009.08.24.5410). new non struc partitions. all new revised hvac, elec, plbg, life safety under separate permit. builiding not fully sprinklered | $220,000 |
| [200908245410](https://www.permitgraph.org/p/200908245410) | Aug 24, 2009 | Expired or cancelled: cancelled Jan 2026 | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | demo of non-struc. partitions at 2nd floor.. t.i under separate permit. bldg is not fully sprinklered | $250,000 |
| [M81904](https://www.permitgraph.org/p/M81904) | Aug 14, 2007 | Never finaled: issued Aug 2007, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) |  | street space permit |  |
| [200608149411](https://www.permitgraph.org/p/200608149411) | Aug 14, 2006 | Expired or cancelled: expired Feb 2008 | [948 Market St](https://www.permitgraph.org/a/0341/006) |  | revision to 200604148986 and 200605252478. existing handicaped mens restroom on 2nd floor. existing handicapped womens restroom 4th floor |  |
| [200607146645](https://www.permitgraph.org/p/200607146645) | Jul 14, 2006 | Expired or cancelled: expired Feb 2008 | [948 Market St](https://www.permitgraph.org/a/0341/006) | [Bay Fire Protection](https://www.permitgraph.org/contractor/bay-fire-protection-657201) | add sprinkler in closet | $500 |
| [200605252478](https://www.permitgraph.org/p/200605252478) | May 25, 2006 | Expired or cancelled: expired Feb 2008 | [948 Market St](https://www.permitgraph.org/a/0341/006) |  | interior remodeling for a retail shoes store on ground level. shelving partitions/doors. no work on mezzanie. submit seperate fire sprinkler permit. revision to app building permit app #200604148986 |  |
| [200604148986](https://www.permitgraph.org/p/200604148986) | Apr 14, 2006 | Expired or cancelled: expired Feb 2008 | [948 Market St](https://www.permitgraph.org/a/0341/006) |  | interior remodeling for a retail (shoe) store (ground floor) partial height partitions/doors - no work on mezzanine. submit seperate fire sprinkler permit. | $60,000 |
| [200407290084](https://www.permitgraph.org/p/200407290084) | Jul 29, 2004 | Never finaled: issued Jul 2004, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | [Acker & Guerrero Roof Co](https://www.permitgraph.org/contractor/acker-guerrero-roof-co-610561) | reroofing | $10,000 |
| [200105179392](https://www.permitgraph.org/p/200105179392) | May 17, 2001 | Expired or cancelled: expired Sep 2001 | [948 Market St](https://www.permitgraph.org/a/0341/006) |  | to install 34" max ht x 36" counter space in accord sfbc112b.4 & b.2.1 except 3.6 at crepe n java | $1,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [P 3 Construction & Remodeling Inc](https://www.permitgraph.org/contractor/p-3-construction-remodeling-inc-957103) (16), [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) (5), [Madden Plumbing, Llc](https://www.permitgraph.org/contractor/madden-plumbing-llc-825418) (5), [Carroll Commercial Inc](https://www.permitgraph.org/contractor/carroll-commercial-inc-906535) (4), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) (3), [Charles Pankow Builders Ltd](https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972) (2), [H & M Fire Protection, Inc.](https://www.permitgraph.org/contractor/h-m-fire-protection-inc-955126) (2), [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) (2), [Western Awnings And Canvas](https://www.permitgraph.org/contractor/western-awnings-and-canvas-821977) (2), [Acker & Guerrero Roof Co](https://www.permitgraph.org/contractor/acker-guerrero-roof-co-610561), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Aura Fire Safety Inc](https://www.permitgraph.org/contractor/aura-fire-safety-inc-966824), [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906), [Bay Fire Protection](https://www.permitgraph.org/contractor/bay-fire-protection-657201), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772), [Block 12 Construction](https://www.permitgraph.org/contractor/block-12-construction-1033146), [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931), [Esquivel Grading & Paving, Inc.](https://www.permitgraph.org/contractor/esquivel-grading-paving-inc-463185), [Faith N Jason Construction Llc](https://www.permitgraph.org/contractor/faith-n-jason-construction-llc-992216), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218)
- Architects: [Benjamin Farrell](https://www.permitgraph.org/professional/benjamin-farrell-C29919) (2), [William Duff Jr](https://www.permitgraph.org/professional/william-duff-jr-C26772) (2), [Aston Pereira](https://www.permitgraph.org/professional/aston-pereira-C12756), [Chang H. Lee](https://www.permitgraph.org/professional/chang-h-lee-C29380), [David Plotkin](https://www.permitgraph.org/professional/david-plotkin-C28346), [James Howard Westover](https://www.permitgraph.org/professional/james-howard-westover-C21728), [Metro Power Engineers](https://www.permitgraph.org/professional/metro-power-engineers-E16739), [Michael Steiner](https://www.permitgraph.org/professional/michael-steiner-C31950), [Robert J Lara](https://www.permitgraph.org/professional/robert-j-lara-C30334)
- Engineers: [George Arellano](https://www.permitgraph.org/professional/george-arellano-M29691) (3), [Antonio Mortera](https://www.permitgraph.org/professional/antonio-mortera-E16739), [Erevan O'neil](https://www.permitgraph.org/professional/erevan-o-neil-C75459), [Ophelia Lau](https://www.permitgraph.org/professional/ophelia-lau-C71393)
- Designers: [Michael Williams](https://www.permitgraph.org/professional/michael-williams-806216)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0341/006.
